IP Library Granted Patent US 9,982,569
Granted Patent B2
US 9,982,569 · App. 15/023,029 · Granted May 29, 2018

Method for operating a steam turbine plant

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,982,569
App. No.
15/023,029
Granted
May 29, 2018
Kind
B2
Abstract

A method for operating a steam turbine plant including a steam turbine and a steam generator allows a power reserve to be provided whilst simultaneously maintaining a high level of efficiency in the normal mode of operation. The steam turbine plant includes a heat reservoir which is associated with the steam turbine, from which the steam is removed and is fed to the steam turbine. The steam is fed to the steam turbine when the steam generator is not in operation.

Claims (23)

1. A method for operating a steam turbine plant with a steam turbine and a steam generator, the steam turbine plant comprising a heat store associated with the steam turbine, the method comprising:

removing steam from the heat store and feeding to the steam turbine,

wherein the steam is fed to the steam turbine whilst the steam generator is idle, and

loading the heat store with saturated water from a steam drum of the steam generator whilst a power demand on the steam turbine plant from a power grid is below a preset threshold value.

2. The method as claimed in claim 1 ,

wherein the heat store is loaded with superheated steam from the steam generator or the steam turbine.

3. The method as claimed in claim 2 ,

wherein the heat store is loaded via a heat exchanger.

4. The method as claimed in claim 1 ,

wherein the steam turbine plant comprises a high-pressure part, a medium-pressure part, and a low-pressure part, and

wherein the heat store is loaded from the high-pressure part of the steam generator, and the steam is fed to the medium-pressure part of the steam turbine.

5. The method as claimed in claim 1 ,

wherein the steam turbine plant comprises a high-pressure part, a medium-pressure part, and a low-pressure part, and

wherein the heat store is loaded from the medium-pressure part of the steam generator, and the steam is fed to the low-pressure part of the steam turbine.

6. A steam turbine plant comprising:

a steam turbine,

a steam generator,

a heat store associated with the steam turbine from which steam is removed and fed to the steam turbine, wherein the heat store is adapted such that the steam is fed to the steam turbine whilst the steam generator is idle, and the heat store is loaded with saturated water from a steam drum of the steam generator whilst a power demand on the steam turbine plant from a power grid is below a preset threshold value.

7. The steam turbine plant as claimed in claim 6 ,

wherein the heat store is designed as a Ruths steam accumulator.

8. A gas-and-steam turbine plant comprising:

a steam turbine plant as claimed in claim 6 .

9. The method as claimed in claim 1 , further comprising feeding the steam from the heat store to the steam generator whilst the steam generator is idle.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 21, 2021
From: SIEMENS AKTIENGESELLSCHAFT
To: SIEMENS ENERGY GLOBAL GMBH & CO. KG
Reel/Frame 055997/0014 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 18, 2016
From: LENK, UWE; TREMEL, ALEXANDER
To: SIEMENS AKTIENGESELLSCHAFT
Reel/Frame 038026/0178 →