IP Library Granted Patent US 9,523,419
Granted Patent B2
US 9,523,419 · App. 14/457,527 · Granted Dec 20, 2016

Pre-stressed torque converter shell

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,523,419
App. No.
14/457,527
Granted
Dec 20, 2016
Kind
B2
Abstract

A method for manufacturing a torque converter shell is provided to induce favorable residual stress in a direction of a loading condition to improve durability during cycle pressurization. The method includes inducing favorable residual stress on a front cover, an impeller shell, or both the front cover and the impeller shell to improve the durability of these components. The induced residual stresses reduce the stress experienced by these components during operation. The front cover and impeller shell are welded together to form the torque converter shell.

Claims (17)

1. A method for manufacturing a torque converter shell, comprising:

forming a front cover of the torque converter shell from sheet metal to a first near net shape by plastic deformation in a first direction of the front cover;

forming an impeller shell of the torque converter shell from sheet metal to a second near net shape by plastic deformation in a first direction of the impeller shell;

at least one of (a) plastically deforming the front cover past the first near net shape in a direction of an operating stress that is opposite from the first direction of the front cover and creating a first residual compressive stress in the torque converter shell after formation of the front cover, or (b) plastically deforming the impeller shell past the second near net shape in a direction of an operating stress that is opposite from the first direction of the impeller shell and creating a second residual compressive stress in the torque converter shell after formation of the impeller shell; and

welding the front cover to the impeller shell.

2. The method for manufacturing a torque converter shell according to claim 1 , wherein at least a radially outer region of the front cover is plastically deformed.

3. The method for manufacturing a torque converter shell according to claim 1 , wherein the front cover and the impeller shell are formed by stamping.

4. The method for manufacturing a torque converter shell according to claim 1 , wherein at least a hub region of the impeller shell is plastically deformed.

5. A method for manufacturing a torque converter shell, comprising:

forming a front cover of the torque converter shell from sheet metal to a first near net shape;

forming an impeller shell of the torque converter shell from sheet metal to a second near net shape;

welding the front cover to the impeller shell; and

supplying a hydraulic pressure that is greater than an operating pressure to a cavity defined by the front cover and the impeller shell and over-stressing the torque converter shell, supporting the front cover such that the front cover plastically deforms past the first near net shape in a direction of the operating pressure, and supporting the impeller shell such that the impeller shell plastically deforms past the second near net shape in the direction of the operating pressure, such that a first residual compressive stress remains in the front cover and a second residual compressive stress remains in the impeller shell.

6. The method for manufacturing a torque converter shell according to claim 5 , wherein a hub region of the front cover is supported such that at least a radially outer region of the front cover plastically deforms.

7. The method for manufacturing a torque converter shell according to claim 5 , wherein a radially outer region of the impeller shell is supported such that at least a hub region of the impeller shell plastically deforms.

8. The method for manufacturing a torque converter shell according to claim 5 , wherein the hydraulic pressure applied to the cavity is approximately 30-45 bar.

9. The method for manufacturing a torque converter shell according to claim 5 , wherein the hydraulic pressure is applied for approximately 10 seconds.

Assignments (4)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 21, 2017
From: SMITH, DAVID R.; MAENLE, WILLIAM C.
To: UNVERFERTH MANUFACTURING COMPANY, INC.
Reel/Frame 044460/0035 →
CORRECTIVE ASSIGNMENT TO CORRECT THE PROPERTY NUMBERS PREVIOUSLY RECORDED ON REEL 037732 FRAME 0347. ASSIGNOR(S) HEREBY CONFIRMS THE APP. NO. 14/553248 SHOULD BE APP. NO. 14/553258. Recorded Oct 11, 2016
From: SCHAEFFLER TECHNOLOGIES GMBH & CO. KG
To: SCHAEFFLER TECHNOLOGIES AG & CO. KG
Reel/Frame 040404/0530 →
CHANGE OF NAME Recorded Feb 5, 2016
From: SCHAEFFLER TECHNOLOGIES GMBH & CO. KG
To: SCHAEFFLER TECHNOLOGIES AG & CO. KG
Reel/Frame 037732/0347 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 10, 2014
From: JIMENEZ, ALFREDO; COPELAND, JAMES
To: SCHAEFFLER TECHNOLOGIES GMBH & CO. KG
Reel/Frame 034132/0912 →