Wind turbine tower with an elevator system

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,682,846
App. No.
14/851,567
Granted
Jun 20, 2017
Kind
B2
Abstract

A wind turbine tower with an elevator system and a method to install the elevator system is provided. The tower for a wind turbine comprises includes an elevator system including guide wires. The guide wires are connected to a guide wire fixture arrangement. The tower includes a platform that is arranged in the area of the lower end of the tower. The platform comprises an opening to allow the guide wires to pass through the opening. The platform includes a connection means, to detachably connect the guide wire fixture arrangement to the platform during transportation and installation of the tower. The platform includes a hoist system to lower the guide wire fixture arrangement through the opening in the platform into a space below the tower to extend the guide wires through the opening in the platform.

Claims (26)

1. A tower for a wind turbine, comprising:

an elevator system, the elevator system including a plurality of guide wires to guide an elevator cabin, the plurality of guide wires being connected to a guide wire fixture arrangement, wherein the elevator cabin includes an elevator frame, the guide wire fixture arrangement being connected to the elevator frame;

a platform that is arranged perpendicular to a longitudinal axis of the tower in an area of a lower end of the tower, the platform including an opening that is prepared and arranged in a way to allow the plurality of guide wires to pass through the opening, wherein the platform comprises a connection mechanism to detachably connect the guide wire fixture arrangement to the platform during transportation and installation of the tower; and

a hoist system operably connected to the platform, the hoist system configured to lower an elevator frame and the guide wire fixture arrangement through the opening in the platform into a space below the tower to extend the plurality of guide wires through the opening in the platform;

wherein, when the guide wire fixture arrangement is raised by the hoist system and connected to the platform, the plurality of guide wires lose tension.

2. The tower according to claim 1 , wherein the elevator frame is connected to the guide wire fixture arrangement.

3. The tower according to claim 1 , wherein a protection railing is arranged at least partially around the opening in the platform.

4. The tower according to claim 1 , wherein the guide wire fixture arrangement comprises a plurality of attachment points that are prepared and arranged in a way to be used with the connection means to attach the guide wire fixture arrangement to a second platform to tension the plurality of guide wires.

5. A method of installing the wind turbine tower of claim 1 on a foundation at an installation, the method comprising the steps of:

preparing the wind turbine tower for transportation to the foundation;

transporting the wind turbine tower to the foundation;

connecting the wind turbine tower to the foundation;

disconnecting the guide wire fixture arrangement from the platform of the tower; and

lowering the guide wire fixture arrangement through the opening in the platform.

6. The method according to claim 5 , wherein preparing includes:

temporarily connecting the tower onto a support arrangement; and

connecting the guide wire fixture arrangement to the support arrangement.

7. The method according to claim 5 , wherein preparing includes f:

adjusting a length of the plurality of guide wires to achieve a certain predetermined tension of the plurality of guide wires.

8. The method according to claim 5 , wherein preparing includes: testing and approving the elevator system of the wind turbine tower.

9. The method according claim 5 , wherein transporting includes:

disconnecting the guide wired fixture arrangement from the support arrangement;

hoisting the guide wire fixture arrangement up to the tower by the hoist system; and

attaching the guide wire fixture arrangement to the tower.

10. The method according to claim 5 , comprising the additional steps of:

connecting the guide wired fixture arrangement to the foundation.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 3, 2019
From: SIEMENS AKTIENGESELLSCHAFT
To: SIEMENS GAMESA RENEWABLE ENERGY A/S
Reel/Frame 048003/0631 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 17, 2015
From: SIEMENS WIND POWER A/S
To: SIEMENS AKTIENGESELLSCHAFT
Reel/Frame 037056/0113 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 16, 2015
From: MATHIASEN, SOEREN OESTERGAARD
To: SIEMENS WIND POWER A/S
Reel/Frame 037044/0479 →