IP Library Granted Patent US 10,380,272
Granted Patent B2
US 10,380,272 · App. 14/700,724 · Granted Aug 13, 2019

Update computer-implemented method, computer program product and computer system for generating or updating topology model of pressure pipe network

Inventors: Yong Deng Hu (Beijing, CN); Eoin Lane (Littleton, MA); Xiao Lv (Beijing, CN); Jian Wang (Beijing, CN); Ke Zhang (Beijing, CN)
Assignee: International Business Machines Corporation
G06F17/5004G01F1/00G01M3/2807G06F17/50H04L41/12H04L67/12G06F17/509G06F17/5095G06F2217/34
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,380,272
App. No.
14/700,724
Filed
Apr 30, 2015
Granted
Aug 13, 2019
Kind
B2
Art Unit
2895
USPC
702/50
Abstract

A computer-implemented method, computer program product and computing system for management of a pressure pipe network is provided. A processor retrieves a topology model of a pipe network. The processor retrieves one or more measurement expressions of the pressure pipe network. The processor determines a parameter list for a first measurement expression, wherein a first parameter of the parameter list represents a cutting point measurement device. The processor generates a first subsystem of the pipe network based, at least in part on, the first parameter.

Claims (38)

1. A computer program product, the computer program product comprising:

one or more computer-readable storage media and program instructions stored on the one or more computer-readable storage media, the program instructions comprising:

program instructions to retrieve a topology model of a pipe network;

program instructions to retrieve a measurement from a first boundary sensor of the pipe network;

program instructions to retrieve a measurement from a second boundary sensor of the pipe network;

in response to the measurements of the first and second boundary sensors matching flow amounts of a resource, program instructions to combine the first and second boundary sensors as a representation of a cutting point measurement device in the topology model of the pipe network;

program instructions to retrieve one or more measurement expressions of the pipe network;

program instructions to determine a parameter list for a first measurement expression, wherein a first parameter of the parameter list represents a cutting point measurement device;

program instructions to generate a first subsystem of the pipe network based, at least in part on, the first parameter; and

program instructions to generate a visual representation of a boundary of the first subsystem, based, at least in part, on a location of the cutting point measurement device.

2. The computer program product of claim 1 , wherein a second parameter of the parameter list represents an ending point measurement device.

3. The computer program product of claim 1 , the program instructions further comprising:

responsive to a determination that a change in the topology model of the pipe network impacts a second subsystem of the pipe network, program instructions to update a second measurement expression of the second subsystem, wherein the second measurement expression includes one or more parameters describing the second subsystem of the pipe network.

4. The computer program product of claim 3 , the program instructions further comprising:

program instructions to update the second measurement expression based, at least in part, on a change in direction to at least one flow measurement of the second subsystem of the pipe network.

5. The computer program product of claim 3 , the program instructions further comprising:

program instructions to update the first measurement expression and the second measurement expression based, at least in part, on the change in the topology model of the pipe network includes a new connection to the first subsystem and the second subsystem.

6. The computer program product of claim 5 , wherein a new parameter is added to the parameter list representing the new connection.

7. A computer system, the computer system comprising:

one or more computer processors;

one or more computer readable storage media; and

program instructions stored on the one or more computer readable storage media for execution by at least one of the one or more processors, the program instructions comprising:

program instructions to retrieve a topology model of a pipe network;

program instructions to retrieve a measurement from a first boundary sensor of the pipe network;

program instructions to retrieve a measurement from a second boundary sensor of the pipe network;

in response to the measurements of the first and second boundary sensors matching flow amounts of a resource, program instructions to combine the first and second boundary sensors as a representation of a cutting point measurement device in the topology model of the pipe network;

program instructions to retrieve one or more measurement expressions of the pipe network;

program instructions to determine a parameter list for a first measurement expression, wherein a first parameter of the parameter list represents a cutting point measurement device;

program instructions to generate a first subsystem of the pipe network based, at least in part on, the first parameter; and

program instructions to generate a visual representation of a boundary of the first subsystem, based, at least in part, on a location of the cutting point measurement device.

8. The computer system of claim 7 , wherein a second parameter of the parameter list represents an ending point measurement device.

9. The computer system of claim 7 , the program instructions further comprising:

responsive to a determination that a change in the topology model of the pipe network impacts a second subsystem of the pipe network, program instructions to update a second measurement expression of the second subsystem, wherein the second measurement expression includes one or more parameters describing the second subsystem of the pipe network.

10. The computer system of claim 9 , the program instructions further comprising:

program instructions to update the second measurement expression based, at least in part, on a change in direction to at least one flow measurement of the second subsystem of the pipe network.

11. The computer system of claim 9 , the program instructions further comprising:

program instructions to update the first measurement expression and the second measurement expression based, at least in part, on the change in the topology model of the pipe network includes a new connection to the first subsystem and the second subsystem.

12. The computer system of claim 11 , wherein a new parameter is added to the parameter list representing the new connection.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 30, 2015
From: HU, YONG DENG; LANE, EOIN; LV, XIAO; WANG, JIAN; ZHANG, KE
To: INTERNATIONAL BUSINESS MACHINES CORPORATION
Reel/Frame 035538/0336 →
Continuity (1)
Related Publication 20160321379A1 · Nov 3, 2016