IP Library Granted Patent US 10,775,039
Granted Patent B2
US 10,775,039 · App. 14/533,568 · Granted Sep 15, 2020

Method for managing a shut down of a boiler

Inventors: Michael Heim (Horb, DE); Thomas Ferrand (Stuttgart, DE)
Assignee: GENERAL ELECTRIC TECHNOLOGY GMBH
F22B35/00F01K13/02F22B37/22
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,775,039
App. No.
14/533,568
Granted
Sep 15, 2020
Kind
B2
Abstract

The method for managing a shut down of a boiler having a duct and heat exchanging components is provided. The heat exchanging component having tubed heat exchanging surfaces within the duct and headers outside the duct. The method includes regulating the temperature of the headers during shut down to a temperature close to the one expected for the steam moving from the tubed heat exchanging surfaces into the headers at a starting up following the shut down.

Claims (21)

1. A method for managing a shutdown of a boiler comprising:

providing a duct,

providing at least a heat exchanging component;

wherein the at least a heat exchanging component includes:

tubed heat exchanging surfaces within the duct,

headers outside the duct,

the headers being connected to the tubed heat exchanging surfaces,

the headers and the tubed heat exchanging surfaces containing steam; regulating the temperature of the headers during shut down to a target temperature that is a function of the expected temperature for the steam moving from the tubed heat exchanging surfaces into the headers at a starting up following the shutdown; and

wherein regulating the temperature of the headers includes maintaining a steam flow through the headers after shutdown of the firing system by maintaining a steam circulation from the tubed heat exchange surfaces connected to the respective headers and through said headers.

2. The method according to claim 1 further comprising: providing a high pressure bypass control valve downstream of the at least a heat exchanging component, configured such that maintaining a flow through the headers includes maintaining a steam flow through the high pressure bypass control valve.

3. The method according to claim 2 further comprising: wherein the heat exchanging component is a superheater and the high pressure bypass control valve is downstream of the superheater.

4. The method according to claim 1 further comprising: maintaining a gas flow within the duct during shutdown.

5. The method of claim 4 further comprising: wherein the boiler includes a fan for gas circulation through the duct, configured such that maintaining a gas flow includes operating the fan.

6. The method of claim 5 further comprising: wherein operating the fan includes operating the fan at minimum load.

7. The method of claim 6 further comprising: wherein operating the fan includes operating the fan at less than 10% of its nominal mass flow.

8. The method according to claim 1 further comprising: regulating the pressure within the boiler during shutdown or before shutdown.

9. The method of claim 4 further comprising: wherein the boiler further comprises one or more high pressure bypass control valves downstream of a superheater and/or one or more low pressure by-pass control valves downstream of the reheater, configured such that regulating the pressure includes regulating the high pressure bypass control valves and/or the low pressure by-pass control valves.

10. The method according to claim 8 further comprising: wherein the boiler further comprises an economizer, configured such that regulating the pressure includes circulating water through the economizer and evaporating at least partly water passing through the economizer.

11. The method according to claim 10 further comprising: wherein regulating the pressure further includes circulating air through the duct.

12. The method of claim 11 further comprising: wherein the boiler includes a fan for gas circulation through the duct, configured such that circulating air includes operating the fan.

13. The method according to claim 1 further comprising: wherein the target temperature is the expected temperature for the steam moving from the tubed heat exchanging surfaces into the headers or a temperature lower than the expected temperature.

Assignments (3)
CHANGE OF ADDRESS Recorded Aug 13, 2021
From: GENERAL ELECTRIC TECHNOLOGY GMBH
To: GENERAL ELECTRIC TECHNOLOGY GMBH
Reel/Frame 057182/0628 →
CHANGE OF NAME Recorded Aug 17, 2016
From: ALSTOM TECHNOLOGY LTD
To: GENERAL ELECTRIC TECHNOLOGY GMBH
Reel/Frame 039714/0578 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 15, 2014
From: HEIM, MICHAEL; FERRAND, THOMAS
To: ALSTOM TECHNOLOGY LTD
Reel/Frame 034507/0724 →