IP Library Granted Patent US 9,564,945
Granted Patent B1
US 9,564,945 · App. 14/941,192 · Granted Feb 7, 2017

Method and apparatus to determine electric power network anomalies using a coordinated information exchange among smart meters

Inventors: Aanchal Goyal (Yorktown Heights, NY); Aleksandr Aravkin (Yorktown Heights, NY); Younghun Kim (Yorktown Heights, NY); Tarun Kumar (Yorktown Heights, NY)
Assignee: INTERNATIONAL BUSINESS MACHINES CORPORATION
H04B3/462H04B1/7073H04B3/542
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,564,945
App. No.
14/941,192
Granted
Feb 7, 2017
Kind
B1
Abstract

A system and method to produce an electric network from estimated line impedance and physical line length among smart meter devices is provided using communication between the smart meters. The smart meters: (1) synchronize time using GPS pps signals, which provide an accurate time stamp; (2) send/receive an identifiable signal through the same phase of electric networks; (3) identify other smart meters on the same phase lines by listening to the information signal on the same phase lines; and (4) calculate time-of-arrival of an identifiable signal from other smart meters. The time of arrival information is used to calculate the line length, which is then used to calculate impedance of a line and topology of the electric network. The system then constructs an electric network by combining geo-spatial information and tree-like usual connection information.

Claims (19)

1. A system for obtaining and assessing an electric power network of low voltage distribution grids, the system comprising:

a plurality of smart meters, each smart meter coupleable to the electric power network and configured to exchange information among smart meters of the electric power network by:

measuring by the smart meters the time-of-travel through the power lines using global positioning satellite (GPS) pulse per second (pps) signals to synchronize time to achieve nano second level synchronization accuracy, and

measuring signal distortion.

2. The system of claim 1 , wherein signal distortion includes total harmonic distortion, frequency distortion, and phase distortion.

3. The system of claim 1 , wherein measured time-of-travel is used to calculate impedance of connecting power lines by multiplying unit impedance.

4. The system of claim 1 , wherein the measured time-of-travel and derived matrices therefrom are used to detect anomalies that include time-of-arrival asymmetry, outliers, and temporal characteristic changes.

5. The system of claim 1 , wherein abnormal operating conditions are detected by comparing a current measurement matrix with an identified normal operating measurement matrix.

6. The system of claim 5 , wherein localization of the abnormal operating conditions is detected by checking the location in the current measurement matrix by mapping row and column of the current measurement matrix to a connection between two smart meters.

7. A smart meter for obtaining and assessing an electric power network of low voltage distribution grids, the smart meter comprising:

a modem coupleable to the electric power network and configured to exchange information among smart meters of the electric power network using a transmitter, receiver and global positioning system (GPS) module of the modem;

a microcontroller coupled to the modem and configured to control the modem to exchange information among smart meters of the electric power network by:

measuring by the time-of-travel through the power lines using GPS pulse per second (pps) signals to synchronize time to achieve nano second level synchronization accuracy, and

measuring signal distortion.

8. The smart meter of claim 7 , wherein signal distortion includes total harmonic distortion, frequency distortion, and phase distortion.

9. The smart meter of claim 7 , wherein measured time-of-travel is used to calculate impedance of connecting power lines by multiplying unit impedance.

10. The smart meter of claim 7 , wherein the measured time-of-travel and derived matrices therefrom are used to detect anomalies that include time-of-arrival asymmetry, outliers, and temporal characteristic changes.

11. The smart meter of claim 7 , wherein abnormal operating conditions are detected by comparing a current measurement matrix with an identified normal operating measurement matrix.

12. The system of claim 11 , wherein localization of the abnormal operating conditions is detected by checking the location in the current measurement matrix by mapping row and column of the current measurement matrix to a connection between two smart meters.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 6, 2017
From: INTERNATIONAL BUSINESS MACHINES CORPORATION
To: UTOPUS INSIGHTS, INC.
Reel/Frame 042700/0530 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 13, 2015
From: GOYAL, AANCHAL; ARAVKIN, ALEKSANDR; KIM, YOUNGHUN; KUMAR, TARUN
To: INTERNATIONAL BUSINESS MACHINES CORPORATION
Reel/Frame 037038/0814 →