IP Library Granted Patent US 10,365,638
Granted Patent B2
US 10,365,638 · App. 15/003,948 · Granted Jul 30, 2019

Scheduling process for automated mattress manufacturing

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,365,638
App. No.
15/003,948
Granted
Jul 30, 2019
Kind
B2
Abstract

Disclosed herein methods for scheduling the automated manufacturing of mattresses. Aspects include receiving a plurality of customer orders for mattresses, wherein each of the plurality of customer orders includes a due date and organizing the plurality of customer orders into production batches based on the due dates. Aspects also include analyzing a first production batch of the daily production schedule and responsively creating an optimized hour production batch and based on a determination that the optimized first production batch exceeds a performance threshold 1 , dispatching the first hourly production batch to an automated manufacturing system for production. Based on a determination that the optimized first hour production batch does not exceed the performance threshold, aspects further include analyzing a second production batch and modifying the optimized first production batch and the second production batch to create an optimized second production batch.

Claims (22)

1. A computer-implemented method for scheduling automated manufacturing of mattresses, the method comprising:

receiving, by a processing device, a plurality of customer orders for mattresses, wherein each of the plurality of customer orders includes a due date;

organizing the plurality of customer orders into production batches based on the due dates;

analyzing a first production batch of the daily production schedule and responsively creating an optimized hour production batch;

based on a determination that the optimized first production batch exceeds a performance threshold, operating an automated manufacturing system to produce the first hourly production batch;

based on a determination that the optimized first hour production batch does not exceed the performance threshold:

analyzing a second production batch; and

modifying the optimized first production batch and the second production batch to create an optimized second production batch.

2. The method of claim 1 further comprising:

based on a determination the optimized first production batch as modified exceeds a second performance threshold, operating the automated manufacturing system to produce the optimized first production batch.

3. The method of claim 2 , further comprising:

based on a determination the optimized first production batch does not exceed the second performance threshold:

analyzing a third production batch;

modifying the optimized first production batch and the third production batch to create an optimized third production batch.

4. The method of claim 3 , further comprising:

based on a determination the first optimized production batch exceeds a third performance threshold, dispatching the optimized first production batch to the automated manufacturing system for production.

5. The method of claim 1 , wherein modifying the optimized first production batch comprises exchanging at least one production order between the optimized first production batch and the second production batch.

6. The method of claim 3 , wherein modifying the optimized first production batch with the second production batch and the third production batch comprises exchanging at least one production order between the optimized first production batch, the optimized second production batch and the third production batch.

7. The method of claim 4 , wherein the second performance threshold is less than the performance threshold.

8. The method of claim 7 , wherein the third performance threshold is less than the second performance threshold.

9. The method of claim 1 , where the determination that the optimized first production batch exceeds the performance threshold is based on an analysis of an expected downtime of a quilt assembly of the automated manufacturing system.

10. The method of claim 1 , where the determination that the optimized first production batch exceeds the performance threshold is based on an expected utilization rate of a quilt assembly of the automated manufacturing system.

Assignments (16)
SECURITY INTEREST Recorded Aug 2, 2024
From: WELLS FARGO BANK, NATIONAL ASSOCIATION; NATIONAL BEDDING COMPANY, L.L.C.; SERTA SIMMONS BEDDING, LLC; SSB MANUFACTURING COMPANY; TOMORROW SLEEP LLC; TUFT & NEEDLE, LLC; DREAMWELL, LTD.
To: ECLIPSE BUSINESS CAPITAL LLC, AS ADMINISTRATIVE AGENT
Reel/Frame 068325/0886 →
TERM LOAN INTELLECTUAL PROPERTY SECURITY AGREEMENT Recorded May 10, 2024
From: DREAMWELL, LTD.; NATIONAL BEDDING COMPANY, L.L.C.; SERTA SIMMONS BEDDING, LLC; SSB MANUFACTURING COMPANY; TOMORROW SLEEP LLC; TUFT & NEEDLE, LLC
To: WILMINGTON SAVINGS FUND SOCIETY, FSB
Reel/Frame 067379/0782 →
SECURITY AGREEMENT Recorded Jul 3, 2023
From: DREAMWELL, LTD.; TUFT & NEEDLE, LLC; SERTA SIMMONS BEDDING, LLC; NATIONAL BEDDING COMPANY, L.L.C.; TOMORROW SLEEP LLC
To: WELLS FARGO BANK, NATIONAL ASSOCIATION
Reel/Frame 064193/0668 →
RELEASE OF FIRST LIEN SECURITY INTEREST IN INTELLECTUAL PROPERTY Recorded Jun 30, 2023
From: UBS AG, STAMFORD BRANCH, AS ADMINISTRATIVE AGENT
To: DREAMWELL, LTD.; SSB MANUFACTURING COMPANY; NATIONAL BEDDING COMPANY, L.L.C.
Reel/Frame 064185/0293 →
RELEASE OF SUPER-PRIORITY SECURITY INTEREST IN INTELLECTUAL PROPERTY Recorded Jun 30, 2023
From: WILMINGTON SAVINGS FUND SOCIETY, FSB, AS ADMINISTRATIVE AGENT
To: DREAMWELL, LTD.; SSB MANUFACTURING COMPANY; NATIONAL BEDDING COMPANY, L.L.C.; SERTA SIMMONS BEDDING, LLC; TUFT & NEEDLE, LLC; TOMORROW SLEEP LLC
Reel/Frame 064185/0479 →
RELEASE OF FIRST LIEN SECURITY INTEREST IN INTELLECTUAL PROPERTY Recorded Jun 30, 2023
From: ECLIPSE BUSINESS CAPITAL LLC, AS ADMINISTRATIVE AGENT
To: DREAMWELL, LTD.; SSB MANUFACTURING COMPANY; NATIONAL BEDDING COMPANY L.L.C.; SERTA SIMMONS BEDDING, LLC; TUFT & NEEDLE, LLC; TOMORROW SLEEP LLC
Reel/Frame 064185/0236 →
TERM LOAN INTELLECTUAL PROPERTY SECURITY AGREEMENT Recorded Jun 30, 2023
From: DREAMWELL, LTD.; TUFT & NEEDLE, LLC; SERTA SIMMONS BEDDING, LLC; NATIONAL BEDDING COMPANY, L.L.C.; TOMORROW SLEEP LLC; SSB MANUFACTURING COMPANY
To: WILMINGTON SAVINGS FUND SOCIETY, FSB, AS ADMINISTRATIVE AGENT
Reel/Frame 064185/0583 →
NOTICE OF AGENCY RESIGNATION AND ASSIGNMENT OF SUPER-PRIORITY TERM LOAN INTELLECTUAL PROPERTY SECURITY AGREEMENT Recorded Feb 6, 2023
From: UBS AG, STAMFORD BRANCH, AS THE RESIGNING ADMINISTRATIVE AGENT
To: WILMINGTON SAVINGS FUND SOCIETY, FSB, AS SUCCESSOR ADMINISTRATIVE AGENT
Reel/Frame 063272/0391 →
SECURITY INTEREST Recorded Jan 31, 2023
From: DREAMWELL, LTD.; SSB MANUFACTURING; NATIONAL BEDDING; SERTA SIMMONS BEDDING, LLC; TUFT & NEEDLE, LLC; TOMORROW SLEEP LLC
To: ECLIPSE BUSINESS CAPITAL LLC
Reel/Frame 062571/0391 →
SECURITY INTEREST Recorded Jan 27, 2023
From: DREAMWELL, LTD.; SSB MANUFACTURING; NATIONAL BEDDING; SERTA SIMMONS BEDDING, LLC; TUFT & NEEDLE, LLC; TOMORROW SLEEP LLC
To: ECLIPSE BUSINESS CAPITAL LLC
Reel/Frame 062525/0458 →
RELEASE OF SECOND LIEN SECURITY INTEREST IN INTELLECTUAL PROPERTY RECORDED AT R/F 040813/1075 Recorded May 10, 2022
From: GOLDMAN SACHS BANK USA, AS ADMINISTRATIVE AGENT
To: DREAMWELL, LTD.
Reel/Frame 059925/0322 →
SUPER-PRIORITY TERM LOAN INTELLECTUAL PROPERTY SECURITY AGREEMENT Recorded Jun 24, 2020
From: DREAMWELL, LTD.
To: UBS AG, STAMFORD BRANCH, AS ADMINISTRATIVE AGENT
Reel/Frame 053022/0029 →
SECOND LIEN TERM LOAN INTELLECTUAL PROPERTY SECURITY AGREEMENT Recorded Dec 5, 2016
From: DREAMWELL, LTD.
To: GOLDMAN SACHS BANK USA, AS ADMINISTRATIVE AGENT
Reel/Frame 040813/0175 →
ABL INTELLECTUAL PROPERTY SECURITY AGREEMENT Recorded Dec 5, 2016
From: DREAMWELL, LTD.
To: UBS AG, STAMFORD BRANCH, AS ADMINISTRATIVE AGENT
Reel/Frame 040813/0213 →
FIRST LIEN TERM LOAN INTELLECTUAL PROPERTY SECURITY AGREEMENT Recorded Dec 5, 2016
From: DREAMWELL, LTD.
To: UBS AG, STAMFORD BRANCH, AS ADMINISTRATIVE AGENT
Reel/Frame 040813/0136 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 18, 2016
From: JAN, FRANCIS G.
To: DREAMWELL, LTD.
Reel/Frame 037762/0739 →
Cited By (1)
US 12,314,869