IP Library Granted Patent US 9,661,682
Granted Patent B2
US 9,661,682 · App. 15/000,264 · Granted May 23, 2017

Methods for multi-point carrier aggregation configuration and data forwarding

Inventors: Pei-Kai Liao (Nantou County, TW); Yih-Shen Chen (Hsinchu, TW)
Assignee: MEDIATEK INC.
H04W76/046H04L1/1812H04L5/001H04L5/0035H04L5/0053H04L5/0094H04W16/32H04W24/04H04W36/08H04W72/042H04W72/0406H04W72/0413H04W72/0426H04W72/1289H04W88/02H04W88/08
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,661,682
App. No.
15/000,264
Granted
May 23, 2017
Kind
B2
Abstract

Methods of multi-point carrier aggregation configuration and data forwarding are disclosed. In one embodiment of the invention, a primary connection is established between a UE and a primary base station in a primary cell with a first UE-ID. A second connection is configured between the UE and a second base station in a secondary cell with a second UE-ID. Component carriers from the primary and the second connections are configured and aggregated. Mobility management functions are performed on the primary connection. In another embodiment of the current invention, a first UE data is received from a primary connection with a UE connecting to a first base station, a second UE data is received from a second base station. The first UE data and the second UE data are combined. A third UE data from a network entity is distributed to the first and the second base station.

Claims (50)

1. A method, comprising:

establishing a primary connection in a primary cell belonging to a primary base station with a first UE-ID, wherein the primary cell comprises a downlink component carrier (CC) and an uplink CC;

establishing a second connection in a secondary cell belonging to a second base station with a second UE-ID, and wherein the secondary cell comprises a downlink CC and an uplink CC;

aggregating component carriers based on the first UE-ID and the second UE-ID;

receiving a configuration that configures the uplink CC of the secondary cell as a feedback channel for the downlink CC of the second connection;

performing a radio link monitoring (RLM) function on the second connection; and

suspending uplink transmissions of the second connection when a radio link failure (RLF) of the second connection occurs.

2. The method of claim 1 , wherein the second connection is configured through the primary connection.

3. The method of claim 1 , wherein control signaling messages of Radio Resource Control (RRC) are configured to be carried on the primary connection and the second connection.

4. The method of claim 1 , wherein control signaling messages of Resource Control (RRC) are configured to be carried on the primary connection only.

5. The UE of claim 1 , wherein the UE receives a first UE data from the primary base station and a second UE data from the second base station, the UE further comprises:

a decoder that reassembles a data stream by decoding a generated bit stream that is generated by soft combining the first UE data and the second UE data.

6. A method, comprising:

establishing a primary connection in a primary cell belonging to a primary base station with a first UE-ID, wherein the primary cell comprises a downlink component carrier (CC);

establishing a second connection in a secondary cell belonging to a second base station with a second UE-ID, wherein the secondary cell comprises a downlink CC, wherein the second UE-ID is derived from a Random Access Channel (RACH) response message from the second base station;

aggregating component carriers based on the first UE-ID and the second UE-ID; and

performing mobility management functions through the primary connection.

7. The method of claim 6 , further comprising:

receiving a first UE data from the primary base station and a second UE data from the second base station;

generating a bit stream by soft combining the first UE data and the second UE data; and

reassembling a data stream by decoding the generated bit stream.

8. A user equipment (UE), comprising:

memory that contains a set of program instructions;

a radio frequency (RF) transceiver that transmits and receives radio signals; and

a processor that executes the set of program instructions in accordance with the radio signals and thereby controls the UE to perform the steps of:

establishing a primary connection in a primary cell belonging to a primary base station with a first UE-ID, wherein the primary cell comprises a downlink component carrier (CC) and an uplink CC, wherein a second connection is established in a secondary cell belonging to a second base station with a second UE-ID, and wherein the secondary cell comprises a downlink CC and an uplink CC;

aggregating component carriers based on the first UE-ID and the second UE-ID;

receiving a configuration that configures the uplink CC of the secondary cell as a feedback channel for the downlink CC of the second connection;

performing a radio link monitoring (RLM) function on the second connection; and

suspending uplink transmissions of the second connection when a radio link failure of the second connection occurs.

9. The UE of claim 8 , wherein the second connection is configured through the primary connection.

10. The UE of claim 8 , wherein control signaling messages of Radio Resource Control (RRC) are configured to be carried on the primary connection and the second connection.

11. The UE of claim 8 , wherein control signaling messages of Resource Control (RRC) are configured to be carried on the primary connection only.

12. The method of claim 6 , further comprising:

receiving a first UE data from the primary base station and a second UE data from the second base station;

decoding the first UE data and the second UE data independently; and

reassembling a data stream by combining the decoded first UE data and second UE data.

13. The UE of claim 8 , wherein the UE receives a first UE data from the primary base station and a second UE data from the second base station, the UE further comprises:

a decoder that decodes the first UE data and the second UE data independently, wherein the UE reassembles a data stream by combining the decoded first UE data and second UE data.

14. The method of claim 6 , wherein the second connection is configured through the primary connection.

15. The method of claim 6 , wherein control signaling messages of Radio Resource Control (RRC) are configured to be carried on the primary connection and the second connection.

16. The method of claim 6 , wherein control signaling messages of Radio Resource Control (RRC) are configured to be carried on the primary connection only.

17. The method of claim 6 , further comprising:

receiving a first UE data from the primary base station and a second UE data from the second base station;

decoding the first UE data and the second UE data independently; and

reassembling a data stream by combining the decoded first UE data and second UE data.

18. The method of claim 6 , further comprising:

receiving a first UE data from the primary base station and a second UE data from the second base station;

generating a bit stream by soft combining the first UE data and the second UE data; and

reassembling a data stream by decoding the generated bit stream.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 13, 2018
From: MEDIATEK INC.
To: HFI INNOVATION INC.
Reel/Frame 047068/0617 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 19, 2016
From: LIAO, PEI-KAI; CHEN, YIH-SHEN
To: MEDIATEK INC.
Reel/Frame 037562/0456 →
Continuity (3)
Continuation 13848987 · Mar 22, 2013
Provisional Application 61615062 · Mar 23, 2012
Related Publication 20160143084A1 · May 19, 2016