IP Library Granted Patent US 10,067,264
Granted Patent B2
US 10,067,264 · App. 14/895,960 · Granted Sep 4, 2018

Method of constraining seismic inversion

Inventors: Thomas David Blanchard (Aberdeen, GB); Pierre Daniel Thore (Aberdeen, GB)
Assignee: Total S.A.
G01V99/005G01V1/306G01V1/308G06F17/18G01V2210/614G01V2210/6122G01V2210/6169G01V2210/6242
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,067,264
App. No.
14/895,960
Granted
Sep 4, 2018
Kind
B2
Abstract

Disclosed is a method a seismic inversion for petrophysical properties of a subsurface volume comprising the steps of: obtaining petrophysical data relating to valid geological and/or dynamical scenarios, converting this data into valid combinations of elastic parameters; projecting the valid combinations of elastic parameters onto a spherical plot; and determining a penalty term from the distances between each cell of the spherical plot and the nearest valid combination of elastic parameters within the subsurface volume. Valid geological and/or dynamical scenarios comprise those which are petrophysically possible. The penalty term is then used to constrain an inversion minimizing a cost function associated with seismic mismatch between two or more seismic surveys.

Claims (29)

1. A method of performing a geometric inversion of seismic data comprising the steps of:

obtaining petrophysical data relating to valid geological and/or dynamical scenarios within a subsurface volume comprising a hydrocarbon reservoir or region thereof, wherein valid geological and/or dynamical scenarios comprise those which are petrophysically possible;

converting said petrophysical data into valid combinations of elastic parameters;

projecting said valid combinations of elastic parameters onto a spherical plot;

determining a penalty term from the distances between each cell of the spherical plot and the nearest valid combination of elastic parameters;

performing an inversion which inverts for changes in dynamic properties of the hydrocarbon reservoir by minimizing a cost function associated with seismic mismatch between two or more seismic surveys and at least a synthetic dataset computed from said elastic parameters; wherein said penalty term is used to constrain said inversion; and

using the result of said inversion in predicting performance of said hydrocarbon reservoir.

2. A method as claimed in claim 1 wherein the projection of said valid combinations of elastic parameters onto a spherical plot comprises projection onto the surface of a plotted sphere, and the determined distance between each cell of the spherical plot and the nearest valid combination of elastic parameters is the great circle distance.

3. A method as claimed in claim 1 wherein, when the inversion is a 3D inversion, one of the surveys is the synthetic dataset computed from the inverted parameters.

4. A method as claimed in claim 1 comprising determining the penalty term for only a region of said subsurface volume, wherein said valid geological and/or dynamical scenarios and therefore said valid combinations of elastic parameters are those which are valid for that particular region.

5. A method as claimed in claim 4 comprising determining different penalty terms for different regions within the subsurface volume.

6. A method as claimed in claim 4 wherein each region comprises a different layer of the subsurface volume.

7. A method as claimed in claim 4 comprising the step of using knowledge of the predominant fluid effect in a region in determining valid geological and/or dynamical scenarios for that region.

8. A method as claimed in claim 1 comprising the step of using a simulation to determine said valid geological and/or dynamical scenarios within the subsurface volume.

9. A method as claimed in claim 8 wherein said simulation is a MonteCarlo simulation.

10. A method as claimed in claim 1 comprising the step of using a rock physics/petro-elastic model to convert said petrophysical data into valid combinations of elastic parameters.

11. A method as claimed in claim 1 comprising the step of determining valid combinations of elastic parameters directly from observation.

12. A method as claimed in claim 1 wherein said method comprises 4D modelling of said subsurface volume and the spherical plot is a plot of changes over time in any three elastic parameters, one on each axis.

13. A method as claimed in claim 1 wherein said method comprises 3D modelling of said subsurface volume and the spherical plot is a plot of any three elastic parameters, with one elastic parameter on each axis.

14. A method as claimed in claim 13 comprising determining an origin of the spherical plot of elastic values wherein said determination comprises:

grouping said petrophysical data according to their facies or seismic-facies characteristics;

calculating average values for the elastic parameters being plotted, from the values of each of these parameters for each group of facies characteristic; and

locating said origin at the point defined by said calculated average values for each parameter.

15. A method as claimed in claim 12 wherein said elastic parameters comprise any three of: p-wave velocity or impedance, s-wave velocity or impedance, density and any Lamé parameter.

16. A method as claimed in claim 1 further comprising the step of using the results of said method to aid hydrocarbon recovery from a reservoir.

17. A computer program comprising computer readable instructions which, when run on suitable computer apparatus, cause the computer apparatus to perform the method of claim 1 .

18. A computer program carrier comprising the computer program of claim 17 .

19. Apparatus specifically adapted to carry out the steps of the method as claimed in claim 1 .

20. A method as claimed claim 1 comprising using the result of said inversion in determining future well placement.

Assignments (3)
CORRECTIVE ASSIGNMENT TO CORRECT THE NAME OF THE ASSIGNEE PREVIOUSLY RECORDED AT REEL: 67096 FRAME: 87. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Jun 26, 2024
From: TOTALENERGIES SE (PREVIOUSLY TOTAL SA THEN TOTAL SE)
To: TOTALENERGIES ONETECH
Reel/Frame 068051/0530 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 12, 2024
From: TOTALENERGIES SE (PREVIOUSLY TOTAL SA THEN TOTAL SE)
To: TOTALENERGIES ONETECH (PREVIOUSLY TOTALENERGIES ONE TECH)
Reel/Frame 067096/0087 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 11, 2016
From: BLANCHARD, THOMAS DAVID; THORE, PIERRE DANIEL
To: TOTAL S.A.
Reel/Frame 037712/0847 →
Priority Claims (1)
GB 1309913.0 · Jun 4, 2013 · national
Continuity (1)
Related Publication 20160116637A1 · Apr 28, 2016