IP Library Granted Patent US 9,783,066
Granted Patent B2
US 9,783,066 · App. 14/655,265 · Granted Oct 10, 2017

Power supply device for hybrid construction machinery, and method therefor

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,783,066
App. No.
14/655,265
Granted
Oct 10, 2017
Kind
B2
Abstract

The present disclosure relates to a power supply device for hybrid construction machinery, and more particularly, to a power supply device for hybrid construction machinery, which is capable of reducing engine loads and facilitating improvement of engine efficiency by excluding a starting motor used in general hybrid construction machinery and an alternator for charging a battery from hybrid construction machinery, such as a hybrid excavator or vehicle, which commonly uses an engine and an electric motor as a power source and includes an electric energy storage device, and a method for the same.

Claims (18)

1. A power supply device for hybrid construction machinery having a first capacitor means and a second capacitor means including an engine, a load motor, a battery, and an electric system, comprising:

an engine auxiliary motor configured to start the engine when the hybrid construction machinery starts and to generate electrical energy;

a first capacitor means positioned between a first inverter configured to be connected to the engine auxiliary motor and a second inverter configured to be connected to the load motor, and accumulate electric energy generated by the engine auxiliary motor;

a second capacitor means configured to supply electric energy to the engine auxiliary motor through the first capacitor means when the hybrid construction machinery starts;

a power conversion means positioned between a converter connected to the second capacitor means and the battery, and connected to the first capacitor means and the electric system to convert power; and

a controller configured to charge the second capacitor means by using electric energy of the battery when a voltage of the second capacitor means is smaller than a reference voltage necessary for initially starting the engine when the hybrid construction machinery starts, and supply the electric energy accumulated in the first capacitor means to the electric system when the hybrid construction machinery is normally operated.

2. The power supply device of claim 1 , wherein when the voltage of the second capacitor means is smaller than the reference voltage necessary for initially starting the engine when the hybrid construction machinery starts, the controller controls the power conversion means, so that charging energy is supplied to the second capacitor means from the battery, and when the voltage of the second capacitor means is equal to or larger than the reference voltage necessary for initially starting the engine, the controller controls the second capacitor means to supply electric energy to the engine auxiliary motor to start the engine.

3. The power supply device of claim 1 , further comprising:

a switching means configured to make the second capacitor means be charged by the battery by electrically conducting the battery and the second capacitor means only when the voltage of the second capacitor means is smaller than the reference voltage necessary for initially starting the engine when the hybrid construction machinery starts.

4. The power supply device of claim 1 , further comprising:

a current control means configured to supply electric energy to the electric system from the battery, instead of the power conversion means, when the power conversion means has a defect.

5. A power supply method for hybrid construction machinery, comprising:

checking a voltage of a the second capacitor means when the hybrid construction machinery starts;

accumulating electric energy in the the second capacitor means by using electric energy of a battery when a voltage of the the second capacitor means is smaller than a reference voltage necessary for initially starting an engine when the hybrid construction machinery starts;

supplying electric energy to an engine auxiliary motor from the second capacitor means and starting the engine when the voltage of the the second capacitor means is equal to or larger than the reference voltage necessary for initially starting the engine; and

performing a normal operation of supplying electric energy accumulated in a the second capacitor means to an electric system when the hybrid construction machinery normally operates.

6. The power supply method of claim 5 , further comprising:

when a power conversion means has a defect, supplying electric energy to the electric system from the battery, instead of the power conversion means to respond to the defect.

Assignments (3)
CHANGE OF NAME Recorded Dec 4, 2023
From: DOOSAN INFRACORE CO., LTD.
To: HYUNDAI DOOSAN INFRACORE CO., LTD.
Reel/Frame 065761/0942 →
CHANGE OF NAME Recorded Dec 4, 2023
From: HYUNDAI DOOSAN INFRACORE CO., LTD.
To: HD HYUNDAI INFRACORE CO., LTD.
Reel/Frame 065761/0957 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 24, 2015
From: KIM, CHOON TACK; KIM, KYEONG KEUN
To: DOOSAN INFRACORE CO., LTD.
Reel/Frame 035897/0946 →