IP Library Granted Patent US 9,771,797
Granted Patent B2
US 9,771,797 · App. 14/467,504 · Granted Sep 26, 2017

Autonomous formation pressure test process for formation evaluation tool

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,771,797
App. No.
14/467,504
Granted
Sep 26, 2017
Kind
B2
Abstract

A formation tester places an isolation device, preferably a probe, in fluid communication with a formation to determine formation pressures. The tester's controller uses a pressure pre-test process to autonomously control operation. The controller measures drawdown pressure and interval as the tester draws down pressure in flowline coupled to the probe. If the drawdown pressure indicates a dry test has occurred, the process is aborted. Otherwise, the controller measures buildup pressure and interval by allowing buildup of pressure of the flowline. The controller permits this to continue until the interval is longer than the drawdown interval and/or until a rate of the buildup falls below a predetermined rate. If the buildup pressure is too tight relative to the drawdown pressure, the controller aborts the test. Eventually, the controller measures a final buildup pressure when the buildup terminates. A new drawdown rate and volume can be determined for subsequent formation tests.

Claims (40)

1. A formation tester, comprising:

an isolation device disposing in fluid communication with a formation;

a drawdown volume being adjustable and in fluid communication with the isolation device;

one or more sensors monitoring pressure in fluid communication with the isolation device; and

a controller operatively coupled to the one or more sensors and the drawdown volume and preconfigured to test each of one or more stations of the formation with at least two autonomous drawdowns and buildups, the controller configured to:

perform a first of the autonomous drawdowns toward a first preconfigured volume of a total available volume with a first preconfigured flow rate at one of the stations to obtain a first drawdown pressure;

perform a first of the autonomous buildups at the one station after success of the first autonomous drawdown to obtain a first buildup pressure;

determine a second volume as a fraction of the total available volume remaining from an actual volume used in the first drawdown;

determine a second flow rate after success of the first autonomous buildup from the first preconfigured flow rate scaled by a ratio based on a difference between the first buildup pressure and the first drawdown pressure;

perform a second of the autonomous drawdowns toward the second volume with the second flow rate at the one station;

perform a second of the autonomous buildups at the one station after success of the second autonomous drawdown to obtain a second buildup pressure;

compare the first buildup pressure measured in the first autonomous build up to the second buildup pressure measured in the second autonomous buildup; and

proceed with operation of the formation tester based on the comparison.

2. The formation tester of claim 1 , wherein the at least two autonomous drawdowns and buildups are performed independent of communications with surface equipment.

3. The formation tester of claim 1 , wherein to proceed with operation of the formation tester based on the comparison, the controller is configured to terminate the formation testing at the one station if the first and second buildup pressures are equivalent.

4. The formation tester of claim 1 , wherein the second flow rate is determined based on the first flow rate scaled by the ratio of a specified pressure differential relative to the difference between the first buildup pressure and the first drawdown pressure.

5. The formation tester of claim 1 , wherein to perform the first or second autonomous drawdown, the controller is configured to:

draw down on the one station with the formation tester toward the first or second volume with the first or second flow rate; and

determine whether the first or second drawdown meets at least one drawdown criterion.

6. The formation tester of claim 5 , wherein to perform the first or second autonomous buildup, the controller is configured to:

measure the first or second buildup pressure in the first or second autonomous buildup if the first or second autonomous drawdown meets the at least one drawdown criterion; and

determine whether the first or second autonomous buildup meets at least one buildup criterion.

7. The formation tester of claim 1 , wherein to proceed with operation of the formation tester based on the comparison, the controller is configured to perform a third autonomous drawdown and a third autonomous buildup if the second buildup pressure is different from the first buildup pressure.

8. The formation tester of claim 7 , wherein to perform the third autonomous drawdown, the controller is configured to:

determine a third flow rate and a third volume, the third flow rate determined based on a difference between the second buildup pressure and a second drawdown pressure measured in the second drawdown;

draw down on the formation with the formation tester toward the third volume with the third flow rate; and

determine whether the third drawdown meets at least one drawdown criterion.

9. The formation tester of claim 7 , wherein to perform the third autonomous buildup, the controller is configured to:

measure a third buildup pressure if the third autonomous drawdown meets at least one drawdown criterion.

10. The formation tester of claim 1 , wherein to perform the first or second autonomous drawdown, the controller is configured to determine that the first or second autonomous drawdown meets at least one drawdown criterion.

11. The formation tester of claim 10 , wherein to determine that the first or second autonomous drawdown meets the at least one drawdown criterion, the controller is configured to determine that the first or second autonomous drawdown exceeds a minimum time interval and reaches a minimum volume.

12. The formation tester of claim 10 , wherein to determine that the first autonomous drawdown meets the at least one drawdown criterion, the controller is configured to:

calculate a bubble point pressure for the formation at the one station; and

determine that the first drawdown pressure exceeds the calculated bubble point pressure.

13. The formation tester of claim 10 , wherein to determine that the first autonomous drawdown meets the at least one drawdown criterion, the controller is configured to determine that a difference between a hydrostatic pressure and the first drawdown pressure indicates a seal of the formation tester with the formation.

14. The formation tester of claim 10 , wherein to determine that the first autonomous drawdown meets the at least one drawdown criterion, the controller is configured to determine that the formation tester has reached a minimum setting pressure at the one station.

15. The formation tester of claim 1 , wherein to perform the first or second autonomous buildup, the controller is configured to determine that the first or second autonomous buildup meets at least one buildup criterion.

16. The formation tester of claim 15 , wherein to determine that the first or second autonomous buildup meets the at least one buildup criterion, the controller is configured to determine that a rate of pressure buildup falls below a predetermined rate.

17. The formation tester of claim 15 , wherein to determine that the first autonomous buildup meets the at least one buildup criterion, the controller is configured to determine that a difference between the first buildup pressure and the first drawdown pressure measured in the first autonomous drawdown at least exceeds a predetermined threshold.

18. The formation tester of claim 15 , wherein to determine that the first or second autonomous buildup meets the at least one buildup criterion, the controller is configured to determine that an elapsed time interval for the first or second autonomous buildup does not exceed a predetermined time interval.

Assignments (9)
PATENT SECURITY INTEREST ASSIGNMENT AGREEMENT Recorded Apr 26, 2023
From: DEUTSCHE BANK TRUST COMPANY AMERICAS
To: WELLS FARGO BANK, NATIONAL ASSOCIATION
Reel/Frame 063470/0629 →
RELEASE OF SECURITY INTEREST Recorded Oct 1, 2021
From: WILMINGTON TRUST, NATIONAL ASSOCIATION
To: WEATHERFORD TECHNOLOGY HOLDINGS, LLC; WEATHERFORD NETHERLANDS B.V.; WEATHERFORD NORGE AS; HIGH PRESSURE INTEGRITY, INC.; PRECISION ENERGY SERVICES, INC.; WEATHERFORD CANADA LTD; WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH; PRECISION ENERGY SERVICES ULC; WEATHERFORD U.K. LIMITED
Reel/Frame 057683/0423 →
SECURITY INTEREST Recorded Oct 1, 2021
From: WEATHERFORD TECHNOLOGY HOLDINGS, LLC; WEATHERFORD NETHERLANDS B.V.; WEATHERFORD NORGE AS; HIGH PRESSURE INTEGRITY, INC.; PRECISION ENERGY SERVICES, INC.; WEATHERFORD CANADA LTD.; WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH; WEATHERFORD U.K. LIMITED
To: WILMINGTON TRUST, NATIONAL ASSOCIATION
Reel/Frame 057683/0706 →
RELEASE OF SECURITY INTEREST Recorded Aug 28, 2020
From: WELLS FARGO BANK, NATIONAL ASSOCIATION
To: WEATHERFORD TECHNOLOGY HOLDINGS, LLC; WEATHERFORD NETHERLANDS B.V.; WEATHERFORD NORGE AS; HIGH PRESSURE INTEGRITY, INC.; PRECISION ENERGY SERVICES, INC.; WEATHERFORD CANADA LTD.; WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH; PRECISION ENERGY SERVICES ULC; WEATHERFORD U.K. LIMITED
Reel/Frame 053838/0323 →
SECURITY INTEREST Recorded Aug 28, 2020
From: WEATHERFORD TECHNOLOGY HOLDINGS, LLC; WEATHERFORD NETHERLANDS B.V.; WEATHERFORD NORGE AS; HIGH PRESSURE INTEGRITY, INC.; PRECISION ENERGY SERVICES, INC.; WEATHERFORD CANADA LTD.; WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH; PRECISION ENERGY SERVICES ULC; WEATHERFORD U.K. LIMITED
To: WILMINGTON TRUST, NATIONAL ASSOCIATION
Reel/Frame 054288/0302 →
SECURITY INTEREST Recorded Dec 26, 2019
From: WEATHERFORD TECHNOLOGY HOLDINGS, LLC; WEATHERFORD NETHERLANDS B.V.; WEATHERFORD NORGE AS; HIGH PRESSURE INTEGRITY, INC.; PRECISION ENERGY SERVICES, INC.; WEATHERFORD CANADA LTD.; WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH; PRECISION ENERGY SERVICES ULC; WEATHERFORD U.K. LIMITED
To: DEUTSCHE BANK TRUST COMPANY AMERICAS, AS ADMINISTRATIVE AGENT
Reel/Frame 051419/0140 →
SECURITY INTEREST Recorded Dec 18, 2019
From: WEATHERFORD TECHNOLOGY HOLDINGS LLC; WEATHERFORD NETHERLANDS B.V.; WEATHERFORD NORGE AS; HIGH PRESSURE INTEGRITY INC.; PRECISION ENERGY SERVICES INC.; WEATHERFORD CANADA LTD.; WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH; PRECISION ENERGY SERVICES ULC; WEATHERFORD U.K. LIMITED
To: WELLS FARGO BANK NATIONAL ASSOCIATION AS AGENT
Reel/Frame 051891/0089 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 15, 2018
From: PRECISION ENERGY SERVICES, INC.
To: WEATHERFORD TECHNOLOGY HOLDINGS, LLC
Reel/Frame 045801/0961 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 25, 2017
From: HEMSING, JEFFERY J.
To: PRECISION ENERGY SERVICES, INC.
Reel/Frame 043404/0074 →