IP Library Granted Patent US 9,731,796
Granted Patent B2
US 9,731,796 · App. 14/586,903 · Granted Aug 15, 2017

Well intervention semisubmersible vessel

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,731,796
App. No.
14/586,903
Granted
Aug 15, 2017
Kind
B2
Abstract

A well intervention semisubmersible vessel and method including a drilling rig further including a non-elevated derrick floor and a handling tower having a single point land out without riser tensioners. The vessel may also include a flush drill floor, a flush moonpool door, a lift frame and personnel access walkway wherein the lift frame is capable of being skidded into position by a skidding system capable of providing personnel access and wherein the skidding system comprises a plurality of skidding rails, at least one remotely operated vehicle, an intervention rising system and storage area, a crane, a moonpool and handling area, a moonpool trolley, at least one fluid pump, and/or at least one tank.

Claims (22)

1. A well intervention semisubmersible vessel, wherein the vessel has a main hull level, comprising:

a drilling rig disposed on the main hull level, the drilling rig further comprising a derrick floor formed in the main hull level at the same level as the main hull level;

a handling tower disposed on the derrick floor, wherein the handling tower comprises a single point land out without riser tensioners;

a drill floor at the same level as the main hull level;

a moonpool door slidably connected to the derrick floor wherein the moonpool door is capable of being at the same level as the main hull level;

a skidding system positioned on the derrick floor; and

a lift frame capable of being skidded into position on the skidding system to the handling tower.

2. The vessel of claim 1 further comprising a personnel access walkway.

3. The vessel of claim 1 wherein the skidding system comprises a plurality of skidding rails.

4. The vessel of claim 1 further comprising at least one remotely operated vehicle.

5. The vessel of claim 1 further comprising an intervention rising system and storage area.

6. The vessel of claim 1 further comprising a crane.

7. The vessel of claim 1 further comprising a moonpool and handling area.

8. The vessel of claim 1 further comprising a moonpool trolley.

9. The vessel of claim 1 further comprising at least one fluid pump and at least one tank.

10. A method of using a well intervention semisubmersible vessel, wherein the vessel has a main hull level and wherein the vessel comprises a drilling rig disposed on the main hull level, the drilling rig further comprising a derrick floor formed in the main hull level at the same level as the main hull level and a handling tower disposed on the derrick floor, wherein the handing tower comprises a single point land out without riser tensioners, a drill floor formed in or connected to the derrick floor, wherein the drill floor is at the same level as the main hull level, a moonpool door slidably connected to the derrick floor wherein the moonpool door is capable of being at the same level as the main hull level, a skidding system positioned on the derrick floor, and a lift frame capable of being skidded into position on the skidding system, the method which comprises the step of skidding the lift frame on the skidding system on the derrick floor to the handling tower.

11. The method of claim 10 wherein the skidding system comprises a plurality of skidding rails.

12. The method of claim 10 wherein the vessel further comprises at least one remotely operated vehicle.

13. The method of claim 10 wherein the vessel further comprises an intervention rising system and storage area.

14. The method of claim 10 wherein the vessel further comprises a moonpool and handling area.

15. The method of claim 10 wherein the vessel further comprises a moonpool trolley.

16. The method of claim 10 wherein the vessel further comprises at least one fluid pump and at least one tank.

Assignments (2)
AMENDED AND RESTATED PATENT SECURITY AGREEMENT SUPPLEMENT Recorded Jun 30, 2017
From: HELIX ENERGY SOLUTIONS GROUP, INC.
To: BANK OF AMERICA, N.A.
Reel/Frame 043070/0622 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 29, 2015
From: JOHNSTON, COLIN; CHIU, HIN
To: HELIX ENERGY SOLUTIONS GROUP, INC.
Reel/Frame 034843/0322 →