IP Library Granted Patent US 9,995,140
Granted Patent B2
US 9,995,140 · App. 14/479,419 · Granted Jun 12, 2018

Yieldable prop with yieldable insert

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,995,140
App. No.
14/479,419
Granted
Jun 12, 2018
Kind
B2
Abstract

A mine prop includes a first pipe having a first end and a second end, a second pipe having a first end and a second end, and a yield member secured to the second pipe. The second pipe is slidably received in the first pipe. The yield member is configured to yield before the first and second pipes when the mine prop is placed under a predetermined load.

Claims (39)

1. A mine prop comprising:

a first pipe having a first end and a second end;

a second pipe having a first end and a second end, the second pipe slidably received in the first pipe;

a yield member secured directly to the second pipe such that the yield member moves with the second pipe, the yield member configured to plastically deform before the first and second pipes when the mine prop is placed under a predetermined load.

2. The mine prop of claim 1 , wherein the yield member comprises a body having a first end and a second end, the body of the yield member defining at least one passageway extending between the first and second ends of the body.

3. The mine prop of claim 2 , wherein the yield member is secured to the second end of the second pipe.

4. The mine prop of claim 3 , wherein the first end of the body of the yield member defines an annular recess, the first end of the body of the yield member secured to the second end of the second pipe via a friction fit.

5. The mine prop of claim 4 , wherein the annular recess defines a tapered portion on at least a portion of an outer surface of the yield member.

6. The mine prop of claim 2 , wherein a washer is secured to the second end of the second pipe, the washer defining an opening, the yield member is secured to the washer with the passageway of the yield member in fluid communication with the opening of the washer.

7. The mine prop of claim 1 , wherein the yield member comprises a polymeric material.

8. The mine prop of claim 2 , wherein the yield member comprises a polymeric material.

9. The mine prop of claim 1 , further comprising particulate material received within the second pipe.

10. The mine prop of claim 2 , further comprising particulate material received within the second pipe and the at least one passageway of the yield member, the second pipe having a retracted position and an extended position relative to the first pipe, the particulate material is movable from the second pipe to the first pipe when the second pipe transitions from the retracted position to the extended position.

11. The mine prop of claim 1 , further comprising:

a secondary yielding arrangement that is configured to yield prior to the yield member yielding.

12. The mine prop of claim 11 , wherein the secondary yielding arrangement comprises a yieldable plate having a concave side facing away from the first end of the second pipe.

13. A method of supporting a mine roof comprising:

positioning a mine prop within a mine opening, the mine prop comprising a first pipe having first and second ends, a second pipe having first and second ends, and a yield member secured directly to the second pipe such that the yield member moves in a same direction as the second pipe, the second pipe received in the first pipe;

extending the second pipe towards a roof of the mine opening; and

plastically deforming the yield member when the mine prop receives a predetermined load from the roof of the mine opening.

14. The method of claim 13 , wherein the mine prop further comprises particulate material positioned within the second pipe, the particulate material moving from the second pipe to the first pipe when extending the second pipe toward the roof of the mine opening.

15. A mine prop comprising:

a first pipe having a first end and a second end;

a second pipe having a first end and a second end, the second end of the second pipe slidably received in the first pipe such that the second end of the second pipe is surrounded by the first pipe;

a centering pipe received within the first end of the second pipe; and

a yield pipe having a first end and a second end, the yield pipe receiving the centering pipe, the second end of the yield pipe engaging the first end of the second pipe, the yield pipe configured to yield before the second pipe when the mine prop is placed under a predetermined load.

16. The mine prop of claim 15 , further comprising a washer positioned adjacent the second end of the second pipe, the washer defining an opening.

17. The mine prop of claim 16 , further comprising particulate material positioned within the second pipe, the second pipe having a retracted position and an extended position relative to the first pipe, the particulate material is movable from the second pipe to the first pipe when the second pipe transitions from the retracted position to the extended position.

18. The mine prop of claim 15 , wherein the yield pipe is axially aligned with the second pipe.

19. The mine prop of claim 15 , wherein the yield pipe has a lower compressive strength than a compressive strength of the second pipe.

20. The mine prop of claim 15 , further comprising first and second support plates, the first support plate secured to the first end of the yield pipe, the second support plate secured to the second end of the first pipe.

21. A mine prop comprising:

a first pipe having a first end and a second end;

a second pipe having a first end and a second end, the second pipe slidably received in the first pipe;

a washer entirely received and friction fit within the second pipe and defining at least one passageway, the washer comprising a polymeric material; and

particulate material positioned within the second pipe, the second pipe having a retracted position and an extended position relative to the first pipe, the particulate material is movable from the second pipe to the first pipe when the second pipe transitions from the retracted position to the extended position.

22. The mine prop of claim 21 , wherein the washer comprises polyvinyl chloride.

23. The mine prop of claim 21 , wherein the washer is secured to the second pipe via a friction fit.

24. The mine prop of claim 21 , wherein the at least one passageway of the washer comprises at least four passageways.

Assignments (5)
SECURITY INTEREST Recorded May 29, 2026
From: FCI HOLDINGS DELAWARE, LLC; J-LOK CO.; JM STEEL - PENNSYLVANIA, LLC; XCAL TOOLS - BECKLEY, LLC; XCAL TOOLS - SOUTH POINT, LLC
To: PNC BANK, NATIONAL ASSOCIATION
Reel/Frame 075651/0136 →
SECURITY INTEREST Recorded Dec 17, 2025
From: XCAL TOOLS – BRISTOL, LLC; JM STEEL – PENNSYLVANIA, LLC; J-LOK CO.; FCI HOLDINGS DELAWARE, LLC
To: JEFFERIES FINANCE LLC, AS COLLATERAL AGENT
Reel/Frame 074005/0650 →
CHANGE OF NAME Recorded May 16, 2025
From: FCI HOLDINGS DELAWARE, INC.
To: FCI HOLDINGS DELAWARE, LLC
Reel/Frame 071297/0130 →
SECURITY AGREEMENT Recorded Mar 21, 2016
From: DSI UNDERGROUND SYSTEMS, LLC; FCI HOLDINGS DELAWARE, INC., A DELAWARE CORPORATION; J-LOK CO., A PENNSYLVANIA CORPORATION
To: WELLS FARGO BANK, NATIONAL ASSOCIATION
Reel/Frame 038179/0591 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 6, 2015
From: FAULKNER, DAKOTA; OLDSEN, JOHN G.; COOK, THOMAS; STANKUS, JOHN C.
To: FCI HOLDINGS DELAWARE, INC.
Reel/Frame 034645/0649 →