IP Library Granted Patent US 9,467,080
Granted Patent B2
US 9,467,080 · App. 14/459,007 · Granted Oct 11, 2016

Protective functions for parallel generators

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,467,080
App. No.
14/459,007
Granted
Oct 11, 2016
Kind
B2
Abstract

A generator system may include two or more generators electrically connected through a generator bus. A controller receives operation data from a first generator. The operation data may describe a power flow from a second generator to the first generator. From the operation data, either a loss of speed control or a loss of voltage control may be identified at the second generator. The controller may generate a command for the second generator based on the loss of speed control or the loss of voltage control.

Claims (57)

1. A method comprising:

identifying a system of parallel generators including a first generator and a second generator;

receiving operation data for the first generator;

determining a loss of speed control or a loss of voltage control at the second generator based on the operation data for the first generator; and

generating a command for the second generator based on the loss of speed control or the loss of voltage control,

wherein determining the loss of speed control or the loss of voltage control at the second generator based on the operation data for the first generator comprises:

identifying reverse reactive power from the operation data for the first generator; and

comparing the reverse reactive power to a threshold level, wherein the loss of speed control or the loss of voltage control is based on the reverse reactive power exceeding the threshold level.

2. The method of claim 1 , wherein determining the loss of speed control or the loss of voltage control at the second generator based on the operation data for the first generator comprises:

identifying an output voltage from the operation data for the first generator for a comparison of the output voltage to an expected level, wherein the loss of speed control or the loss of voltage control is based on the output voltage exceeding the expected level.

3. The method of claim 2 , wherein the expected value is based on an instruction for the first generator or a second generator.

4. The method of claim 2 , wherein the expected value is based on a past measurement of a generator bus.

5. The method of claim 1 , wherein the command for the second generator is a disconnection command to disconnect the second generator from a generator bus based on the loss of speed control or the loss of voltage control.

6. The method of claim 1 , wherein the loss of voltage control includes a failure of a voltage regulator or excitation control.

7. The method of claim 1 , wherein the loss of speed control includes a failure of a governor.

8. The method of claim 1 , wherein the system of parallel generators includes a third generator, and the loss of speed control or the loss of voltage control at the second generator based on the operation data for the third generator.

9. The method of claim 1 , further comprising:

starting a timer based on the loss of speed control or the loss of voltage control; and

generating a start command for an alternate generator based on the loss of speed control or the loss of voltage control;

wherein the command for the second generator disconnects the second generator from a generator bus when the timer reaches a predetermined time or the alternate generator closes to the generator bus.

10. A method comprising:

identifying a system of parallel generators including a first generator and a second generator;

receiving operation data for the first generator;

determining a loss of speed control or a loss of voltage control at the second generator based on the operation data for the first generator; and

generating a command for the second generator based on the loss of speed control or the loss of voltage control,

wherein determining the loss of speed control or the loss of voltage control at the second generator based on the operation data for the first generator comprises:

identifying reverse real power from the operation data for the first generator; and

comparing the reverse real power to a threshold level, wherein the loss of speed control or the loss of voltage control is based on the reverse real power exceeding the threshold level.

11. The method of claim 10 , wherein the command for the second generator is a disconnection command to disconnect the second generator from a generator bus based on the loss of speed control or the loss of voltage control.

12. The method of claim 10 , wherein the loss of voltage control includes a failure of a voltage regulator or excitation control or the loss of speed control includes a failure of a governor.

13. An apparatus comprising:

a processor; and

a memory storing instructions configured to cause the processor to perform:

identifying a system of parallel generators including a first generator and a second generator;

receiving operation data for the first generator;

determining a loss of speed control or a loss of voltage control at the second generator based on the operation data for the first generator; and

generating a command for the second generator based on the loss of speed control or the loss of voltage control,

wherein determining the loss of speed control or the loss of voltage control at the second generator based on the operation data for the first generator comprises:

identifying reverse real power from the operation data for the first generator; and

comparing the reverse real power to a threshold level, wherein the loss of speed control or the loss of voltage control is based on the reverse real power exceeding the threshold level.

14. The apparatus of claim 13 , wherein determining the loss of speed control or the loss of voltage control at the second generator based on the operation data for the first generator comprises:

identifying an output voltage from the operation data for the first generator for a comparison of the output voltage to an expected level, wherein the loss of speed control or the loss of voltage control is based on the output voltage exceeding the expected level.

15. The apparatus of claim 14 , wherein the expected value is based on an instruction for the first generator or a second generator.

16. The apparatus of claim 14 , wherein the expected value is based on a past measurement of a generator bus.

17. The apparatus of claim 13 , wherein the command for the second generator is a disconnection command to disconnect the second generator from a generator bus based on the loss of speed control or the loss of voltage control.

18. The apparatus of claim 13 , wherein the loss of voltage control includes a failure of a voltage regulator or excitation control.

19. The apparatus of claim 13 , wherein the loss of speed control includes a failure of a governor.

20. An apparatus comprising:

a processor; and

a memory storing instructions configured to cause the processor to perform:

identifying a system of parallel generators including a first generator and a second generator;

receiving operation data for the first generator;

determining a loss of speed control or a loss of voltage control at the second generator based on the operation data for the first generator; and

generating a command for the second generator based on the loss of speed control or the loss of voltage control,

wherein determining the loss of speed control or the loss of voltage control at the second generator based on the operation data for the first generator comprises:

identifying reverse reactive power from the operation data for the first generator; and

comparing the reverse reactive power to a threshold level, wherein the loss of speed control or the loss of voltage control is based on the reverse reactive power exceeding the threshold level.

Assignments (4)
PATENT SECURITY AGREEMENT (ABL) Recorded May 3, 2024
From: CURTIS INSTRUMENTS, INC.; DISCOVERY ENERGY, LLC; HEILA TECHNOLOGIES, INC.
To: BANK OF AMERICA, N.A., AS COLLATERAL AGENT
Reel/Frame 067306/0903 →
PATENT SECURITY AGREEMENT (TERM) Recorded May 2, 2024
From: CURTIS INSTRUMENTS, INC.; DISCOVERY ENERGY, LLC; HEILA TECHNOLOGIES, INC.
To: BANK OF AMERICA, N.A, AS COLLATERAL AGENT
Reel/Frame 067290/0853 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 1, 2024
From: KOHLER CO.
To: DISCOVERY ENERGY, LLC
Reel/Frame 067289/0516 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 30, 2016
From: FRAMPTON, ISAAC; DORN, DOUGLAS
To: KOHLER CO.
Reel/Frame 039589/0005 →