IP Library Granted Patent US 9,839,049
Granted Patent B2
US 9,839,049 · App. 14/582,379 · Granted Dec 5, 2017

Scheduling for an unlicensed carrier type

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,839,049
App. No.
14/582,379
Granted
Dec 5, 2017
Kind
B2
Abstract

Technology for performing downlink scheduling is disclosed. One or more subframes can be identified within a defined frame of a primary cell to perform cross-subframe scheduling for a secondary cell. The primary cell can be configured to communicate with a user equipment (UE) using a licensed band and the secondary cell can be configured to communicate with the UE using an unlicensed band. The cross-subframe scheduling can be performed for one or more downlink subframes of the secondary cell using the one or more subframes of the primary cell.

Claims (36)

1. An evolved node B (eNB) operable to perform downlink scheduling, the eNB having one or more processors configured to:

identify one or more subframes within a defined frame of a primary cell to perform cross-subframe scheduling for a secondary cell, wherein the primary cell is configured to communicate with a user equipment (UE) using a licensed band and the secondary cell is configured to communicate with the UE using an unlicensed band; and

perform the cross-subframe scheduling for one or more downlink subframes of the secondary cell using the one or more subframes of the primary cell; and

perform the cross-subframe scheduling for a downlink subframe of the secondary cell using a subframe of the primary cell that is approximately in parallel to the downlink subframe of the secondary cell, wherein the subframe of the primary cell is not aligned with the downlink subframe of the secondary cell with respect to subframe boundaries and corresponding indexes, wherein the downlink subframe of the secondary cell has a starting time instance of t 1 and a finishing time instance of t 2 and the subframe of the primary cell has a starting time instance of t 3 and a finishing time instance of t 4 , wherein t 3 ≦t 1 and t 1 ≦t 4 ≦t 2 .

2. The eNB of claim 1 , wherein the one or more processors are further configured to perform the cross-subframe scheduling for the one or more downlink subframes of the secondary cell using special subframes of the primary cell, the cross-subframe scheduling being performed in accordance with a predefined cross-subframe scheduling pattern.

3. The eNB of claim 1 , wherein the one or more processors are further configured to perform the cross-subframe scheduling for the one or more downlink subframes of the secondary cell using at least one downlink subframe of the primary cell and at least one special subframe of the primary cell.

4. The eNB of claim 1 , wherein the subframes of the primary cell are aligned with subframes of the secondary cell with respect to subframe boundaries and corresponding indexes, wherein downlink control information (DCI) is used to perform the cross-subframe scheduling for a downlink subframe of the secondary cell, wherein a subframe index of the primary cell containing the DCI is different than a subframe index of the secondary cell for which the DCI is intended.

5. The eNB of claim 1 , wherein the one or more processors are further configured to perform the cross-subframe scheduling for a defined number of consecutive downlink subframes of the secondary cell using a single subframe of the primary cell, wherein a single downlink control information (DCI) is used to perform the cross-subframe scheduling for the defined number of consecutive downlink subframes of the secondary cell.

6. The eNB of claim 1 , wherein:

the primary cell operates in time division duplexing (TDD) or frequency division duplexing (FDD); and

the secondary cell operates in TDD or FDD.

7. The eNB of claim 1 , wherein the one or more processors are further configured to perform the cross-subframe scheduling for a defined number of consecutive downlink subframes of the secondary cell using multiple downlink control informations (DCIs) from a single subframe of the primary cell, wherein the subframes of the primary cell are not aligned with subframes of the secondary cell.

8. The eNB of claim 1 , wherein a subframe indicator field is used to indicate an index of the downlink subframe of the secondary cell for which the cross-subframe scheduling is performed using downlink control information (DCI).

9. The eNB of claim 1 , wherein the one or more processors are further configured to receive hybrid automatic repeat request (HARQ) feedback from the one or more subframes of the secondary cell, the one or more subframes of the secondary cell corresponding to one or more uplink subframes of the primary cell based on a predefined HARQ feedback pattern.

10. The eNB of claim 1 , wherein the one or more processors are further configured to receive hybrid automatic repeat request (HARQ) feedback from a subframe of the secondary cell, the subframe of the secondary cell having a transmission direction that is different than a transmission direction of a corresponding subframe of the primary cell.

11. The eNB of claim 1 , wherein the one or more processors are further configured to receive hybrid automatic repeat request (HARQ) feedback from one or more subframes of the secondary cell that correspond with one or more uplink subframes of the primary cell, wherein the subframes of the secondary cell are not aligned with the subframes of the primary cell with respect to subframe boundaries and corresponding indexes.

12. The eNB of claim 1 , wherein the one or more processors are further configured to perform the cross-subframe scheduling for active subframes of the secondary cell and not perform the cross-subframe scheduling for dormant subframes of the secondary cell.

13. The eNB of claim 1 , wherein the primary cell on the licensed band and the secondary cell on the unlicensed band are configured to communicate to the UE using carrier aggregation.

14. An evolved node B (eNB) operable to perform downlink scheduling, the eNB having one or more processors configured to:

identify one or more subframes within a defined frame of a primary cell to perform cross-subframe scheduling for a secondary cell, wherein the one or more subframes of the primary cell include at least one of downlink subframes or special subframes, wherein the primary cell is configured to communicate with a user equipment (UE) using a licensed band and the secondary cell is configured to communicate with the UE using an unlicensed band;

perform the cross-subframe scheduling for one or more downlink subframes of the secondary cell using the one or more subframes of the primary cell; and

receive hybrid automatic repeat request (HARQ) feedback from the one or more subframes of the secondary cell, the one or more subframes of the secondary cell corresponding to one or more uplink subframes of the primary cell based on a predefined HARQ feedback pattern; and

wherein the subframes of the primary cell are not aligned with subframes of the secondary cell with respect to subframe boundaries and corresponding indexes, wherein the downlink subframe of the secondary cell has a starting time instance of t 1 and a finishing time instance of t 2 and the subframe of the primary cell has a starting time instance of t 3 and a finishing time instance of t 4 , wherein t 3 ≦t 1 and t 1 ≦t 4 ≦t 2 .

15. The eNB of claim 14 , wherein the subframes of the primary cell are aligned with subframes of the secondary cell with respect to subframe boundaries and corresponding indexes.

16. The eNB of claim 14 , wherein the one or more processors are further configured to perform the cross-subframe scheduling for each downlink subframe of the secondary cell using a single downlink control information (DCI).

17. The eNB of claim 14 , wherein the one or more processors are further configured to perform the cross-subframe scheduling for a defined number of consecutive downlink subframes of the secondary cell using a single downlink control information (DCI).

18. A method for performing downlink scheduling, the method comprising:

identifying one or more subframes within a defined frame of a primary cell to perform cross-subframe scheduling for a secondary cell, wherein the primary cell is configured to communicate with a user equipment (UE) using a licensed band and the secondary cell is configured to communicate with the UE using an unlicensed band; and

performing the cross-subframe scheduling for one or more downlink subframes of the secondary cell using the one or more subframes of the primary cell; and

wherein the subframes of the primary cell are not aligned with subframes of the secondary cell with respect to subframe boundaries and corresponding indexes, wherein the downlink subframe of the secondary cell has a starting time instance of t 1 and a finishing time instance of t 2 and the subframe of the primary cell has a starting time instance of t 3 and a finishing time instance of t 4 , wherein t 3 ≦t 1 and t 1 ≦t 4 ≦t 2 .

19. The method of claim 18 , further comprising performing the cross-subframe scheduling for the one or more downlink subframes of the secondary cell using at least one of downlink subframes of the primary cell or special subframes of the primary cell, the cross-subframe scheduling being performed in accordance with a predefined cross-subframe scheduling pattern.

20. The method of claim 18 , further comprising performing the cross-subframe scheduling for the one or more downlink subframes of the secondary cell when the subframes of the primary cell are aligned with subframes of the secondary cell with respect to subframe boundaries and corresponding indexes.

21. The method of claim 18 , further comprising:

performing the cross-subframe scheduling for the downlink subframe of the secondary cell using downlink control information (DCI), wherein a subframe index of the primary cell containing the DCI is different than a subframe index of the secondary cell for which the DCI is intended; or

performing the cross-subframe scheduling for a defined number of consecutive downlink subframes of the secondary cell using multiple downlink control informations (DCIs) from a single downlink subframe of the primary cell.

22. The method of claim 18 , further comprising receiving hybrid automatic repeat request (HARQ) feedback from the one or more subframes of the secondary cell, the one or more subframes of the secondary cell corresponding to one or more uplink subframes of the primary cell based on a predefined HARQ feedback pattern.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 26, 2020
From: INTEL CORPORATION
To: APPLE INC.
Reel/Frame 053063/0028 →
CONFIRMATORY ASSIGNMENT Recorded Jun 25, 2020
From: INTEL IP CORPORATION
To: INTEL CORPORATION
Reel/Frame 053050/0866 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 13, 2015
From: BASHAR, SHAFI; HE, HONG; FWU, JONG-KAE; HAN, SEUNGHEE
To: INTEL IP CORPORATION
Reel/Frame 035160/0640 →