IP Library Granted Patent US 10,765,976
Granted Patent B2
US 10,765,976 · App. 14/442,807 · Granted Sep 8, 2020

Open bottom multiple channel gas delivery device for immersed membranes

Inventors: Gavin James Boyle (Oakville, CA); Zamir Alam (Oakville, CA); Reid Bayly (Oakville, CA); Michael David Theodoulou (Milton, CA); Hongde Zhou (Guelph, CA)
Assignee: BL TECHNOLOGIES, INC.
B01D29/66B01D61/20B01D61/22B01D63/02B01D65/08B01D65/02B01D2313/26B01D2315/20B01D2321/04B01D2321/185B01F3/04241C02F1/444C02F1/727C02F1/74C02F1/78C02F2303/14
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,765,976
App. No.
14/442,807
Granted
Sep 8, 2020
Kind
B2
Abstract

A method of air scouring an immersed membrane is described in this specification. The method comprising a step of adjusting one or more aeration parameters: between successive permeation, back pulse or relaxation cycles; during a permeation cycle; or, between a permeation cycle and a backpulse or relaxation cycle.

Claims (24)

1. A method of air scouring an immersed membrane comprising adjusting one or more aeration parameters: between successive permeation, backpulse or relaxation cycles; during a permeation cycle; or between a permeation cycle and a backpulse or relaxation cycle wherein air scouring during the backpulse or relaxation cycle comprises releasing a series of bursts of bubbles;

wherein aeration is provided by a gas delivery device comprising:

a manifold adapted to be connected to a source of a pressurized gas; and

a plurality of open-bottomed channels, each of the plurality of channels having a single outlet and being in fluid communication with the manifold through a distinct associated port.

2. A method of air scouring an immersed membrane comprising adjusting one or more aeration parameters: between successive permeation, backpulse or relaxation cycles; during a permeation cycle; or between a permeation cycle and a backpulse or relaxation cycle wherein air scouring during the backpulse or relaxation cycle comprises releasing a series of bursts of bubbles;

wherein aeration is provided by a gas delivery device comprising:

a distribution plenum adapted to be connected to a source of a pressurized gas; and,

a plurality of channels, each of the plurality of channels being in fluid communication with the distribution plenum through a distinct associated port, each of the plurality of channels having an outlet at the end of the channel adapted to discharge gas,

wherein the ports have a smaller area than the channels and the ports are located close together relative to a variation in the lengths of the channels.

3. A method of air scouring an immersed membrane comprising adjusting one or more aeration parameters: between successive permeation, backpulse or relaxation cycles; during a permeation cycle; or between a permeation cycle and a backpulse or relaxation cycle wherein air scouring during the backpulse or relaxation cycle comprises releasing a series of bursts of bubbles;

and further comprising:

bringing a flow of pressurized gas into a tank to a manifold near or below the bottom of a membrane module;

splitting the flow of pressurized gas into multiple flows of pressurized gas extending from the manifold;

directing each of the multiple flows of pressurized gas to a different lateral position, such that each of the multiple flows of pressurized travel a different distance from the manifold; and

releasing bubbles from the different lateral positions.

4. The method of claim 1 , wherein an aeration flow rate is varied between successive permeation cycles.

5. The method of claim 1 , wherein air scouring during the permeation cycle comprises releasing a series of bursts of bubbles and an aeration flow rate is increased during a backpulse or relaxation cycle relative to the aeration flow rate during a preceding permeation cycle.

6. The method of claim 1 , wherein an aeration flow rate is increased within a permeation cycle.

7. The method of claim 1 , wherein aeration is provided intermittently during a permeation cycle.

8. The method of claim 1 , wherein aeration is provided only during a backpulse or a relaxation cycle.

9. The method of claim 1 , wherein a continuous or instantaneous aeration flow rate increases generally linearly over time during a permeation cycle.

10. The method of claim 2 , wherein an aeration flow rate is varied between successive permeation cycles.

11. The method of claim 2 , wherein air scouring during the permeation cycle comprises releasing a series of bursts of bubbles and an aeration flow rate is increased during a backpulse or relaxation cycle relative to the aeration flow rate during a preceding permeation cycle.

12. The method of claim 2 , wherein an aeration flow rate is increased within a permeation cycle.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 12, 2018
From: GENERAL ELECTRIC COMPANY
To: BL TECHNOLOGIES, INC.
Reel/Frame 047502/0065 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 14, 2015
From: BOYLE, GAVIN JAMES; ALAM, ZAMIR; BAYLY, REID; THEODOULOU, MICHAEL DAVID; ZHOU, HONGDE
To: GENERAL ELECTRIC COMPANY
Reel/Frame 035638/0506 →