Method for operating a power plant

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,605,564
App. No.
14/488,344
Granted
Mar 28, 2017
Kind
B2
Abstract

The invention relates to a method for operating a steam power plant, particularly a combined cycle power plant, which includes a gas turbine an a steam/water cycle with a heat recovery steam generator, through which the exhaust gases of the gas turbine flow, a water-cooled condenser, a feedwater pump and a steam turbine. A cooling water pump is provided for pumping cooling water through said water-cooled condenser. Evacuating means are connected to the water-cooled condenser for evacuating at least said water-cooled condenser. The method relates to a shut down and start-up of the power plant after the shutdown. The method includes: a) shut down of the steam turbine and gas turbine and/or a combustor of said gas turbine ; b) restoration of a good vacuum within the condenser by using said evacuating means; c) stopping said cooling water pump of said water-cooled condenser and said evacuating means, and filling up at least said condenser with steam up to slightly above atmospheric pressure; d) controlling the pressure with a flow of said cooling water; e) after a certain shut-down period starting the cooling water pump just before start-up of the plant; and f) starting the plant.

Claims (23)

1. A method for operating a steam power plant, comprising a steam generator, a steam turbine and a steam/water cycle, at least consisting of a water-cooled condenser, a deaerator and a feedwater pump, whereby a cooling water pump is provided for pumping cooling water through said water-cooled condenser, and evacuating means are connected to said water-cooled condenser for evacuating at least said water-cooled condenser, said operating method being related to a shut down and start-up of said power plant after said shut down and comprising the steps of:

a) shut down of the steam turbine;

b) restoration of a good vacuum within the condenser by using said evacuating means;

c) stopping said cooling water pump of said water-cooled condenser and said evacuating means, and filling up the vacuum portion of the steam/water cycle, at least said condenser, with steam up to slightly above atmospheric pressure;

d) controlling the pressure with a flow of said cooling water;

e) after a certain shut-down period starting the cooling water pump just before start-up of the plant; and

f) starting the plant.

2. A method for operating a combined cycle power plant, comprising a gas turbine and a steam/water cycle with a heat recovery steam generator, through which the exhaust gases of the gas turbine flow, a water-cooled condenser, a feedwater pump and a steam turbine, whereby a cooling water pump is provided for pumping cooling water through said water-cooled condenser, and evacuating means are connected to said water-cooled condenser for evacuating at least said water-cooled condenser, said operating method being related to a shut down and start-up of said power plant after said shut down and comprising the steps of:

a) shut down of the steam turbine and gas turbine and/or a combustor of said gas turbine ;

b) restoration of a good vacuum within the condenser by using said evacuating means;

c) stopping said cooling water pump of said water-cooled condenser and said evacuating means, and filling up the vacuum portion of the steam/water cycle, at least said condenser, with steam up to slightly above atmospheric pressure;

d) controlling the pressure with a flow of said cooling water;

e) after a certain shut-down period starting the cooling water pump just before start-up of the plant; and

f) starting the plant.

3. The method according to claim 1 , wherein the steam turbine comprises a low-pressure steam turbine, and the condenser and said low-pressure steam turbine are filled up with steam in step (c).

4. The method according to claim 1 , wherein the steam for filling up said condenser is taken from the steam/water cycle.

5. The method according to claim 4 , wherein the steam turbine has a steam-sealed gland, and gland steam is used for filling up said condenser.

6. The method according to claim 4 , wherein the steam turbine has a low-pressure steam turbine with a steam bypass, and the steam for filling up the vacuum portion of the steam/water cycle, at least said condenser, is taken from the LP steam bypass.

7. The method according to claim 4 , wherein the steam turbine has a low-pressure steam turbine with an auxiliary LP drum, and the steam for filling up the vacuum portion of the steam/water cycle, at least said condenser, is taken from the LP steam bypass.

8. The method according to claim 1 , wherein at least the condenser has an insulation.

9. The method according to claim 1 , further comprising a condenser bypass is used to control the pressure in the condenser.

10. The method according to claim 1 , wherein the built up inversion layer on the hot well is used to avoid heat loss.

11. The method according to claim 1 , wherein the ejector is started as soon as possible at startup procedure to extract the gases diffused into the steam.

Assignments (2)
CHANGE OF NAME Recorded Aug 17, 2016
From: ALSTOM TECHNOLOGY LTD
To: GENERAL ELECTRIC TECHNOLOGY GMBH
Reel/Frame 039714/0578 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 9, 2015
From: MOHR, WOLFGANG FRANZ DIETRICH; OLIA, HAMID; CARRILLO RUBIO, MIGUEL ANGEL; REINHARD, JUERGEN
To: ALSTOM TECHNOLOGY LTD