IP Library Granted Patent US 10,153,954
Granted Patent B2
US 10,153,954 · App. 14/458,974 · Granted Dec 11, 2018

Inferring physical layer connection status of generic cables from planned single-end connection events

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,153,954
App. No.
14/458,974
Granted
Dec 11, 2018
Kind
B2
Abstract

A work order is generated. The work order comprises a first work order step specifying that a port of a first network element is to be connected to a port of a second network element using a cable. The first and second network elements are configured to detect when connections are made at the specified ports of the first network element and the second network element. A management system is configured to update information it maintains to indicate that there is a connection between the specified port of the first network element and the specified port of the second network element if connections made at the specified ports of the first and second network elements are detected during a period in which the first work order step of the first work order is expected to be performed. A similar technique can be used for disconnecting a cable.

Claims (112)

1. A method comprising:

generating a first work order comprising a first work order step specifying that a port of a first network element is to be connected to a port of a second network element using a cable;

detecting, using the first network element, when a connection is made at the specified port of the first network element;

detecting, using the second network element, when a connection is made at the specified port of the second network element; and

if the first network element detects the connection made at the specified port of the first network element during a period in which the first work order step of the first work order was expected to be performed and the second network element detects the connection made at the specified port of the second network element during the period in which the first work order step of the first work order was expected to be performed, updating a management system to indicate that the specified port of the first network element is connected to the specified port of the second network element.

2. The method of claim 1 , further comprising:

if after connecting the specified port of the first network element to the specified port of the second network element using the cable:

generating a second work order comprising a second work order step specifying that the specified port of the first network element is to be disconnected from the specified port of the second network element;

detecting, using the first network element, when a disconnection is made at the specified port of the first network element;

detecting, using the second network element, when a disconnection is made at the specified port of the second network element; and

if the first network element detects the disconnection made at the specified port of the first network element during a second period in which the second work order step of the second work order was expected to be performed and the second network element detects the disconnection made at the specified port of the second network element during the second period in which the second work order step of the second work order was expected to be performed, updating a management system to indicate that the specified port of the first network element is not connected to the specified port of the second network element.

3. The method of claim 1 , wherein the cable comprises an unmanaged cable.

4. The method of claim 1 , wherein the cable comprises at least one of a fiber optic cable and a copper cable.

5. The method of claim 1 , wherein the first network element and the second network element comprise first and second managed network elements, respectively.

6. The method of claim 1 , wherein the first and second network elements comprise at least one of a patch panel, an optical distribution frame, a splitter tray, a switch, and a router.

7. The method of claim 1 , wherein each of the first and second network elements includes at least one of EEPROM-based PLM technology and RFID PLM technology.

8. A method of identifying a disconnecting of a specified port of a first network element from a specified port of a second network element, the method comprising:

if after the port of the first network element is connected to the port of the second network element using a cable:

generating a first work order comprising a first work order step specifying that the port of the first network element is to be disconnected from the port of the second network element;

detecting, using the first network element, when a disconnection is made at the specified port of the first network element;

detecting, using the second network element, when a disconnection is made at the specified port of the second network element; and

if the first network element detects the disconnection made at the specified port of the first network element during a period in which the first work order step of the first work order was expected to be performed and the second network element detects the disconnection made at the specified port of the second network element during the period in which the first work order step of the first work order was expected to be performed, updating a management system to indicate that the specified port of the first network element is not connected to the specified port of the second network element.

9. A system comprising:

a first network element comprising at least one port, wherein the first network element is configured to detect when a cable is connected to the port of the first network element;

a second network element comprising at least one port, wherein the second network element is configured to detect when a cable is connected to the port of the second network element; and

a management system communicatively coupled to the first network element and the second network element;

wherein the management system is configured to generate a first work order comprising a first work order step specifying that the port of the first network element is to be connected to the port of the second network element using a cable; and

wherein the management system is configured to update information maintained by the management system to indicate that the specified port of the first network element is connected to the specified port of the second network element if the management system receives a message indicating that a connection was detected at the specified port of the first network element during a period in which the first work order step of the first work order is expected to be performed and receives a message indicating that a connection was detected at the specified port of the second network element during the period in which the first work order step of the first work order was expected to be performed.

10. The system of claim 9 , wherein the management system is configured to generate a second work order comprising a second work order step specifying that the port of the first network element is to be disconnected from the port of the second network element;

wherein the first network element is configured to detect when a disconnection is made at the specified port of the first network element;

wherein the second network element is configured to detect when a disconnection is made at the specified port of the second network element; and

wherein the management system is configured to update information maintained by the management system to indicate that the specified port of the first network element has been disconnected from the specified port of the second network element if the management system receives a message indicating that the disconnection was detected at the specified port of the first network element during a period in which the second work order step of the second work order was expected to be performed and receives a message indicating that the disconnection was detected at the specified port of the second network element during the period in which the second work order step of the second work order was expected to be performed.

11. The system of claim 9 , wherein the cable comprises an unmanaged cable.

12. The system of claim 9 , wherein the cable comprises at least one of a fiber optic cable and a copper cable.

13. The system of claim 9 , wherein the first network element and the second network element comprise first and second managed network elements, respectively.

14. The system of claim 9 , wherein the first and second network elements comprise at least one of a patch panel, an optical distribution frame, a splitter tray, a switch, and a router.

15. The system of claim 9 , wherein each of the first and second network elements includes at least one of EEPROM-based PLM technology and RFID PLM technology.

16. The system of claim 9 , wherein the management system is configured to send the first work order to a mobile device.

17. A system comprising:

a first network element comprising at least one port, wherein the first network element is configured to detect when a cable is disconnected from the port of the first network element;

a second network element comprising at least one port, wherein the second network element is configured to detect when a cable is disconnected from the port of the second network element; and

a management system communicatively coupled to the first network element and the second network element;

wherein the management system is configured to generate a first work order comprising a first work order step specifying that the port of the first network element is to be disconnected from the port of the second network element; and

wherein the management system is configured to update information maintained by the management system to indicate that the specified port of the first network element has been disconnected from the specified port of the second network element if the management system receives a message indicating that a disconnection was detected at the specified port of the first network element during a period in which the first work order step of the first work order was expected to be performed and receives a message indicating that a disconnection was detected at the specified port of the second network element during the period in which the first work order step of the first work order was expected to be performed.

18. A program product for identifying a connecting of a specified port of a first network element and a specified port of a second network element, tangibly stored on a non-transitory storage medium, comprising instructions operable to cause at least one programmable processor to:

generate a work order comprising a work order step specifying that the specified port of the first network element is to be connected to the specified port of the second network element using a cable;

in connection with a connection being made at the specified port of the first network element, receiving information indicating that the connection has been made at the specified port of the first network element;

in connection with a connection being made at the specified port of the second network element, receiving information indicating that the connection has been made at the specified port of the second network element; and

if information is received indicating that the connection has been made at the specified port of the first network element during a period in which the work order step of the work order is expected to be performed and information is received indicating that the connection has been made at the specified port of the second network element during the period in which the work order step of the work order is expected to be performed, updating connection information for the first network element and the second network element to indicate that the specified port of the first network element is connected to the specified port of the second network element.

19. The program product of claim 18 , wherein the instructions are further operable to cause the at least one programmable processor to:

generate a second work order comprising a second work order step specifying that the specified port of the first network element is to be disconnected from the specified port of the second network element;

in connection with a disconnection being made at the specified port of the first network element, receiving information indicating that the disconnection has been made at the specified port of the first network element;

in connection with a disconnection being made at the specified port of the second network element, receiving information indicating that the disconnection has been made at the specified port of the second network element; and

if information is received indicating that the disconnection has been made at the specified port of the first network element during a period in which the second work order step of the second work order was expected to be performed and information is received indicating that the disconnection has been made at the specified port of the second network element during the period in which the second work order step of the second work order was expected to be performed, updating connection information for the first network element and the second network element to indicate that the specified port of the first network element is disconnected from the specified port of the second network element.

20. The program product of claim 18 , wherein the instructions are further operable to cause the at least one programmable processor to:

send the first work order to a mobile device.

21. A method comprising:

generating a first work order comprising a first work order step specifying that a port of a first network element is to be connected to a port of a second network element using a cable;

detecting, using the first network element, that a connection has been made at the specified port of the first network element;

detecting, using the second network element, that a connection has been made at the specified port of the second network element; and

if the first network element detects the connection made at the specified port of the first network element during a period in which the first work order step of the first work order was expected to be performed and the second network element detects the connection made at the specified port of the second network element during the period in which the first work order step of the first work order was expected to be performed, updating a management system to indicate that the specified port of the first network element is connected to the specified port of the second network element.

22. The method of claim 21 , further comprising:

if after connecting the specified port of the first network element to the specified port of the second network element using the cable:

generating a second work order comprising a second work order step specifying that the specified port of the first network element is to be disconnected from the specified port of the second network element;

detecting, using the first network element, that a disconnection has been made at the specified port of the first network element;

detecting, using the second network element, that a disconnection has been made at the specified port of the second network element; and

if the first network element detects that the disconnection has been made at the specified port of the first network element during a second period in which the second work order step of the second work order was expected to be performed and the second network element detects that the disconnection has been made at the specified port of the second network element during the second period in which the second work order step of the second work order was expected to be performed, updating a management system to indicate that the specified port of the first network element is not connected to the specified port of the second network element.

23. The method of claim 21 , wherein the cable comprises an unmanaged cable.

24. The method of claim 21 , wherein the cable comprises at least one of a fiber optic cable and a copper cable.

25. The method of claim 21 , wherein the first network element and the second network element comprise first and second managed network elements, respectively.

26. The method of claim 21 , wherein the first and second network elements comprise at least one of a patch panel, an optical distribution frame, a splitter tray, a switch, and a router.

27. The method of claim 21 , wherein each of the first and second network elements includes at least one of EEPROM-based PLM technology and RFID PLM technology.

28. A method of identifying a disconnecting of a specified port of a first network element from a specified port of a second network element, the method comprising:

if after the port of the first network element is connected to the port of the second network element using a cable:

generating a first work order comprising a first work order step specifying that the port of the first network element is to be disconnected from the port of the second network element;

detecting, using the first network element, that a disconnection has been made at the specified port of the first network element;

detecting, using the second network element, that a disconnection has made at the specified port of the second network element; and

if the first network element detects that the disconnection has been made at the specified port of the first network element during a period in which the first work order step of the first work order was expected to be performed and the second network element detects that the disconnection has been made at the specified port of the second network element during the period in which the first work order step of the first work order was expected to be performed, updating a management system to indicate that the specified port of the first network element is not connected to the specified port of the second network element.

29. A system comprising:

a first network element comprising at least one port, wherein the first network element is configured to detect that a respective cable connector has been connected to the port of the first network element;

a second network element comprising at least one port, wherein the second network element is configured to detect that a respective cable connector has been connected to the port of the second network element; and

a management system communicatively coupled to the first network element and the second network element;

wherein the management system is configured to generate a first work order comprising a first work order step specifying that the port of the first network element is to be connected to the port of the second network element using a cable; and

wherein the management system is configured to update information maintained by the management system to indicate that the specified port of the first network element is connected to the specified port of the second network element if the management system receives a message indicating that a connection has been detected at the specified port of the first network element during a period in which the first work order step of the first work order is expected to be performed and receives a message indicating that a connection has been detected at the specified port of the second network element during the period in which the first work order step of the first work order was expected to be performed.

30. The system of claim 29 , wherein the management system is configured to generate a second work order comprising a second work order step specifying that the port of the first network element is to be disconnected from the port of the second network element;

wherein the first network element is configured to detect that a disconnection has been made at the specified port of the first network element;

wherein the second network element is configured to detect that a disconnection has been made at the specified port of the second network element; and

wherein the management system is configured to update information maintained by the management system to indicate that the specified port of the first network element has been disconnected from the specified port of the second network element if the management system receives a message indicating that the disconnection was detected at the specified port of the first network element during a period in which the second work order step of the second work order was expected to be performed and receives a message indicating that the disconnection was detected at the specified port of the second network element during the period in which the second work order step of the second work order was expected to be performed.

31. The system of claim 29 , wherein the cable comprises an unmanaged cable.

32. The system of claim 29 , wherein the cable comprises at least one of a fiber optic cable and a copper cable.

33. The system of claim 29 , wherein the first network element and the second network element comprise first and second managed network elements, respectively.

34. The system of claim 29 , wherein the first and second network elements comprise at least one of a patch panel, an optical distribution frame, a splitter tray, a switch, and a router.

35. The system of claim 29 , wherein each of the first and second network elements includes at least one of EEPROM-based PLM technology and RFID PLM technology.

36. The system of claim 29 , wherein the management system is configured to send the first work order to a mobile device.

37. A system comprising:

a first network element comprising at least one port, wherein the first network element is configured to detect the a cable connector has been disconnected from the port of the first network element;

a second network element comprising at least one port, wherein the second network element is configured to detect that a cable connector has been disconnected from the port of the second network element; and

a management system communicatively coupled to the first network element and the second network element;

wherein the management system is configured to generate a first work order comprising a first work order step specifying that the port of the first network element is to be disconnected from the port of the second network element; and

wherein the management system is configured to update information maintained by the management system to indicate that the specified port of the first network element has been disconnected from the specified port of the second network element if the management system receives a message indicating that the disconnection was detected at the specified port of the first network element during a period in which the first work order step of the first work order was expected to be performed and receives a message indicating that the disconnection was detected at the specified port of the second network element during the period in which the first work order step of the first work order was expected to be performed.

38. A program product for identifying a connecting of a specified port of a first network element and a specified port of a second network element, tangibly stored on a non-transitory storage medium, comprising instructions operable to cause at least one programmable processor to:

generate a work order comprising a work order step specifying that the specified port of the first network element is to be connected to the specified port of the second network element using a cable;

in connection with a connection being made at the specified port of the first network element, receiving information indicating that the connection has been made at the specified port of the first network element;

in connection with a connection being made at the specified port of the second network element, receiving information indicating that the connection has been made at the specified port of the second network element; and

if information is received indicating that the connection has been made at the specified port of the first network element during a period in which the work order step of the work order is expected to be performed and information is received indicating that the connection has been made at the specified port of the second network element during the period in which the work order step of the work order is expected to be performed, updating connection information for the first network element and the second network element to indicate that the specified port of the first network element is connected to the specified port of the second network element.

39. The program product of claim 38 , wherein the instructions are further operable to cause the at least one programmable processor to:

generate a second work order comprising a second work order step specifying that the specified port of the first network element is to be disconnected from the specified port of the second network element;

in connection with a disconnection being made at the specified port of the first network element, receiving information indicating that the disconnection has been made at the specified port of the first network element;

in connection with a disconnection being made at the specified port of the second network element, receiving information indicating that the disconnection has been made at the specified port of the second network element; and

if information is received indicating that the disconnection has been made at the specified port of the first network element during a period in which the second work order step of the second work order was expected to be performed and information is received indicating that the disconnection has been made at the specified port of the second network element during the period in which the second work order step of the second work order was expected to be performed, updating connection information for the first network element and the second network element to indicate that the specified port of the first network element is disconnected from the specified port of the second network element.

40. The program product of claim 38 , wherein the instructions are further operable to cause the at least one programmable processor to:

send the first work order to a mobile device.

Assignments (12)
SECURITY INTEREST Recorded Dec 17, 2024
From: ARRIS ENTERPRISES LLC; COMMSCOPE TECHNOLOGIES LLC; COMMSCOPE INC., OF NORTH CAROLINA; OUTDOOR WIRELESS NETWORKS LLC; RUCKUS IP HOLDINGS LLC
To: APOLLO ADMINISTRATIVE AGENCY LLC
Reel/Frame 069889/0114 →
RELEASE OF SECURITY INTEREST Recorded Apr 9, 2019
From: JPMORGAN CHASE BANK, N.A.
To: REDWOOD SYSTEMS, INC.; ALLEN TELECOM LLC; ANDREW LLC; COMMSCOPE, INC. OF NORTH CAROLINA; COMMSCOPE TECHNOLOGIES LLC
Reel/Frame 049260/0001 →
RELEASE OF SECURITY INTEREST Recorded Apr 9, 2019
From: JPMORGAN CHASE BANK, N.A.
To: REDWOOD SYSTEMS, INC.; ALLEN TELECOM LLC; ANDREW LLC; COMMSCOPE, INC. OF NORTH CAROLINA; COMMSCOPE TECHNOLOGIES LLC
Reel/Frame 048840/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 10, 2017
From: TYCO ELECTRONICS CORPORATION
To: ADC TELECOMMUNICATIONS, INC.
Reel/Frame 041545/0904 →
CHANGE OF NAME Recorded Mar 10, 2017
From: TYCO ELECTRONICS UK INFRASTRUCTURE LIMITED
To: COMMSCOPE CONNECTIVITY UK LIMITED
Reel/Frame 041978/0080 →
PATENT SECURITY AGREEMENT (ABL) Recorded Jan 13, 2016
From: COMMSCOPE TECHNOLOGIES LLC
To: JPMORGAN CHASE BANK, N.A., AS COLLATERAL AGENT
Reel/Frame 037514/0196 →
PATENT SECURITY AGREEMENT (TERM) Recorded Jan 13, 2016
From: COMMSCOPE TECHNOLOGIES LLC
To: JPMORGAN CHASE BANK, N.A., AS COLLATERAL AGENT
Reel/Frame 037513/0709 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 29, 2015
From: COMMSCOPE EMEA LIMITED
To: COMMSCOPE TECHNOLOGIES LLC
Reel/Frame 037012/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 26, 2015
From: TYCO ELECTRONICS SERVICES GMBH
To: COMMSCOPE EMEA LIMITED
Reel/Frame 036956/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 21, 2015
From: ADC TELECOMMUNICATIONS, INC.; TE CONNECTIVITY SOLUTIONS GMBH
To: TYCO ELECTRONICS SERVICES GMBH
Reel/Frame 036908/0443 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 16, 2015
From: TYCO ELECTRONICS UK LTD
To: TYCO ELECTRONICS UK INFRASTRUCTURE LIMITED
Reel/Frame 036619/0774 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 26, 2015
From: MALONE, GENE; ROBERTS, ANDREW P.; SMITH, PETER; SYBESMA, ERIC W.
To: TYCO ELECTRONICS CORPORATION; TYCO ELECTRONICS UK LTD.; ADC TELECOMMUNICATIONS, INC.
Reel/Frame 036428/0875 →