IP Library Granted Patent US 10,022,931
Granted Patent B2
US 10,022,931 · App. 14/435,879 · Granted Jul 17, 2018

Arrangement and method for handling a load for isostatic pressure treatment

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,022,931
App. No.
14/435,879
Granted
Jul 17, 2018
Kind
B2
Abstract

There is provided an arrangement and a method for handling a load for isostatic pressure treatment in a high-pressure arrangement. The arrangement includes a transportation unit including at least one track for transporting the load into a treatment position for isostatic pressure treatment of the load from a working space outside the high-pressure arrangement. Furthermore, the transportation unit is further arranged for transporting the load from the treatment position to the working space after pressure treatment of the load. The arrangement further includes a partition plane arranged at least partially above the high-pressure arrangement, wherein the working space is provided above the partition plane. The partition plane is arranged to shield the working space from the high-pressure arrangement in the event of a gas leakage of the high-pressure arrangement.

Claims (46)

1. An arrangement for handling a load for isostatic pressure treatment in a high-pressure arrangement, comprising:

a horizontal partition plane including at least one opening and being arranged at least partially above the high-pressure arrangement, the partition plane defining a working space outside the high-pressure arrangement and at least partially separating the working space from the high-pressure arrangement, wherein the working space is provided above the partition plane and wherein the partition plane is arranged to shield the working space from the high-pressure arrangement in the event of a gas leakage of the high-pressure arrangement; and

a transportation unit including

a lifting arrangement provided in the working space, wherein the lifting arrangement includes a lifting device to lift the load and at least one track in the working space for transporting the lifting device, wherein the arrangement is configured to transport the load in the working space on the at least one track and to transport the load through the at least one opening of the partition plane, and

at least one track under the partition plane for transporting the load into a treatment position,

wherein the at least one track in the working space is aligned with the at least one track under the partition plane, and wherein the transportation unit is configured to transport the load in a vertical plane from the working space into a treatment position before pressure treatment of the load, and from the treatment position to the working space after pressure treatment of the load.

2. The arrangement according to claim 1 , wherein the transportation unit is configured to transport an equipment unit on the at least one track, wherein the equipment unit comprises one or more of the group consisting of a pressure vessel for holding a load for isostatic pressure treatment, a power transformer unit, and a compressor unit.

3. The arrangement according to claim 2 , further comprising at least one lid for at least partially closing the at least one opening.

4. A control system, comprising

the arrangement according to claim 2 , and

at least one controller for controlling the arrangement automatically.

5. A pressure system, comprising

the arrangement according to claim 2 ,

a load for isostatic pressure treatment, and

a force-absorbing press frame for isostatic pressure treatment of the load.

6. The arrangement according to claim 1 , further comprising at least one lid for at least partially closing the at least one opening.

7. A control system, comprising

the arrangement according to claim 6 , and

at least one controller for controlling the arrangement automatically.

8. A pressure system, comprising

the arrangement according to claim 6 ,

a load for isostatic pressure treatment, and

a force-absorbing press frame for isostatic pressure treatment of the load.

9. A control system, comprising

the arrangement according to claim 1 , and

at least one controller for controlling the arrangement automatically.

10. A pressure system, comprising

the arrangement according to claim 1 ,

a load for isostatic pressure treatment, and

a force-absorbing press frame for isostatic pressure treatment of the load.

11. The pressure system according to claim 10 , further comprising an-equipment unit for use in the arrangement, wherein the equipment unit comprises one or more of the group consisting of a pressure vessel for holding a load for isostatic pressure treatment, a power transformer unit, and a compressor unit.

12. The pressure system according to claim 11 , wherein the equipment unit comprises a pressure vessel for holding the load for isostatic pressure treatment and a lid for the pressure vessel, wherein the pressure system further comprises a lifting device configured to put the lid onto the pressure vessel before pressure treatment of the load, and configured to remove the lid from the pressure vessel after pressure treatment of the load.

13. The pressure system according to claim 10 , further comprising at least one controller for controlling the arrangement automatically.

14. A method for handling a load for isostatic pressure treatment in a high-pressure arrangement, wherein the method comprises the steps of:

providing a horizontal partition plane comprising at least one opening and being arranged at least partially above the high-pressure arrangement, the partition plane defining a working space outside the high-pressure arrangement and at least partially separating the working space from the high-pressure arrangement, wherein the working space is provided above the partition plane,

transporting a load in the working space on at least one track,

transporting the load through the at least one opening of the partition plane, and

transporting the load on at least one track under the partition plane into a treatment position,

wherein the at least one track in the working space is aligned with the at least one track under the partition plane and wherein the load is transported in a vertical plane from the working space into a treatment position before pressure treatment of the load, and from the treatment position to the working space after pressure treatment of the load, and

shielding the working space from the high pressure arrangement by means of the partition plane in the event of a gas leakage of the high pressure arrangement.

15. The method according to claim 14 , further comprising the step of:

transporting an equipment unit on the at least one track, wherein the equipment unit comprises one or more of the group consisting of a pressure vessel, a power transformer, a compressor, and a pressure intensifier.

16. The method according to claim 15 , wherein at least one step is controlled automatically.

17. The method according to claim 16 , wherein all steps are controlled automatically.

18. The method according to claim 14 , wherein at least one step is controlled automatically.

19. The method according to claim 18 , wherein all steps are controlled automatically.

Assignments (2)
CHANGE OF NAME Recorded Aug 18, 2016
From: AVURE TECHNOLOGIES AB
To: QUINTUS TECHNOLOGIES AB
Reel/Frame 039723/0723 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 13, 2015
From: THUNHOLM, ROGER; ERIKSSON, ASA; EKLUND, ANDERS
To: AVURE TECHNOLOGIES AB
Reel/Frame 035630/0120 →