IP Library Granted Patent US 9,228,408
Granted Patent B2
US 9,228,408 · App. 14/561,274 · Granted Jan 5, 2016

Method for capturing flow discharged from a subsea blowout or oil seep

Inventors: Patrick Michael Cargol, Jr. (The Woodlands, TX); Robert H. Gatliff, Jr. (Houston, TX); Pierre Albert Beynet (Houston, TX); Kevin James Devers (Katy, TX); Trent J. Fleece (Houston, TX); Norman Dennis McMullen (Cypress, TX); Jason T. Holvey (Montgomery, TX); Jonathan Eryl Rogers (The Woodlands, TX); Daniel Scott Stoltz (The Woodlands, TX)
Assignees: Wild Well Control, Inc.; BP Corporation North America Inc.
E21B33/035E21B19/002E21B43/0122
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,228,408
App. No.
14/561,274
Granted
Jan 5, 2016
Kind
B2
Abstract

A method of capturing flow discharged from a subsea blowout or oil seep includes lowering a collector from a mobile offshore drilling unit (MODU) onto a seafloor at a location distant from subsea equipment blowing production fluid. A workstring is connected to the collector and an inert gas is injected through the workstring. The collector is landed onto the subsea equipment while maintaining the injection of inert gas. The inert gas injection is halted and a top of the workstring is routed to surface collection equipment, thereby directing the blowing production fluid from the subsea equipment, into the collector, and through the workstring to the MODU.

Claims (20)

1. A method for capturing flow discharged from a subsea blowout, comprising:

lowering a collector from a mobile offshore drilling unit (MODU) onto a seafloor at a location distant from subsea equipment blowing production fluid;

connecting a workstring to the collector;

injecting an inert gas through the workstring;

moving the MODU and connected collector to the subsea equipment and landing the collector onto the equipment while maintaining injection of the inert gas;

halting injection of the inert gas; and

routing a top of the workstring to surface collection equipment, thereby directing the blowing production fluid from the subsea equipment into a chimney of the collector, wherein the chimney is connected to the MODU by the workstring.

2. The method of claim 1 , further comprising:

connecting an injection line to the collector; and

injecting hydrates inhibitor through the injection line and into the collector.

3. The method of claim 1 , wherein:

the collector has one or more vents, and

the method further comprises closing the vents.

4. The method of claim 3 , further comprising injecting dispersant into the vents or adjacent a bottom of the collector.

5. The method of claim 3 , wherein a check valve prevents flow of seawater into each vent.

6. The method of claim 1 , further comprising:

separating crude oil from the blowing production fluid; and

storing the separated crude oil.

7. The method of claim 1 , wherein the collector forms a controlled gap seal with the subsea equipment.

8. The method of claim 1 , wherein the production fluid naturally flows to the MODU.

Assignments (6)
SECURITY INTEREST Recorded Oct 9, 2025
From: STABIL DRILL SPECIALTIES, L.L.C.; SUPERIOR INSPECTION SERVICES, L.L.C.; H.B. RENTALS, L.C.; SUPERIOR ENERGY SERVICES, INC.; SUPERIOR ENERGY SERVICES, L.L.C.; WARRIOR ENERGY SERVICES, LLC; WORKSTRINGS INTERNATIONAL, L.L.C.; WILD WELL CONTROL, INC.
To: TRUIST BANK, AS NOTES COLLATERAL AGENT
Reel/Frame 072526/0562 →
SECURITY INTEREST Recorded Feb 11, 2021
From: CSI TECHNOLOGIES, LLC; SPN WELL SERVICES. INC.; STABIL DRILL SPECIALTIES, LLC; SUPERIOR ENERGY SERVICES, L.L.C.; WARRIOR ENERGY SERVICES CORPORATION; WILD WELL CONTROL, INC.; SUPERIOR ENERGY SERVICES-NORTH AMERICA SERVICES, INC.; SUPERIOR INSPECTION SERVICES, LLC
To: JPMORGAN CHASE BANK, N.A.
Reel/Frame 055281/0031 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 25, 2016
From: BP CORPORATION NORTH AMERICA, INC.
To: WILD WELL CONTROL, INC.
Reel/Frame 038714/0281 →
SECURITY INTEREST Recorded Feb 25, 2016
From: INTEGRATED PRODUCTION SERVICES, INC.; SUPERIOR ENERGY SERVICES, L.L.C.; SUPERIOR ENERGY SERVICES-NORTH AMERICA SERVICES, INC.; WARRIOR ENERGY SERVICES CORPORATION; WILD WELL CONTROL, INC.
To: JPMORGAN CHASE BANK, N.A. AS ADMINISTRATIVE AGENT
Reel/Frame 037927/0088 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 6, 2015
From: BEYNET, PIERRE ALBERT; FLEECE, TRENT J.; ROGERS, JONATHAN; DEVERS, KEVIN JAMES; MCMULLEN, NORMAN DENNIS; STOLTZ, DANIEL SCOTT
To: BP CORPORATION NORTH AMERICA INC.
Reel/Frame 036265/0368 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 8, 2014
From: CARGOL, PATRICK MICHAEL, JR.; GATLIFF, ROBERT H., JR.; HOLVEY, JASON T.
To: WILD WELL CONTROL, INC.
Reel/Frame 034427/0795 →
Continuity (3)
Division 13237549 · Sep 20, 2011
Provisional Application 61384358 · Sep 20, 2010
Related Publication 20150159456A1 · Jun 11, 2015