IP Library Granted Patent US 9,957,683
Granted Patent B2
US 9,957,683 · App. 15/038,995 · Granted May 1, 2018

Sheet piling

Inventor: Robin Dawson (Buckinghamshire, GB)
Assignee: DAWSON CONSTRUCTION PLANT LIMITED
E02D5/20E02D5/04E02D5/08E02D5/28
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,957,683
App. No.
15/038,995
Granted
May 1, 2018
Kind
B2
Abstract

A method of forming a sheet pile wall comprising cold reforming a Z-shape pile or a U-shape pile and connecting a plurality of reformed steel piles so as to form a sheet pile wall having at least one engagement section, the engagement section when viewed in a cross section being a recess that has a narrowed neck portion.

Claims (24)

1. A method of forming a sheet pile wall, comprising:

taking a plurality of Z-shape piles or U-shape piles, the Z-shape pile comprising two flanges and a web with an angle between the web and each of the flanges of the Z-shape pile being greater than 90° and the U-shape pile comprising two webs and a flange with an angle between each of the webs and the flange of the U-shape pile being greater than 90°;

cold reforming the Z-shape piles to decrease the angle between the web and flanges of the Z-shape pile to less than 90° or cold reforming the U-shape piles to the decrease the angle between the webs and the flange to less than 90° thereby forming reformed steel piles; and

connecting a plurality of the reformed steel piles so as to form the sheet pile wall having at least one engagement section, the engagement section when viewed in a cross section being a recess that has a narrowed neck portion.

2. The method of claim 1 , wherein the Z-shape or U-shape pile is reformed to decrease the angle to less than 80° but greater than 30°.

3. The method of claim 1 , wherein the engagement section is an anchorage point for connection of additional materials or components, in particular the engagement section has a dove-tail shape.

4. The method of claim 1 , further comprising engaging one of a rubber insert, a preformed concrete facing panel and cap, a steel cage or in-situ cast concrete with the engagement section of the sheet pile wall.

5. The method of claim 1 , wherein at least two sheet pile walls are arranged as a composite wall.

6. The method of claim 5 , wherein the two sheet pile walls of the composite wall have a gap therebetween, the gap being filled with concrete.

7. The method of claim 1 , wherein connecting a plurality of reformed steel piles comprises driving a reformed pile into a surface such that it joins to an adjacent pile via an interlock mechanism.

8. The method of claim 7 further comprising excavating material located within the engagement sections of the wall after driving the pile into the surface.

9. The method of claim 1 , wherein the Z-shape pile or the U-shape pile is formed by hot rolling a steel section.

10. A method of forming a sheet pile wall, comprising:

taking a plurality of Z-shape piles or U-shape piles, the Z-shape pile comprising two flanges, each flange having a first end and a second end, and a web having a first end and a second end and the U-shape pile comprising two webs, each web having a first end and a second end, and a flange having a first end and a second end;

cold reforming the Z-shape piles such that at least a portion of the web extends away from a linear vector extending from the first end to the second end of the web or cold reforming the U-shape piles such that at least a portion of the flange extends away from a linear vector extending from the first end to the second end of the flange thereby forming reformed steel piles; and

connecting a plurality of the reformed steel piles so as to form the sheet pile wall having at least one engagement section, the engagement section when viewed in a cross section being a recess that has a narrowed neck portion.

11. The method of claim 10 , wherein the Z-shape or U-shape pile is reformed to decrease the angle to less than 80° but greater than 30°.

12. The method of claim 10 , wherein the engagement section is an anchorage point for connection of additional materials or components, in particular the engagement section has a dove-tail shape.

13. The method of claim 10 , further comprising engaging one of a rubber insert, a preformed concrete facing panel and cap, a steel cage or in-situ cast concrete with the engagement section of the sheet pile wall.

14. The method of claim 10 , wherein at least two sheet pile walls are arranged as a composite wall.

15. The method of claim 14 , wherein the two sheet pile walls of the composite wall have a gap therebetween, the gap being filled with concrete.

16. The method of claim 10 , wherein connecting a plurality of reformed steel piles comprises driving a reformed pile into a surface such that it joins to an adjacent pile via an interlock mechanism.

17. The method of claim 16 , further comprising excavating material located within the engagement sections of the wall after driving the pile into the surface.

18. The method of claim 10 , wherein the Z-shape pile or the U-shape pile is formed by hot rolling a steel section.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 18, 2016
From: DAWSON, ROBIN
To: DAWSON CONSTRUCTION PLANT LIMITED
Reel/Frame 039181/0797 →
Priority Claims (1)
GB 1320760.0 · Nov 25, 2013 · national
Continuity (1)
Related Publication 20170002536A1 · Jan 5, 2017