IP Library Granted Patent US 9,694,421
Granted Patent B2
US 9,694,421 · App. 14/596,814 · Granted Jul 4, 2017

Method of preheating a set of shell molds for lost-wax casting

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,694,421
App. No.
14/596,814
Granted
Jul 4, 2017
Kind
B2
Abstract

A method including preheating a set of N shell molds for lost-wax casting, where the method can comprise: individually charging shell molds into n unit electric furnaces, each of which has previously been preheated to an initial loading temperature; starting a predefined preheating cycle for each shell mold charged in the unit electric furnaces, with a preheating cycle comprising raising the temperature of the furnace in compliance with a predefined ramp up to a predetermined setpoint temperature, and holding the furnace at the setpoint temperature for a predetermined duration; and at the end of each preheating cycle, unloading the shell mold in question and repeating the two preceding operations for another non-preheated shell mold.

Claims (17)

1. A method involving a plurality of metal parts, each metal part being molded from a shell mold for lost-wax casting, the method being carried out in an installation comprising a plurality of preheat electric furnaces and a single pouring furnace distinct from the plurality of preheat electric furnaces, the method comprising:

loading a first shell mold in a first preheat electric furnace which has previously been preheated to a first initial loading temperature;

starting a first predefined preheating cycle for the first shell mold charged in the first preheat electric furnace;

loading a second shell mold in a second preheat electric furnace which has previously been preheated to a second initial loading temperature;

starting a second predefined preheating cycle for the second shell mold charged in the second preheat electric furnace;

unloading the first shell mold from the first preheat electric furnace;

loading the unloaded first shell mold in the single pouring furnace;

introducing a molten metal in the first shell mold present in the single pouring furnace; and

unloading the first shell mold from the single pouring furnace after pouring the molten metal in the first shell mold,

wherein, during said introducing the molten metal in the first shell mold, the second shell mold is kept inside the second preheat electric furnace, the second shell mold being unloaded from the second preheat electric furnace and loaded in the single pouring furnace after the first shell mold is unloaded from the single pouring furnace.

2. The method according to claim 1 , wherein a third shell mold is loaded in the first preheat electric furnace after the first shell mold is unloaded from the first preheat electric furnace.

3. The method according to claim 2 , wherein the third shell mold is loaded in the first preheat electric furnace when the first preheat electric furnace is at the first initial loading temperature.

4. The method according to claim 2 , wherein the third shell mold is loaded in the first preheat furnace when the temperature of the first preheat electric furnace after the first shell mold is unloaded is close to a third initial loading temperature for the third shell mold.

5. The method according to claim 1 , wherein each said predefined preheating cycle comprises raising the temperature in a preheat electric furnace in compliance with a predefined ramp up to a predetermined setpoint temperature and holding said preheat electric furnace at the setpoint temperature for a predetermined duration.

6. The method according to claim 5 , wherein the rise in the temperature of the preheating cycle is spread over a duration in the range of 15 minutes to 60 minutes, and the preheat electric furnace is held at the predetermined setpoint temperature for the predetermined duration in the range 1.5 hours to 3 hours.

7. The method according to claim 5 , wherein each said predetermined setpoint temperature for the predefined preheating cycle is adapted to pouring conditions for a corresponding shell mold.

8. The method according to claim 1 , wherein each said initial loading temperature is limited by a high temperature threshold that is defined so as to avoid any unwanted damage to a corresponding shell mold by thermal shock while said corresponding shell mold is being charged into a corresponding preheat electric furnace.

Assignments (3)
CORRECTIVE ASSIGNMENT TO CORRECT THE COVER SHEET TO REMOVE APPLICATION NOS. 10250419, 10786507, 10786409, 12416418, 12531115, 12996294, 12094637 12416422 PREVIOUSLY RECORDED ON REEL 046479 FRAME 0807. ASSIGNOR(S) HEREBY CONFIRMS THE CHANGE OF NAME. Recorded Aug 24, 2018
From: SNECMA
To: SAFRAN AIRCRAFT ENGINES
Reel/Frame 046939/0336 →
CHANGE OF NAME Recorded May 23, 2018
From: SNECMA
To: SAFRAN AIRCRAFT ENGINES
Reel/Frame 046479/0807 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 29, 2015
From: CALERO, PATRICK ALBERT; LALLEMENT, BERNARD LOUIS; TENNE, SERGE; RAPPART, YVAN
To: SNECMA
Reel/Frame 035924/0604 →