IP Library Granted Patent US 10,142,401
Granted Patent B2
US 10,142,401 · App. 14/684,408 · Granted Nov 27, 2018

Management of computing infrastructure under emergency peak capacity conditions

Inventors: Eric J. Bauer (Freehold, NJ); John H. Haller (Naperville, IL); Frederik G A Vandeputte (West-Vlaanderen, BE)
Assignees: Nokia of America Corporation; Alcatel Lucent
H04L67/10H04L41/0896H04L41/5025H04L43/0817H04L41/5096
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,142,401
App. No.
14/684,408
Granted
Nov 27, 2018
Kind
B2
Abstract

A capability for management of computing infrastructure under emergency peak capacity conditions is presented. The capability for management of computing infrastructure under emergency peak capacity conditions may support configuration of computing infrastructure to provide additional computing capacity for the emergency peak capacity conditions. The computing infrastructure may include capacity supporting equipment configured to provide computing capacity of the computing infrastructure and environmental equipment configured to support operation of the capacity supporting equipment. The configuration of computing infrastructure to support additional computing capacity for an emergency peak capacity condition may include configuration of capacity supporting equipment to operate in emergency operating mode, rather than normal operating mode, to support the additional computing capacity for the emergency peak capacity condition. The configuration of cloud computing infrastructure to provide additional computing capacity for an emergency peak capacity condition may include configuration of environmental equipment to support operation of capacity supporting equipment in emergency operating mode.

Claims (40)

1. An apparatus, comprising:

a processor and a memory communicatively connected to the processor, the processor configured to:

monitor a computing environment comprising capacity supporting equipment configured to provide computing capacity within the computing environment and environmental equipment configured to control environmental conditions of the computing environment;

detect a first emergency peak capacity condition associated with a first element of the capacity supporting equipment and a second emergency peak capacity condition associated with a second element of the capacity supporting equipment;

initiate handling of the first emergency peak capacity condition by the first element of the capacity supporting equipment, wherein the handling of the first emergency peak capacity condition by the first element of the capacity supporting equipment comprises initiating a management action by sending a message for configuring the first element of the capacity supporting equipment to provide additional computing capacity for the first emergency peak capacity condition; and

initiate handling of the second emergency peak capacity condition, by the first element of the capacity supporting equipment or the second element of the capacity supporting equipment, based on the handling of the first emergency peak capacity condition by the first element of the capacity supporting equipment.

2. The apparatus of claim 1 , wherein the computing environment is engineered to support normal peak capacity conditions rather than engineered to support emergency peak capacity conditions.

3. The apparatus of claim 1 , wherein the management action is configured to trigger a change of the first element of the capacity supporting equipment from operating in a normal operating mode to operating in an emergency operating mode.

4. The apparatus of claim 1 , wherein the management action comprises at least one of configuring the first element of the capacity supporting equipment to perform overclocking, raising a supply voltage of the first element of the capacity supporting equipment, or raising a maximum acceptable temperature of the first element of the capacity supporting equipment.

5. The apparatus of claim 1 , wherein the handling of the first emergency peak capacity condition by the first element of the capacity supporting equipment comprises initiating a management action by sending a message for configuring an active cooling mechanism of the first element of the capacity supporting equipment to provide additional cooling for the first element of the capacity supporting equipment.

6. The apparatus of claim 5 , wherein, to initiate handling of the second emergency peak capacity condition, the processor is configured to:

initiate handling of the second emergency peak capacity condition by the second element of the capacity supporting equipment based on a determination that cooling for the first element of the capacity supporting equipment is provided by the active cooling mechanism of the first element of the capacity supporting equipment.

7. The apparatus of claim 6 , wherein the handling of the second emergency peak capacity condition by the second element of the capacity supporting equipment comprises initiating a management action by sending a message for configuring the second element of the capacity supporting equipment to provide additional computing capacity for the second emergency peak capacity condition.

8. The apparatus of claim 6 , wherein the handling of the second emergency peak capacity condition by the second element of the capacity supporting equipment comprises at least one of initiating a management action by sending a message for configuring an active cooling mechanism of the second element of the capacity supporting equipment to provide additional cooling for the second element of the capacity supporting equipment or initiating an environmental management action by sending a message for configuring an element of the environmental equipment to provide additional cooling for the second element of the capacity supporting equipment.

9. The apparatus of claim 5 , wherein, to initiate handling of the second emergency peak capacity condition, the processor is configured to:

initiate handling of the second emergency peak capacity condition by the first element of the capacity supporting equipment, rather than by the second element of the capacity supporting equipment, based on a determination that additional cooling for the first element of the capacity supporting equipment is currently being provided by the active cooling mechanism of the first element of the capacity supporting equipment.

10. The apparatus of claim 9 , wherein the handling of the second emergency peak capacity condition by the first element of the capacity supporting equipment comprises initiating a management action by sending a message for configuring the first element of the capacity supporting equipment to provide additional computing capacity for the second emergency peak capacity condition.

11. The apparatus of claim 9 , wherein the handling of the second emergency peak capacity condition by the first element of the capacity supporting equipment comprises at least one of initiating a management action by sending a message for configuring the active cooling mechanism of the first element of the capacity supporting equipment to provide additional cooling for the first element of the capacity supporting equipment or initiating an environmental management action by sending a message for configuring an element of the environmental equipment to provide additional cooling for the first element of the capacity supporting equipment.

12. The apparatus of claim 1 , wherein the handling of the first emergency peak capacity condition by the first element of the capacity supporting equipment comprises initiating an environmental management action by sending a message for configuring an element of the environmental equipment to provide additional cooling for the first element of the capacity supporting equipment.

13. The apparatus of claim 12 , wherein the environmental management action comprises at least one of adjusting an operating parameter of a controller of an air conditioning system, adjusting an operating parameter of a controller of a coolant circulation system, or adjusting an operating parameter of a controller of a fan.

14. The apparatus of claim 12 , wherein, to initiate handling of the second emergency peak capacity condition, the processor is configured to:

initiate handling of the second emergency peak capacity condition by the second element of the capacity supporting equipment based on a determination that cooling for the second element of the capacity supporting equipment is provided by the element of the environmental equipment.

15. The apparatus of claim 14 , wherein the handling of the second emergency peak capacity condition by the second element of the capacity supporting equipment comprises initiating a management action by sending a message for configuring the second element of the capacity supporting equipment to provide additional computing capacity for the second emergency peak capacity condition.

16. The apparatus of claim 14 , wherein the handling of the second emergency peak capacity condition by the second element of the capacity supporting equipment comprises at least one of initiating a management action by sending a message for configuring an active cooling mechanism of the second element of the capacity supporting equipment to provide additional cooling for the second element of the capacity supporting equipment or initiating an environmental management action by sending a message for configuring a second element of the environmental equipment to provide additional cooling for the second element of the capacity supporting equipment.

17. The apparatus of claim 12 , wherein, to initiate handling of the second emergency peak capacity condition, the processor is configured to:

initiate handling of the second emergency peak capacity condition by the first element of the capacity supporting equipment, rather than by the second element of the capacity supporting equipment, based on a determination that the element of the environmental equipment is currently providing additional cooling for the first element of the capacity supporting equipment.

18. The apparatus of claim 17 , wherein the handling of the second emergency peak capacity condition by the first element of the capacity supporting equipment comprises initiating a management action by sending a message for configuring the first element of the capacity supporting equipment to provide additional computing capacity for the second emergency peak capacity condition.

19. The apparatus of claim 17 , wherein the handling of the second emergency peak capacity condition by the first element of the capacity supporting equipment comprises at least one of initiating a management action by sending a message for configuring an active cooling mechanism of the first element of the capacity supporting equipment to provide additional cooling for the first element of the capacity supporting equipment or initiating an environmental management action by sending a message for configuring a second element of the environmental equipment to provide additional cooling for the first element of the capacity supporting equipment.

20. The apparatus of claim 1 , wherein, to initiate handling of the second emergency peak capacity condition, the processor is configured to:

initiate handling of the second emergency peak capacity condition by the first element of the capacity supporting equipment, rather than by the second element of the capacity supporting equipment, based on a determination that additional cooling is currently being provided for the first element of the capacity supporting equipment.

21. A non-transitory computer-readable storage medium storing instructions which, when executed by a processor, cause the processor to perform a method, the method comprising:

monitoring a computing environment comprising capacity supporting equipment configured to provide computing capacity within the computing environment and environmental equipment configured to control environmental conditions of the computing environment;

detecting a first emergency peak capacity condition associated with a first element of the capacity supporting equipment and a second emergency peak capacity condition associated with a second element of the capacity supporting equipment;

initiating handling of the first emergency peak capacity condition by the first element of the capacity supporting equipment, wherein the handling of the first emergency peak capacity condition by the first element of the capacity supporting equipment comprises initiating a management action by sending a message for configuring the first element of the capacity supporting equipment to provide additional computing capacity for the first emergency peak capacity condition; and

initiating handling of the second emergency peak capacity condition, by the first element of the capacity supporting equipment or the second element of the capacity supporting equipment, based on the handling of the first emergency peak capacity condition by the first element of the capacity supporting equipment.

22. A method, comprising:

monitoring, by a processor, a computing environment comprising capacity supporting equipment configured to provide computing capacity within the computing environment and environmental equipment configured to control environmental conditions of the computing environment;

detecting, by the processor, a first emergency peak capacity condition associated with a first element of the capacity supporting equipment and a second emergency peak capacity condition associated with a second element of the capacity supporting equipment;

initiating, by the processor, handling of the first emergency peak capacity condition by the first element of the capacity supporting equipment, wherein the handling of the first emergency peak capacity condition by the first element of the capacity supporting equipment comprises initiating a management action by sending a message for configuring the first element of the capacity supporting equipment to provide additional computing capacity for the first emergency peak capacity condition; and

initiating, by the processor, handling of the second emergency peak capacity condition, by the first element of the capacity supporting equipment or the second element of the capacity supporting equipment, based on the handling of the first emergency peak capacity condition by the first element of the capacity supporting equipment.

Assignments (4)
MERGER AND CHANGE OF NAME Recorded Sep 12, 2018
From: NOKIA SOLUTIONS AND NETWORKS US LLC; ALCATEL-LUCENT USA INC.; ALCATEL-LUCENT USA INC.
To: NOKIA OF AMERICA CORPORATION
Reel/Frame 046849/0077 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 12, 2017
From: ALCATEL-LUCENT BELL N.V.
To: ALCATEL LUCENT
Reel/Frame 042238/0797 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 20, 2015
From: BAUER, ERIC J.; HALLER, JOHN H.
To: ALCATEL-LUCENT USA INC.
Reel/Frame 035678/0167 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 20, 2015
From: VANDEPUTTE, FREDERIK GA
To: ALCATEL-LUCENT BELL N.V.
Reel/Frame 035678/0231 →
Continuity (1)
Related Publication 20160301586A1 · Oct 13, 2016