IP Library Granted Patent US 10,097,009
Granted Patent B2
US 10,097,009 · App. 14/983,004 · Granted Oct 9, 2018

Method and systems for managing power systems

Inventors: Patrick Hammel Hart (Ballston Lake, NY); Ralph Teichmann (Niskayuna, NY); John Guido Piccirillo (Glenville, NY); Honggang Wang (Shanghai, CN); Rebecca Dinan Zoracki (Ballston Spa, NY)
Assignee: GENERAL ELECTRIC COMPANY
H02J4/00G05B19/102H02J3/38G05B2219/2639H02J2003/007Y02E60/76Y04S40/22
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,097,009
App. No.
14/983,004
Granted
Oct 9, 2018
Kind
B2
Abstract

A power system includes a first power asset include a first power source and a first power controller. The first power controller includes a first filter configured to receive an error amount at a first frequency range and a second power controller includes a second filter configured to receive the error amount at a second frequency range. The first power controller is configured to instruct the first power source to produce a first amount of power, adjust the first amount of power based on the error amount received by the first filter until the error amount received is substantially zero. When the error amount received is substantially zero, the first power controller is configured to determine a first desired operating amount of power based on the first power source, and adjust the first amount of power based on the first desired operating amount of power.

Claims (37)

1. A power system comprising:

a first power asset comprising a first power source and a first power controller, wherein said first power controller is configured to instruct said first power source to produce a first amount of power, wherein said first power controller comprises a first filter configured to receive an error amount at a first frequency range; and

a second power asset comprising a second power source and a second power controller, wherein said second power controller is configured to instruct said second power source to produce a second amount of power, wherein said second power controller comprises a second filter configured to receive the error amount at a second frequency range, wherein the error amount is based on a difference between a power demand amount and a sum of the first amount of power and the second amount of power, and wherein said first power controller is configured to:

instruct said first power source to produce the first amount of power;

adjust the first amount of power based on the error amount received by said first filter until the error amount received is substantially zero; and

when the error amount received is substantially zero:

determine a first desired operating amount of power based on said first power source; and

adjust the first amount of power based on the first desired operating amount of power, wherein said first power controller is configured to adjust the first amount of power based on the first desired operating amount of power to adjust the error amount at the second frequency range.

2. The power system in accordance with claim 1 , wherein said second power controller is configured to:

instruct said second power source to produce the second amount of power;

adjust the second amount of power based on the error amount received by said second filter until the error amount received is substantially zero; and

when the error amount received is substantially zero:

determine a second desired operating amount of power based on said second power source; and

adjust the second amount of power based on the second desired operating amount of power.

3. The power system in accordance with claim 1 , wherein the first frequency range and the second frequency range do not overlap.

4. The power system in accordance with claim 1 further comprising a third power asset comprising a third, power source and a third power controller configured to instruct said third power source to produce a third amount of power wherein said first power controller comprises a third filter configured to receive an error amount at a third frequency range, and wherein the error amount is based on the sum of the first amount of power, the second amount of power, and the third amount of power.

5. The power system in accordance with claim 1 , wherein said first power source is at least one of a battery, a gas engine, a coal fired turbine, a fuel cell, a nuclear generator, a wind turbine, solar cells, a hydroelectric generator, and a geothermal tap.

6. The power system in accordance with claim 1 , wherein the first desired operating amount of power is based on at least one of one or more operating parameters of said first power source and one or more business rules.

7. The power system in accordance with claim 1 , wherein said first power controller is further configured to adjust the first amount of power at a rate based on one or more operating parameters of said first power source.

8. The power system in accordance with claim 1 , wherein a frequency associated with the error amount is based on a rate of change of the error amount over time.

9. The power system in accordance with claim 1 further comprising a plurality of power assets which produce a plurality of amounts of power and wherein the error amount is based on the difference between the demand amount and a total of the plurality of amounts of power.

10. The power system in accordance with claim 1 , wherein at least one of said first power asset and said second power asset is a solid oxide fuel cell.

11. A first power asset comprising:

a power source; and

a power controller comprising a filter configured to receive an error amount at a first frequency range, wherein the error amount is based on a difference between a power demand amount and a total power produced amount including power produced by the first power asset and a second power asset, wherein said power controller is configured to:

instruct the power source to produce an amount of power;

adjust the amount of power based on the error amount received by said filter until the error amount received is substantially zero; and

when the error amount received is substantially zero:

determine a desired operating amount of power based on said power source; and

adjust the amount of power based on the desired operating amount of power, wherein said power controller is configured to adjust the error amount of power based on the desired operating amount of power to adjust the error amount at a second frequency range.

12. The first power asset in accordance with claim 11 , wherein the first frequency range and the second frequency range do not overlap.

13. The first power asset in accordance with claim 11 , wherein the power source is at least one of a battery, a gas engine, a coal fired turbine, a fuel cell, a nuclear generator, a wind turbine, solar cells, a hydroelectric generator, and a geothermal tap.

14. The first power asset in accordance with claim 11 , wherein the desired operating amount of power is based on at least one of one or more operating parameters of the power source and one or more business rules.

15. The first power asset in accordance with claim 11 , wherein said power controller is further configured to adjust the amount of power at a rate based on one or more operating parameters of said first power source.

16. The first power asset in accordance with claim 11 , wherein said power controller is further configured to decrease the first amount of power at a rate based on one or more operating parameters of said first power source.

17. The first power asset in accordance with claim 11 , wherein a frequency associated with the error amount is based on a rate of change of the error amount over time.

18. The first power asset in accordance with claim 11 , wherein said second power asset is a solid oxide fuel cell.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 4, 2025
From: CUMMINS ENTERPRISE LLC
To: GE VERNOVA INFRASTRUCTURE TECHNOLOGY LLC
Reel/Frame 071849/0550 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 28, 2023
From: GENERAL ELECTRIC COMPANY
To: CUMMINS ENTERPRISE LLC
Reel/Frame 063486/0408 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 29, 2015
From: HART, PATRICK HAMMEL; TEICHMANN, RALPH; PICCIRILLO, JOHN GUIDO; WANG, HONGGANG; ZORACKI, REBECCA DINAN
To: GENERAL ELECTRIC COMPANY
Reel/Frame 037378/0348 →
Continuity (1)
Related Publication 20170187194A1 · Jun 29, 2017