IP Library Granted Patent US 9,551,495
Granted Patent B2
US 9,551,495 · App. 14/705,263 · Granted Jan 24, 2017

HVAC system grading systems and methods

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,551,495
App. No.
14/705,263
Granted
Jan 24, 2017
Kind
B2
Abstract

A first tracking module increments a first period of time when a heating, ventilation, or air conditioning (HVAC) system of a building is ON during a predetermined period of time. A second tracking module increments a second period of time when, during the predetermined period of time: (i) the HVAC system is ON and (ii) a split temperature of the HVAC system is outside of a temperature range of the HVAC system. A grade determination module determines a grade of the HVAC system for the predetermined period of time based on both the first period of time and the second period of time. A reporting module generates a displayable report for the HVAC system for the predetermined period of time. The report includes the grade of the HVAC system for the predetermined period of time.

Claims (64)

1. A grading system comprising:

a first tracking module that tracks a first period of time when a heating, ventilation, or air conditioning (HVAC) system of a building is ON during a first predetermined period of time;

a second tracking module that tracks a second period of time when, during the first predetermined period of time both of the following are satisfied concurrently:

(i) the HVAC system is ON; and

(ii) a split temperature of the HVAC system is outside of a temperature range of the HVAC system;

a learning module that, in response to a determination that the split temperature has increased by at least a predetermined amount within a second predetermined period of time after the HVAC system transitions from OFF to ON:

(i) determines an average split temperature based on an average of two or more of the split temperatures;

(ii) sets an upper temperature limit of the temperature range of the HVAC system based on the average split temperature plus a first predetermined temperature; and

(iii) sets a lower temperature limit of the temperature range of the HVAC system based on the average split temperature minus a second predetermined temperature;

a grade determination module that determines a grade of the HVAC system for the first predetermined period of time based on both the first period of time and the second period of time, wherein the grade determination module decreases the grade of the HVAC system for the first predetermined period as the second period of time increases; and

a reporting module that generates a displayable report for the HVAC system for the first predetermined period of time, the report including the grade of the HVAC system for the first predetermined period of time.

2. The grading system of claim 1 wherein the split temperature corresponds to a temperature difference between a supply air temperature of the HVAC system and a return air temperature of the HVAC system.

3. The grading system of claim 1 further comprising an enabling/disabling module that disables the first tracking module and the second tracking module for a delay period of the HVAC system after the HVAC system transitions from OFF to ON.

4. The grading system of claim 3 further comprising a learning module that sets the delay period of the HVAC system based on at least two split temperatures measured while the HVAC system is ON.

5. The grading system of claim 4 wherein the learning module sets the delay period of the HVAC system based on at least two split temperatures measured after the split temperature increases by at least a predetermined amount during a second predetermined period after the HVAC system transitions from OFF to ON.

6. The grading system of claim 1 wherein the grade determination module determines the grade of the HVAC system for the first predetermined period based on the second period of time divided by the first period of time.

7. The grading system of claim 1 wherein the grade determination module determines the grade of the HVAC system based on

100−(100*P2/P1),

where P 2 is the second period of time and P 1 is the first period of time.

8. A grading method comprising:

tracking a first period of time when a heating, ventilation, or air conditioning (HVAC) system of a building is ON during a predetermined period of time;

tracking a second period of time when, during the first predetermined period of time both of the following are satisfied concurrently: (i) the HVAC system is ON and (ii) a split temperature of the HVAC system is outside of a temperature range of the HVAC system;

in response to a determination that the split temperature has increased by at least a predetermined amount within a second predetermined period of time after the HVAC system transitions from OFF to ON:

(i) determining an average split temperature based on an average of two or more of the split temperatures;

(ii) setting an upper temperature limit of the temperature range of the HVAC system based on the average split temperature plus a first predetermined temperature; and

(iii) setting a lower temperature limit of the temperature range of the HVAC system based on the average split temperature minus a second predetermined temperature;

determining a grade of the HVAC system for the first predetermined period of time based on both the first period of time and the second period of time, wherein determining the grade of the HVAC system for the first predetermined period of time includes decreasing the grade of the HVAC system for the first predetermined period of time as the second period of time increases; and

generating a displayable report for the HVAC system for the first predetermined period of time, the report including the grade of the HVAC system for the first predetermined period of time.

9. The grading method of claim 8 wherein the split temperature corresponds to a temperature difference between a supply air temperature of the HVAC system and a return air temperature of the HVAC system.

10. The grading method of claim 8 further comprising preventing incrementing of the first and second periods for a delay period of the HVAC system after the HVAC system transitions from OFF to ON.

11. The grading method of claim 10 further comprising setting the delay period of the HVAC system based on at least two split temperatures measured while the HVAC system is ON.

12. The grading method of claim 11 further comprising setting the delay period of the HVAC system based on at least two split temperatures measured after the split temperature increases by at least a predetermined amount during a second predetermined period after the HVAC system transitions from OFF to ON.

13. The grading method of claim 8 further comprising determining the grade of the HVAC system for the first predetermined period based on the second period of time divided by the first period of time.

14. The grading method of claim 8 further comprising determining the grade of the HVAC system based on

100−(100*P2/P1),

where P 2 is the second period of time and P 1 is the first period of time.

15. A grading system comprising:

a first tracking module that tracks a first period of time when a heating, ventilation, or air conditioning (HVAC) system of a building is ON during a predetermined period of time;

a second tracking module that tracks a second period of time when, during the first predetermined period of time both of the following are satisfied concurrently:

(i) the HVAC system is ON; and

(ii) a split temperature of the HVAC system is outside of a temperature range of the HVAC system;

an enabling/disabling module that disables the first tracking module and the second tracking module for a delay period of the HVAC system after the HVAC system transitions from OFF to ON;

a learning module that, in response to a determination that the split temperature has increased by at least a predetermined amount within a second predetermined period of time after the HVAC system transitions from OFF to ON:

(i) determines an average split temperature based on an average of two or more of the split temperatures;

(ii) determines a threshold split temperature change based on a predetermined percent of the average split temperature; and

(iii) sets the delay period of the HVAC system as a function of the threshold split temperature change;

a grade determination module that determines a grade of the HVAC system for the first predetermined period of time based on both the first period of time and the second period of time, wherein the grade determination module decreases the grade of the HVAC system for the first predetermined period as the second period of time increases; and

a reporting module that generates a displayable report for the HVAC system for the first predetermined period of time, the report including the grade of the HVAC system for the first predetermined period of time.

16. The grading system of claim 15 wherein the learning module further:

(ii) sets an upper temperature limit of the temperature range of the HVAC system based on the average split temperature plus a first predetermined temperature; and

(iii) sets a lower temperature limit of the temperature range of the HVAC system based on the average split temperature minus a second predetermined temperature.

17. A grading method comprising:

tracking a first period of time when a heating, ventilation, or air conditioning (HVAC) system of a building is ON during a predetermined period of time;

tracking a second period of time when, during the first predetermined period of time both of the following are satisfied concurrently: (i) the HVAC system is ON and (ii) a split temperature of the HVAC system is outside of a temperature range of the HVAC system;

preventing incrementing of the first and second periods for a delay period of the HVAC system after the HVAC system transitions from OFF to ON;

in response to a determination that the split temperature has increased by at least a predetermined amount within a second predetermined period of time after the HVAC system transitions from OFF to ON:

(i) determining an average split temperature based on an average of two or more of the split temperatures;

(ii) determining a threshold split temperature change based on a predetermined percent of the average split temperature; and

(iii) setting the delay period of the HVAC system as a function of the threshold split temperature change;

determining a grade of the HVAC system for the first predetermined period of time based on both the first period of time and the second period of time, wherein determining the grade of the HVAC system for the first predetermined period of time includes decreasing the grade of the HVAC system for the first predetermined period of time as the second period of time increases; and

generating a displayable report for the HVAC system for the first predetermined period of time, the report including the grade of the HVAC system for the first predetermined period of time.

18. The grading method of claim 17 further comprising:

setting an upper temperature limit of the temperature range of the HVAC system based on the average split temperature plus a first predetermined temperature; and

setting a lower temperature limit of the temperature range of the HVAC system based on the average split temperature minus a second predetermined temperature.

Assignments (7)
SECURITY INTEREST Recorded Jul 9, 2024
From: COPELAND LP
To: U.S. BANK TRUST COMPANY, NATIONAL ASSOCIATION, AS NOTES COLLATERAL AGENT
Reel/Frame 068241/0264 →
SECURITY INTEREST Recorded Jul 17, 2023
From: COPELAND LP
To: ROYAL BANK OF CANADA, AS COLLATERAL AGENT
Reel/Frame 064278/0598 →
SECURITY INTEREST Recorded Jul 17, 2023
From: COPELAND LP
To: U.S. BANK TRUST COMPANY, NATIONAL ASSOCIATION, AS NOTES COLLATERAL AGENT
Reel/Frame 064279/0327 →
SECURITY INTEREST Recorded Jul 17, 2023
From: COPELAND LP
To: WELLS FARGO BANK, NATIONAL ASSOCIATION, AS COLLATERAL AGENT
Reel/Frame 064280/0695 →
INTELLECTUAL PROPERTY ASSIGNMENT AGREEMENT Recorded May 30, 2023
From: EMERSON ELECTRIC CO.
To: EMERSUB CXIII, INC.
Reel/Frame 063804/0643 →
INTELLECTUAL PROPERTY ASSIGNMENT AGREEMENT Recorded May 30, 2023
From: EMERSUB CXIII, INC.
To: COPELAND LP
Reel/Frame 063804/0583 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 28, 2015
From: ABIPROJO, PRIOTOMO
To: EMERSON ELECTRIC CO.
Reel/Frame 036903/0455 →