IP Library Patent Application 14608602
Patent Application
App. No. 14/608,602

OVERLOAD LIMITATION IN PEAK POWER OPERATION

Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US None
App. No.
14/608,602
Abstract

An exemplary method for operating a converter to supply electrical power to a load includes controlling the converter for a provided overload time so that overload power is applied to the load, and controlling the converter for a provided resting time, so that resting power is applied to the load. The overload power is higher than a nominal power which corresponds to a steady-state operation limit of the converter, wherein the resting power is lower than the nominal power.

Claims (17)

1 . A method for operating a converter to supply electrical power to a load, comprising:

controlling the converter for a provided overload time period, so that overload power is applied to the load; and

controlling the converter for a provided resting time period, so that resting power is applied to the load,

wherein the overload power is higher than a nominal power, which corresponds to a steady-state operation limit of the converter, and the resting power is lower than the nominal power,

wherein the converter is controlled in response to externally provided information,

wherein the power applied to the load is limited as soon as the externally provided information causes the converter to provide overload power for more than a given maximum overload time period, and

wherein after the maximum overload time period the power to be applied to the load is limited according to a limitation function which provides a limitation value that reduces an allowable power from the overload power to the nominal power according to predetermined time characteristics.

2 . The method according to claim 1 , wherein the resting power and resting time period are set such that at least one parameter returns to an initial value at the start of the overload time period.

3 . The method according to claim 1 , wherein the overload power and overload time period are set such that at least one parameter does not exceed a limit during the overload time period.

4 . The method according to claim 2 , wherein the at least one parameter is a temperature of the converter.

5 . The method according to claim 3 , wherein the at least one parameter is a temperature of the converter.

6 . The method according to claim 1 , wherein the resting time period follows the overload period.

7 . The method according to claim 1 , wherein the resting time period directly follows the overload period.

8 . The method according to claim 1 , wherein the overload time period and the resting time period are periodically repeated.

9 . The method according to claim 1 , wherein the maximum overload time period is a period in which a temperature in the converter arrives at a predetermined maximum temperature limit.

10 . The method according to claim 1 , wherein the predetermined time characteristics defines a linear slope from the overload power to the nominal power.

11 . The method according to claim 1 , wherein the predetermined time characteristics defines an exponential slope from the overload power to the nominal power.

Assignments (3)
MERGER Recorded Nov 15, 2016
From: ABB TECHNOLOGY LTD.
To: ABB SCHWEIZ AG
Reel/Frame 040621/0929 →
MERGER Recorded Oct 20, 2016
From: ABB TECHNOLOGY AG
To: ABB SCHWEIZ AG
Reel/Frame 040436/0221 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 29, 2015
From: SIEMASZKO, DANIEL; ECKERLE, JOHN; DOUZDOUZANI, ATA; RUETTEN, KLAUS
To: ABB TECHNOLOGY AG
Reel/Frame 034843/0393 →