IP Library Granted Patent US 9,213,722
Granted Patent B2
US 9,213,722 · App. 14/673,406 · Granted Dec 15, 2015

Elevation adjustment for an aquatic geographic information system

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,213,722
App. No.
14/673,406
Granted
Dec 15, 2015
Kind
B2
Abstract

A method of processing geo-statistical data includes piloting a watercraft with a monitoring system on a water body, measuring depths of the water body, elevations of the watercraft, and positions of the watercraft using the monitoring system. The method also includes aligning the depths and the elevations with the positions, creating an average elevation using the elevations, and creating a contour map from the depths, positions, and the first average elevation.

Claims (71)

1. A method of processing geo-statistical data, the method comprising:

piloting a first watercraft on a water body, the first watercraft including a first monitoring system;

measuring a first plurality of depths of the water body using the first monitoring system;

measuring a first plurality of elevations of the first watercraft using the first monitoring system;

measuring a first plurality of positions of the first watercraft using the first monitoring system;

aligning the first plurality of depths and the first plurality of elevations with the first plurality of positions;

creating a first average elevation using the first plurality of elevations;

creating a first contour map from the first plurality of depths, the first plurality of positions, and the first average elevation;

piloting a second watercraft on a water body, the second watercraft including a second monitoring system;

measuring a second plurality of depths of the water body using the second monitoring system;

measuring a second plurality of elevations of the second watercraft using the second monitoring system;

measuring a second plurality of positions of the second watercraft using the second monitoring system;

aligning the second plurality of depths and the second plurality of elevations with the second plurality of positions;

creating a second average elevation using the second plurality of elevations; and

comparing the first average elevation to the second average elevation to create an elevation difference; and

adjusting by the elevation difference at least one of each of first plurality of depths and each of the second plurality of depths to compute at least one of an adjusted first plurality of depths and an adjusted second plurality of depths.

2. The method of claim 1 , wherein the first watercraft is the same as the second watercraft.

3. The method of claim 1 , wherein the first monitoring system is the same as the second monitoring system.

4. The method of claim 1 , wherein the contour map is created from the first and second pluralities of depths, elevations, and positions and the first and second average elevations.

5. The method of claim 1 , wherein the contour map includes a plurality of depth ranges and the method further comprises:

taking a first plurality of measurements of a water body parameter of the water body using one of the first monitoring system and the second monitoring system;

aligning the first plurality of measurements with one of the first plurality of positions and the second plurality of positions; and

correlating the first plurality of measurements to at least one of the depth ranges to create a report.

6. The method of claim 1 , wherein the water body parameter describes one of water temperature, barometric pressure, plant height, plant biovolume, area covered by plants, biomass, substrate hardness/softness, and bottom hardness/softness.

7. The method of claim 1 , and further comprising:

creating a second contour map using at least one of the adjusted first plurality of depths and the adjusted second plurality of depths.

8. The method of claim 1 , and further comprising:

creating a third contour map using at least one of the adjusted first plurality of depths and the second plurality of depths.

9. The method of claim 1 , and further comprising:

creating a third contour map using at least one of the first plurality of depths and the adjusted second plurality of depths.

10. The method of claim 1 , wherein the first average elevation and the second average elevations are calculated numerical averages of the first plurality of depths and the second plurality of depths, respectively.

11. A geographic information system comprising:

a first monitoring system comprising:

a first depth measurement device for measuring a depth of a water body wherein the first monitoring system is configured to record first depth data points;

a first position measurement device for measuring a position of the monitoring system wherein the first monitoring system is configured to record first coordinate data points; and

a first elevation measurement device for measuring an elevation of the monitoring system wherein the first monitoring system is configured to record first elevation data points;

a first data link connected to the first monitoring system;

a network connected to the data link;

a server connected to the network;

a database connected to the network; and

a user computer connected to the network;

wherein the server is configured to receive the first depth data points, the first coordinate data points, and the first elevation data points, align the first depth data points and the first elevation data points with the first coordinate data points, create a first average elevation, create a contour map of the water body from the first depth data points, the first coordinate data points, and the first average elevation.

12. The geographic information system of claim 11 , and further comprising:

a second monitoring system comprising:

a second depth measurement device for measuring a depth of a water body wherein the second monitoring system is configured to record second depth data points;

a second position measurement device for measuring a position of the monitoring system wherein the second monitoring system is configured to record second coordinate data points; and

an second elevation measurement device for measuring an elevation of the monitoring system wherein the second monitoring system is configured to record second elevation data points;

a second data link connected to the second monitoring system;

wherein the server is additionally configured to receive the second depth data points, the second coordinate data points, and the second elevation data points from the second monitoring system, align the second depth data points and the second elevation data points with the second coordinate data points, create a second average elevation, compare the first average elevation to the second average elevation to create an elevation difference, and adjust by the elevation difference at least one of each of data point of the first and second depth data.

13. The geographic information system of claim 12 , wherein the first monitoring system is the same as the second monitoring system.

14. The geographic information system of claim 12 , wherein the first average elevation and the second average elevations are calculated numerical averages of the first elevation data points and the second elevation data points, respectively.

15. A method of processing geo-statistical data, the method comprising:

receiving by a server from a first water body monitoring system a first plurality of depth data points, a first plurality of elevation data points, and a first plurality of coordinate data points from where the first plurality of depth data points and first plurality of elevation data points were measured;

receiving by the server from a second water body monitoring system a second plurality of depth data points, a second plurality of elevation data points, and a second plurality of coordinate data points from where the second plurality of depth data points and second plurality of elevation data points were measured;

aligning by the server the first plurality of depth data points and the first plurality of elevation data points with the first plurality of coordinate data points;

aligning by the server the second plurality of depth data points and the second plurality of elevation data points with the second plurality of coordinate data points;

extracting by the server the first plurality of elevation data points;

extracting by the server the second plurality of elevation data points;

creating by the server a first average elevation from the first plurality of elevation data points;

creating by the server a second average elevation from the second plurality of elevation data points;

comparing the first average elevation to the second average elevation to create an elevation difference; and

adjusting by the elevation difference at least one of each of data point of the first plurality of depth data points and the second plurality of depth data points.

16. The method of claim 15 , wherein the first water body monitoring system is the same as the second water body monitoring system.

17. The method of claim 15 , wherein the first average elevation and the second average elevations are calculated numerical averages of the first plurality of elevation data points and the second plurality of elevation data points, respectively.

18. The method of claim 15 , wherein:

the server receives a first plurality of water body parameter data points; and

the method further comprises:

providing a contour map of the water body having a plurality of depth ranges;

correlating the first plurality of water body parameter data points to at least one of the depth ranges to create a report.

19. The method of claim 18 , wherein the first plurality of water body parameter data points were taken along with at least one of the first plurality of coordinate data points and the second plurality of coordinate data points.

20. The method of claim 18 , wherein each of the first plurality of water body parameter data points describes one of water temperature, barometric pressure, plant height, plant biovolume, area covered by plants, biomass, substrate hardness/softness, and bottom hardness/softness.

Assignments (4)
NUNC PRO TUNC ASSIGNMENT Recorded Jan 16, 2024
From: NAVICO HOLDING AS
To: NAVICO, INC.
Reel/Frame 066338/0107 →
RELEASE OF SECURITY INTEREST Recorded Oct 12, 2021
From: GLAS AMERICAS LLC
To: NAVICO HOLDING AS
Reel/Frame 057780/0496 →
SECURITY INTEREST Recorded Mar 31, 2017
From: NAVICO HOLDING AS
To: GLAS AMERICAS LLC
Reel/Frame 042121/0692 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 30, 2015
From: LAUENSTEIN, MICHAEL; JOHNSON, MATTHEW
To: NAVICO HOLDING AS
Reel/Frame 035292/0001 →