Method for low load operation of a power plant with a once-through boiler

Inventors: Volker Schüle (Leimen, DE); Stephan Hellweg (Oetigheim, DE); Reinhard Leithner (Braunschweig, DE); Niels Brinkmeier (Braunschweig, DE)
Assignee: GENERAL ELECTRIC TECHNOLOGY GMBH
F01K7/345F01K7/24F01K9/023F22B29/06F22B35/101F22D1/32
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,196,939
App. No.
14/807,216
Granted
Feb 5, 2019
Kind
B2
Abstract

The once-through boiler includes a water supply and at least an economizer, an evaporator superheater. No valves are provided between the economizer, the evaporator and the superheater. The high-pressure turbine includes a control valve. The method for low load operation of a power plant with a once-through boiler and a high pressure turbine includes providing a parameter indicative of the stable operation of the once-through boiler in once-through operation, and on the basis of this parameter adjusting the control valve in order to regulate the pressure within the economizer and evaporator and/or adjusting the temperature of the water supplied to the economizer.

Claims (14)

1. A method for low load operation of a power plant having a once-through boiler and at least one high pressure turbine, the once-through boiler having a water supply and an economizer, an evaporator and a superheater, the at least one high-pressure turbine comprising a control valve, the method comprising:

providing at least one parameter indicative of stable operation of the once-through boiler in once-through operation, the at least one parameter obtained from a temperature and/or pressure measurement system and/or from a software model; and

on the basis of the at least one parameter, (i) adjusting the control valve to regulate the pressure within the economizer and the evaporator and (ii) adjusting the temperature of the water supplied to the economizer,

wherein low load is defined by a number of critical load values, and a number of partially open positions of the control valve are provided, each position being associated with a respective one of the number of critical load values, and when the load falls below a given load value of the number of critical load values, the method comprises adjusting the control valve to the partially open position associated with said given load value.

2. The method according to claim 1 , wherein the step of adjusting the control valve comprises partially closing the control valve.

3. The method of claim 1 , wherein the power plant further has an extraction line for supplying a part of steam discharged from the high-pressure turbine to a preheater for heating water supplied to an economizer, and the step of adjusting the temperature of the water supplied to the economizer further comprises regulating the pressure within the extraction line.

4. The method of claim 3 , wherein the extraction line has a regulation valve, and wherein regulating the pressure within the extraction line comprises adjusting the regulation valve.

5. The method of claim 3 , wherein the extraction line is connected to a source of high pressure fluid and regulating the pressure within the extraction line comprises adjusting the source of high pressure fluid.

6. The method of claim 1 , wherein the at least one parameter comprises at least a temperature measured at the evaporator and/or economizer.

7. The method of claim 1 , wherein the at least one parameter comprises a measured temperature spread between different tubes and/or tube bundles and/or tube sections of the evaporator and/or economizer.

8. The method of claim 6 , wherein the at least one parameter comprises measuring a measured temperature or plurality of temperatures over at least a tube of the evaporator and/or economizer at different measurement points on the tube and/or different radiuses of the tube wall.

9. The method of claim 6 , wherein the at least one parameter comprises a measured temperature fluctuation and/or temperature deviation of at least a tube of the evaporator and/or economizer over time.

10. The method of claim 1 , wherein adjusting the temperature comprises increasing the water temperature supplied to the economizer.

11. The method of claim 1 , wherein the once-through boiler has no valves between the economizer, the evaporator and the superheater.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 3, 2025
From: GENERAL ELECTRIC TECHNOLOGY GMBH
To: GE VERNOVA INFRASTRUCTURE TECHNOLOGY LLC
Reel/Frame 071474/0317 →
CHANGE OF NAME Recorded Aug 17, 2016
From: ALSTOM TECHNOLOGY LTD
To: GENERAL ELECTRIC TECHNOLOGY GMBH
Reel/Frame 039714/0578 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 15, 2016
From: SCHÜLE, VOLKER; HELLWEG, STEPHAN; LEITHNER, REINHARD; BRINKMEIER, NIELS
To: ALSTOM TECHNOLOGY LTD
Reel/Frame 038919/0372 →
Priority Claims (1)
EP 14179002 · Jul 29, 2014 · regional
Continuity (1)
Related Publication 20160032784A1 · Feb 4, 2016