IP Library Granted Patent US 9,780,628
Granted Patent B2
US 9,780,628 · App. 14/908,007 · Granted Oct 3, 2017

Generator inspection method

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,780,628
App. No.
14/908,007
Granted
Oct 3, 2017
Kind
B2
Abstract

In the present invention, the following are carried out: a shaft disconnecting step of disconnecting rotary machines that are respectively connected to both ends of a shaft of a generator; a gap forming step of forming a gap in a vertical direction between the generator and an installation stand; a pathway installing step of inserting into the gap a portion of a movement pathway member extending in a lateral direction which includes a horizontal direction component and a radial direction component of the shaft; a moving step of moving the generator in the lateral direction on the movement pathway member; and an inspecting step of inspecting the generator having undergone the moving step.

Claims (33)

1. A generator inspection method of inspecting a generator in which rotary machines are respectively connected to both ends of a shaft, the method comprising:

a shaft disconnecting step of disconnecting the rotary machines respectively connected to the ends of the shaft;

a gap forming step of forming a gap, in a vertical direction, between an installation stand of the generator and the generator;

a pathway installing step of inserting into the gap a portion of a movement pathway member extending in a lateral direction, the lateral direction including a horizontal direction component and a radial direction component of the shaft;

a moving step of moving the generator in the lateral direction on the movement pathway member; and

an inspecting step of inspecting the generator having undergone the moving step.

2. The generator inspection method according to claim 1 , wherein

following the gap forming step and before the moving step, a roller arranging step is carried out to arrange a roller, which rolls in the lateral direction, between the movement pathway member and the generator.

3. The generator inspection method according to claim 2 , wherein

in the roller arranging step, a roller carriage is arranged, the roller carriage being provided with at least one roller and a base which has a placement portion, on which an object is placed, above the at least one roller and which rotatably supports the at least one roller.

4. The generator inspection method according to claim 2 , wherein

the movement pathway member has a roller guide member that regulates a movement of the roller in a horizontal direction perpendicular to the lateral direction.

5. The generator inspection method according claim 2 , wherein

in the moving step, a rolling of the roller is restricted after moving the generator to an intended position in the lateral direction.

6. The generator inspection method according to claim 1 , wherein

in the gap forming step, the generator is lifted upward using a jack, and a gap is formed in the vertical direction between the installation stand of the generator and the generator.

7. The generator inspection method according to claim 1 , wherein

a structure that supports the movement pathway member is installed in advance at a position in the lateral direction of the generator, and

in the pathway installing step, the portion of the movement pathway member is inserted into the gap and then the movement pathway member is placed on the installation stand and the structure.

8. The generator inspection method according to claim 7 , wherein

the structure has a floor board and a support structure that supports the floor board from below, and

a portion of the floor board is cut out along a section on which the movement pathway member is placed above the support structure.

9. The generator inspection method according to claim 8 , wherein

the structure has a lid board that closes the cutout section of the floor board.

10. The generator inspection method according to claim 1 , wherein

in the inspecting step, the shaft is pulled out, in an axial direction, from a casing that covers the shaft.

11. The generator inspection method according to claim 1 , wherein,

after the inspecting step, the following steps are carried out:

a return moving step of returning the generator to an original position thereof above the installation stand in the horizontal direction by moving the generator in the lateral direction on the movement pathway member;

a gap forming step of forming a gap in the vertical direction between the movement pathway member and the generator;

a pathway removing step of removing the movement pathway member;

a placing step of placing the generator on the installation stand; and

a shaft connecting step of connecting the rotary machines respectively to the ends of the shaft.

Assignments (3)
CORRECTIVE ASSIGNMENT TO CORRECT THE REMOVING PATENT APPLICATION NUMBER 11921683 PREVIOUSLY RECORDED AT REEL: 054975 FRAME: 0438. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded May 26, 2023
From: MITSUBISHI HITACHI POWER SYSTEMS, LTD.
To: MITSUBISHI POWER, LTD.
Reel/Frame 063787/0867 →
CHANGE OF NAME Recorded Jan 13, 2021
From: MITSUBISHI HITACHI POWER SYSTEMS, LTD.
To: MITSUBISHI POWER, LTD.
Reel/Frame 054975/0438 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 27, 2016
From: MURATA, YUICHI
To: MITSUBISHI HITACHI POWER SYSTEMS, LTD.
Reel/Frame 037600/0331 →