IP Library Granted Patent US 9,714,558
Granted Patent B2
US 9,714,558 · App. 14/614,100 · Granted Jul 25, 2017

Open hole expandable junction

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,714,558
App. No.
14/614,100
Granted
Jul 25, 2017
Kind
B2
Abstract

A method for forming a lateral junction in an open hole section of a wellbore includes lowering a tubular member through a cased section of the wellbore. Thereafter, the tubular member is expanded in an open hole section of the wellbore, thereby anchoring the tubular member in the wellbore in a manner that leaves an open hole section of the wellbore between the expanded, tubular member and the cased section. Thereafter, a window is formed in a sidewall of the tubular member, and a lateral wellbore is drilled through the window.

Claims (48)

1. A method for forming a lateral junction in an open hole section of a wellbore, comprising:

lowering a tubular member through a cased section of the wellbore;

expanding the tubular member in the open hole section of the wellbore, wherein an uncased section of the wellbore is disposed between the cased section and the tubular member such that the cased section is separated from the tubular member;

anchoring the tubular member directly to a wall of the open hole section of the wellbore;

forming a window in a sidewall of the tubular member; and

drilling a lateral wellbore through the window.

2. The method of claim 1 , wherein the tubular member comprises a hex shape after expansion.

3. The method of claim 1 , wherein an uphole end of the tubular member includes a depth sensing device.

4. The method of claim 1 , wherein an inner diameter of the cased section is substantially the same as an inner diameter of the wellbore.

5. The method of claim 4 , wherein an inner diameter of the tubular member is substantially the same as the inner diameter of the wellbore.

6. The method of claim 1 , wherein an outer surface of the first tubular includes one or more contact structures coupled thereto.

7. The method of claim 1 , wherein the first tubular comprises an anchor section and a window section.

8. A method for forming a lateral junction in an open hole section of a primary wellbore, the method comprising:

drilling a primary wellbore to a first depth;

casing a first section of the primary wellbore from the surface to a second depth that is less than the first depth;

running-in a first tubular member through the first section and into the open hole section to a third depth that is less than the first depth and greater than the second depth;

expanding the first tubular directly against a wall of the open hole section of the primary wellbore;

forming a window in a sidewall of the first tubular; and

drilling a second wellbore through the window.

9. The method of claim 8 , wherein the first tubular member comprises a hex shape after expansion.

10. The method of claim 8 , wherein an uphole end of the tubular member includes a depth sensing device.

11. The method of claim 8 , wherein an inner diameter of the casing is substantially the same as an inner diameter of the primary wellbore.

12. The method of claim 11 , wherein an inner diameter of the first tubular member is substantially the same as the inner diameter of the primary wellbore.

13. The method of claim 8 , wherein an outer surface of the first tubular member includes one or more contact structures coupled thereto.

14. The method of claim 8 , wherein the first tubular member comprises an anchor section and a window section.

15. The method of claim 8 , further comprising:

running-in a second tubular through the first section, the first tubular and the window into the second wellbore;

expanding the second tubular against a wall of the second wellbore;

forming a window in a sidewall of the second tubular; and

drilling a third wellbore through the window.

16. The method of claim 15 , further comprising:

positioning a seal against a wall of the first tubular to isolate production from the second and third wellbores.

17. The method of claim 8 , further comprising:

running-in a second tubular through the first section to a fourth depth that is greater than the first depth and less than the third depth;

expanding the second tubular against the wall of the open hole section of the primary wellbore;

forming a window in the sidewall of the second tubular; and

drilling a third wellbore through the window.

18. A method for forming a lateral junction in an open hole section of a wellbore, the method comprising:

running-in a first tubular member through a cased section of a primary wellbore;

expanding the first tubular member in an open hole section of the primary wellbore thereby anchoring the first tubular member directly to a wall of the open hole section of the primary wellbore, wherein an uncased section of the primary wellbore separates the cased section and the first tubular member;

forming a window in a sidewall of the first tubular member; and

drilling a first lateral wellbore through the window, wherein the first tubular member comprises at least one anchor section and a window section.

19. The method of claim 18 , further comprising:

running-in a second tubular member through the first tubular member;

expanding the second tubular against the wall of the open hole section of the primary wellbore or the first lateral wellbore;

forming a window in a sidewall of the second tubular member; and

drilling a third lateral wellbore through the window.

20. The method of claim 18 , wherein the first tubular member comprises a hex shape after expansion.

Assignments (9)
PATENT SECURITY INTEREST ASSIGNMENT AGREEMENT Recorded Apr 26, 2023
From: DEUTSCHE BANK TRUST COMPANY AMERICAS
To: WELLS FARGO BANK, NATIONAL ASSOCIATION
Reel/Frame 063470/0629 →
SECURITY INTEREST Recorded Oct 1, 2021
From: WEATHERFORD TECHNOLOGY HOLDINGS, LLC; WEATHERFORD NETHERLANDS B.V.; WEATHERFORD NORGE AS; HIGH PRESSURE INTEGRITY, INC.; PRECISION ENERGY SERVICES, INC.; WEATHERFORD CANADA LTD.; WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH; WEATHERFORD U.K. LIMITED
To: WILMINGTON TRUST, NATIONAL ASSOCIATION
Reel/Frame 057683/0706 →
RELEASE OF SECURITY INTEREST Recorded Oct 1, 2021
From: WILMINGTON TRUST, NATIONAL ASSOCIATION
To: WEATHERFORD TECHNOLOGY HOLDINGS, LLC; WEATHERFORD NETHERLANDS B.V.; WEATHERFORD NORGE AS; HIGH PRESSURE INTEGRITY, INC.; PRECISION ENERGY SERVICES, INC.; WEATHERFORD CANADA LTD; WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH; PRECISION ENERGY SERVICES ULC; WEATHERFORD U.K. LIMITED
Reel/Frame 057683/0423 →
SECURITY INTEREST Recorded Aug 28, 2020
From: WEATHERFORD TECHNOLOGY HOLDINGS, LLC; WEATHERFORD NETHERLANDS B.V.; WEATHERFORD NORGE AS; HIGH PRESSURE INTEGRITY, INC.; PRECISION ENERGY SERVICES, INC.; WEATHERFORD CANADA LTD.; WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH; PRECISION ENERGY SERVICES ULC; WEATHERFORD U.K. LIMITED
To: WILMINGTON TRUST, NATIONAL ASSOCIATION
Reel/Frame 054288/0302 →
RELEASE OF SECURITY INTEREST Recorded Aug 28, 2020
From: WELLS FARGO BANK, NATIONAL ASSOCIATION
To: WEATHERFORD TECHNOLOGY HOLDINGS, LLC; WEATHERFORD NETHERLANDS B.V.; WEATHERFORD NORGE AS; HIGH PRESSURE INTEGRITY, INC.; PRECISION ENERGY SERVICES, INC.; WEATHERFORD CANADA LTD.; WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH; PRECISION ENERGY SERVICES ULC; WEATHERFORD U.K. LIMITED
Reel/Frame 053838/0323 →
SECURITY INTEREST Recorded Dec 26, 2019
From: WEATHERFORD TECHNOLOGY HOLDINGS, LLC; WEATHERFORD NETHERLANDS B.V.; WEATHERFORD NORGE AS; HIGH PRESSURE INTEGRITY, INC.; PRECISION ENERGY SERVICES, INC.; WEATHERFORD CANADA LTD.; WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH; PRECISION ENERGY SERVICES ULC; WEATHERFORD U.K. LIMITED
To: DEUTSCHE BANK TRUST COMPANY AMERICAS, AS ADMINISTRATIVE AGENT
Reel/Frame 051419/0140 →
SECURITY INTEREST Recorded Dec 18, 2019
From: WEATHERFORD TECHNOLOGY HOLDINGS LLC; WEATHERFORD NETHERLANDS B.V.; WEATHERFORD NORGE AS; HIGH PRESSURE INTEGRITY INC.; PRECISION ENERGY SERVICES INC.; WEATHERFORD CANADA LTD.; WEATHERFORD SWITZERLAND TRADING AND DEVELOPMENT GMBH; PRECISION ENERGY SERVICES ULC; WEATHERFORD U.K. LIMITED
To: WELLS FARGO BANK NATIONAL ASSOCIATION AS AGENT
Reel/Frame 051891/0089 →
NUNC PRO TUNC ASSIGNMENT Recorded Sep 29, 2015
From: WEATHERFORD/LAMB, INC.
To: WEATHERFORD TECHNOLOGY HOLDINGS, LLC
Reel/Frame 036709/0793 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 27, 2015
From: BARKER, RONALD GORDON; FARLEY, DOUGLAS BRIAN; HOGG, WILLIAM CLIFFORD
To: WEATHERFORD/LAMB, INC.
Reel/Frame 035278/0528 →