IP Library Granted Patent US 10,240,626
Granted Patent B2
US 10,240,626 · App. 15/111,278 · Granted Mar 26, 2019

Method for producing a securing arrangement and securing arrangement

Inventors: Roland Mair (Gotzis, AT); Marco Zach (Diepoldsau, CH)
Assignee: SFS intec Holding AG
F16B25/0021F16B5/0241F16B25/0063F16B25/106Y10T29/49963
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,240,626
App. No.
15/111,278
Granted
Mar 26, 2019
Kind
B2
Abstract

A method of producing fastening assembly ( 10 ) including a series of layers ( 12, 14, 16 ) and a screw ( 18 ), the screw ( 18 ) having a screw head ( 20 ), a shaft ( 24 ), a thread ( 26 ) extending into a displacement tip ( 22 ) and an unthreaded shaft portion ( 28 ). The method includes screwing the screw ( 18 ) into the series of layers ( 12, 14, 16 ), the layer ( 14 ) in the series of layers ( 12, 14, 16 ) that is furthest from the screw head ( 20 ) being deformed in the screw-in direction, so that a thickness D p of the series of layers ( 12, 14, 16 ) is increased in a region around the screw ( 18 ), and continuing to screw in the screw ( 18 ) until the screw head ( 20 ) strikes the series of layers, a maximum thickness D p, max of the series of layers being reached at this moment and the length L F of the unthreaded shaft portion ( 28 ) being up to 10% less than and up to 30% greater than the maximum thickness D p, max of the series of layers.

Claims (18)

1. A method for producing a fastening assembly ( 10 ) comprising a series of solid layers ( 12 , 14 , 16 ) that are in contact with one another and a screw ( 18 ), the screw ( 18 ) comprising a screw head ( 20 ) equipped with a driving point, a shaft ( 24 ) extending into a displacement tip ( 22 ), a thread ( 26 ) extending into the displacement tip and an unthreaded shaft portion ( 28 ) arranged between the thread ( 26 ) and the screw head ( 20 ), the method comprising the following steps:

screwing the screw ( 18 ) into the series of solid layers ( 12 , 14 , 16 ), at least one of the layers ( 14 ) in the series of layers ( 12 , 14 , 16 ) that is furthest from the screw head ( 20 ) being deformed in a screw-in direction, so that a thickness D p of the series of solid layers ( 12 , 14 , 16 ) is increased in a region directly around the screw ( 18 ) due to the deformation,

continuing to screw in the screw ( 18 ) until the screw head ( 20 ) contacts and is supported on a flat surface of a first of the series of solid layers, a maximum thickness D p, max of the series of solid layers being reached at this moment and a length L F of the unthreaded shaft portion ( 28 ) is up to 10% less than or up to 30% greater than the maximum thickness D p, max of the series of solid layers.

2. The method according to claim 1 , wherein the length L F of the unthreaded shaft portion ( 28 ) is up to 5% less than or up to 20% greater than the maximum thickness D p, max of the series of solid layers.

3. The method according to claim 1 , wherein the length L F of the unthreaded shaft portion ( 28 ) is up to 3% less than or up to 10% greater than the maximum thickness D p, max of the series of solid layers.

4. The method according to claim 1 , wherein the length L F of the unthreaded shaft portion ( 28 ) is equal to the maximum thickness D p, max of the series of solid layers, so that the screw stops being screwed in when the screw head ( 20 ) strikes the series of solid layers.

5. The method according to claim 1 , wherein the length L F of the unthreaded shaft portion ( 28 ) is less than the maximum thickness D p, max of the series of solid layers, and by continuing to turn the screw, the thickness of the series of solid layers is reduced to a final thickness D p, end of the series of solid layers, the length L F of the unthreaded shaft portion ( 28 ) being equal to the final thickness D p, end of the series of solid layers.

6. The method according to claim 1 , wherein at least part of the unthreaded shaft portion ( 28 ) has a diameter which is greater than a core diameter of the thread ( 26 ) and less than an outer diameter of the thread.

7. The method according to claim 1 , wherein at least part of the unthreaded shaft portion ( 28 ) has a diameter which is less than or equal to a core diameter of the thread ( 26 ).

8. The method according to claim 1 , wherein the unthreaded shaft portion ( 28 ) has, adjacent to the screw head, a shoulder ( 32 ) having a shaft diameter that is greater than a core diameter of the thread.

9. The method according to claim 1 , wherein the thread ( 26 ) comprises, adjacent to the unthreaded shaft portion ( 28 ), a plurality of support points for the series of layers ( 12 , 14 , 16 ) which are an equal distance from the screw head ( 20 ), the support points delimiting the unthreaded shaft portion ( 28 ).

10. The method according to claim 9 , wherein the plurality of support points are formed by the thread ( 26 ) extending into a planar, radially extending plane adjacent to the unthreaded shaft portion ( 28 ).

11. The method according to claim 9 , wherein the plurality of support points are formed via a double thread or multiple threads.

12. The method according to claim 1 , wherein the unthreaded shaft portion directly adjoins the tip.

13. The method according to claim 1 , further comprising using a screw having a thread diameter of greater than 5.8 mm.

14. The method according to claim 1 , further comprising using a screw having a thread diameter of greater than 6.5 mm.

15. The method according to claim 1 , wherein the layer ( 14 ) that is furthest from the screw head ( 20 ) has a maximum thickness of 1 mm.

16. A fastening assembly ( 10 ), produced in accordance with a method according to claim 1 .

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 25, 2022
From: SFS INTEC HOLDING AG
To: SFS GROUP INTERNATIONAL AG
Reel/Frame 061328/0559 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 13, 2016
From: MAIR, ROLAND; ZACH, MARCO
To: SFS INTEC HOLDING AG
Reel/Frame 039147/0402 →
Priority Claims (1)
DE 10 2014 000 894 · Jan 23, 2014 · national
Continuity (1)
Related Publication 20160341236A1 · Nov 24, 2016
Cited By (2)
US 12,529,437 US 12,553,551