IP Library Granted Patent US 9,924,431
Granted Patent B2
US 9,924,431 · App. 15/018,278 · Granted Mar 20, 2018

Seamless relocation of a mobile terminal in a wireless network

Inventors: David Aaron Claassen (Leesburg, VA); Lei Wang (Oak Hill, VA)
Assignee: SMARTSKY NETWORKS LLC
H04W36/14H04W36/0016
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,924,431
App. No.
15/018,278
Granted
Mar 20, 2018
Kind
B2
Abstract

A method for performing seamless relocation of a mobile terminal in a wireless network includes selecting a first serving gateway (SGW) among a plurality of SGWs and a first packet data network gateway (PGW) among a plurality of PGWs, wherein the first SGW connects to the first PGW to setup the first S5 session, establishing a first communication channel between the terminal and the first PGW and assigning an internet protocol (IP) address to the terminal, selecting a second SGW among the plurality of SGWs when the terminal is about to move out of an area being served by the first SGW, connecting the second SGW to the second PGW to setup a new S5 session when a second PGW among the plurality of PGWs is closer to the second SGW than the first PGW or connecting the second SGW to the first PGW to modify the first S5 session when no PGW is closer to the second SGW than the first PGW, establishing a second communication channel between the terminal and the second SGW using the IP address allocated to the terminal, reconfiguring routing for terminal IP destination, and terminating the first communication channel between the terminal and the first PGW.

Claims (42)

1. A method for performing a seamless relocation of a terminal in a wireless environment comprises:

selecting a first serving gateway (SGW) among a plurality of SGWs and a first packet data network gateway (PGW) among a plurality of PGWs, wherein the first SGW connects to the first PGW to setup a first session;

establishing a first communication channel between the terminal and the first PGW and assigning an internet protocol (IP) address to the terminal;

when the terminal is about to move out of an area being served by the first SGW, selecting a second SGW among the plurality of SGWs;

when a second PGW among the plurality of PGWs is closer to the second SGW than the first PGW, connecting the second SGW to the second PGW to setup a new session and when no PGW is closer to the second SGW than the first PGW, connecting the second SGW to the first PGW to modify the first session;

establishing a second communication channel between the terminal and the second PGW and maintaining the IP address assigned to the terminal previously;

reconfiguring routing for the IP address assigned to the terminal previously through the second PGW; and

terminating the first communication channel between the terminal and the first PGW.

2. The method of claim 1 , wherein a mobility management entity (MME) selects the first SGW and the second SGW among the plurality of SGWs and selects the first PGW and the second PGW among the plurality of PGWs.

3. The method of claim 2 , wherein the MME includes a new method to signal the second SGW to create a (GPRS Tunneling Protocol (GTP) tunnel between the second SGW and the second PGW with the IP address assigned to the terminal previously as PDN address allocation.

4. The method of claim 3 , wherein the MME includes a MME agent that communicates with a Software Defined Network (SDN) controller.

5. The method of claim 3 , wherein the MME notifies the SDN controller of a PGW relocation event when the terminal moves out of the area being served by the first PGW and establishes a communication channel with the second PGW.

6. The method of claim 3 , further comprising:

dynamically configuring routing of content to the IP address assigned to the terminal previously through the first PGW, when the first communication channel is established; and

reconfiguring routing of content to the IP address assigned to the terminal previously through the second PGW when the second communication channel is established.

7. The method of claim 1 , further comprising:

migrating a default bearer attached to the first communication channel when the first communication channel is established between the terminal and the first PGW to a default default bearer of the second communication channel when the second communication channel is established between the terminal and the second PGW.

8. The method of claim 1 , wherein the first session is an S5 session.

9. The method of claim 1 , further comprising:

migrating a dedicated bearer attached to the first communication channel between the terminal and the first PGW to the second communication channel between the terminal and the second PGW when an additional service is required to satisfy a quality of service (QoS) requirement.

10. An apparatus for performing a hand-over of a terminal in a wireless environment, the apparatus comprising processing circuitry:

wherein the processing circuitry is configured to:

select a first serving gateway (SGW) among a plurality of SGWs and a first packet data network gateway (PGW) among a plurality of PGWs, wherein the first SGW connects to the first PGW to setup a first session;

request the terminal to establish a first communication channel between the terminal and the first PGW and assigning an internet protocol (IP) address to the terminal;

when the terminal is about to move out of an area being served by the first SGW, select a second SGW among the plurality of SGWs;

when a second PGW among the plurality of PGWs is closer to the second SGW than the first PGW, request the second SGW to connect to the second PGW to setup a new session and when no PGW is closer to the second SGW than the first PGW, request the second SGW to connect to the first PGW to modify the first session;

request the terminal to establish a second communication channel between the terminal and the second PGW using the IP address assigned to the terminal previously;

request the terminal to reconfigure routing for content to the IP address assigned to the terminal previously through the second PGW; and

request the terminal to terminate the first communication channel between the terminal and the first PGW.

11. The apparatus of claim 10 , wherein a mobility management entity (MME) selects the first SGW and the second SGW among the plurality of SGWs and selects the first PGW and the second PGW among the plurality of PGWs.

12. The apparatus of claim 11 , wherein the mobility management entity (MME) includes a new method to signal the second SGW to create a (GPRS Tunneling Protocol (GTP) tunnel between the second SGW and the second PGW with the IP address assigned to the terminal previously as PDN address allocation.

13. The apparatus of claim 11 , wherein the MME includes a MME agent that communicates with a Software Defined Network (SDN) controller.

14. The apparatus of claim 11 , wherein the MME notifies the SDN controller of a PGW relocation event when the terminal moves out of the area being served by the first PGW and establishes a communication channel with the second PGW.

15. The apparatus of claim 10 , wherein the processing circuitry is further configured to:

dynamically configure routing of content to the IP address assigned to the terminal previously through the first PGW, when the first communication channel is established; and

reconfiguring routing of content to the IP address assigned to the terminal previously through the second PGW when the second communication channel is established.

16. The apparatus of claim 10 , wherein the processing circuitry is further configured to:

migrate a default bearer attached to the first communication channel when the first communication channel is established between the terminal and the first PGW to a default bearer of the second communication channel when the second communication channel is established between the terminal and the second PGW.

17. The apparatus of claim 10 , wherein the first session is an S5 session.

18. The apparatus of claim 10 , wherein the processing circuitry is further configured to migrate a dedicated bearer attached to the first communication channel between the terminal and the first PGW to the second communication channel between the terminal and the second PGW when an additional service is required to satisfy a quality of service (QoS) requirement.

19. The method of claim 1 , wherein the terminal comprises an airborne terminal and wherein the wireless environment comprises an air to ground network.

20. The apparatus of claim 10 , wherein the terminal comprises an airborne terminal and wherein the wireless environment comprises an air to ground network.

Assignments (2)
SECURITY INTEREST Recorded Feb 4, 2019
From: SMARTSKY NETWORKS, LLC
To: WILMINGTON SAVINGS FUND SOCIETY, FSB, AS AGENT
Reel/Frame 048232/0545 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 11, 2016
From: CLAASSEN, DAVID AARON; WANG, LEI
To: SMARTSKY NETWORKS, LLC
Reel/Frame 037709/0792 →
Continuity (1)
Related Publication 20170230877A1 · Aug 10, 2017