IP Library Granted Patent US 10,000,222
Granted Patent B2
US 10,000,222 · App. 14/825,595 · Granted Jun 19, 2018

Methods and systems of determining end of train location and clearance of trackside points of interest

Inventors: Richard A. Allshouse (Manassas, VA); Charles W. Morris (Nokesville, VA); Joseph E. Sanfilippo (Chadds Ford, PA)
Assignee: Lockheed Martin Corporation
B61L25/025B61L1/14B61L3/125B61L15/0054B61L15/0072
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,000,222
App. No.
14/825,595
Granted
Jun 19, 2018
Kind
B2
Abstract

Methods and systems that utilize radio frequency identification (RFID) tags mounted at trackside points of interest (POI) together with an RFID tag reader mounted on an end of train (EOT) car. The RFID tag reader and the RFID tags work together to provide information that can be used in a number of ways including, but not limited to, determining train integrity, determining a geographical location of the EOT car, and determine that the EOT car has cleared the trackside POI along the track.

Claims (17)

1. A method comprising:

using a radio frequency identification tag reader mounted on an end of train car of a train to read data from a radio frequency identification tag mounted at a trackside point of interest as the end of train car passes the trackside point of interest;

wirelessly transmitting data that is read from the radio frequency identification tag to a head of train car of the train;

receiving the transmitted data at the head of train car;

determining the location of the end of train car at the head of train car based on the received data;

using a radio frequency identification tag reader mounted on the head of train car to read data from the radio frequency identification tag mounted at the trackside point of interest as the head of train car passes the trackside point of interest; and

determining if the radio frequency identification tag reader on the end of train car reads data from the radio frequency identification tag mounted at the trackside point of interest at an expected time based on when the radio frequency identification tag reader mounted on the head of train car reads data from the radio frequency identification tag mounted at the trackside point of interest.

2. The method of claim 1 , wherein determining the location of the end of train car comprises determining that the end of train car has passed the trackside point of interest.

3. The method of claim 1 , wherein determining the location of the end of train car comprises determining a geographical location of the end of train car.

4. The method of claim 1 , wherein the data read from the radio frequency identification tag by the radio frequency identification tag reader on the end of train car comprises at least one of geographical coordinates of the trackside point of interest and a unique identifier for the trackside point of interest.

5. The method of claim 4 , wherein the data read from the radio frequency identification tag by the radio frequency identification tag reader on the end of train car comprises the geographical coordinates of the trackside point of interest and the unique identifier for the trackside point of interest.

6. The method of claim 4 , wherein the data transmitted to the head of train car comprises at least one of the geographical coordinates of the trackside point of interest and the unique identifier for the trackside point of interest.

7. The method of claim 6 , wherein the data transmitted to the head of train car comprises the geographical coordinates of the trackside point of interest and the unique identifier for the trackside point of interest.

8. The method of claim 1 , wherein determining the location of the end of train car comprises comparing the received data to expected data.

9. The method claim 1 , comprising using the determined location of the end of train car to make a vital train protection decision.

10. The method of claim 9 , wherein the vital train protection decision comprises making a release authority protection decision.

11. The method of claim 9 , wherein a failure of the radio frequency identification tag reader on the end of train car to read data from the radio frequency identification tag or to read data from the radio frequency identification tag at an expected time is treated in a fail-safe manner where an assumption is made that the end of train car has separated from the train.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 1, 2023
From: LOCKHEED MARTIN CORPORATION
To: AUSTRALIAN RAIL TRACK CORPORATION LIMITED
Reel/Frame 062841/0282 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 13, 2015
From: ALLSHOUSE, RICHARD A.; MORRIS, CHARLES W.; SANFILIPPO, JOSEPH E.
To: LOCKHEED MARTIN CORPORATION
Reel/Frame 036321/0189 →
Continuity (1)
Related Publication 20170043797A1 · Feb 16, 2017
Cited By (1)
US 12,479,469