IP Library Granted Patent US 9,428,876
Granted Patent B2
US 9,428,876 · App. 14/438,208 · Granted Aug 30, 2016

Multi-suction-pile anchor and flat plate anchor having suction piles

Inventors: O Soon Kwon (Suwon-si, KR); Myoung Hak Oh (Yongin-si, KR); In Sung Jang (Gwangmyeong-si, KR)
Assignee: KOREA INSTITUTE OF OCEAN SCIENCE & TECHNOLOGY
E02D13/00E02D7/00E02D13/04E02D27/12E02D27/52E02D31/08
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,428,876
App. No.
14/438,208
Granted
Aug 30, 2016
Kind
B2
Abstract

A multi-suction pile anchor and a plate anchor for mooring a marine structure, comprises a plurality of suction piles connected in parallel with the same capacity penetrates into the sea floor, wherein a pullout resistance required for mooring the marine structure is applied by changing the number of suction piles, and wherein a plurality of suction piles is connected each other with a connecting plate to increase a lateral resistance.

Claims (7)

1. A method for constructing a multi-suction pile anchor, comprising:

a step of setting a number of suction piles according to a pullout resistance demanded for mooring a marine structure;

a suction pile parallel-arrangement step of arranging the suction piles in parallel;

a suction pile fixing step of integrally coupling a coupling plate to the suction piles, so that the suction piles are integrated;

a suction pile position fixing step of placing the assembled suction piles on a sea floor to penetrate to a predetermined depth by a weight thereof;

a suction pile penetration step of pumping water out from a hollow inside of the suction piles through a drainage hole for a suction pressure so that the suction piles penetrate into the sea floor with a designed depth by the suction pressure; and

a marine structure restraining step of connecting a connecting cable connected to the coupling plate, to the marine structure for mooring the marine structure, after the suction piles have entirely penetrated into the sea floor.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 23, 2015
From: KWON, O SOON; OH, MYOUNG HAK; JANG, IN SUNG
To: KOREA INSTITUTE OF OCEAN SCIENCE & TECHNOLOGY
Reel/Frame 035485/0097 →
Priority Claims (2)
KR 10-2013-0069674 · Jun 18, 2013 · national
KR 10-2014-0027284 · Mar 7, 2014 · national
Continuity (1)
Related Publication 20150275461A1 · Oct 1, 2015