IP Library Patent Application 15112902
Patent Application
App. No. 15/112,902

METHOD FOR OPERATING A GAS TURBINE AT PART LOAD

Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US None
App. No.
15/112,902
Abstract

The invention refers to a method for controlling part load operation of a gas turbine comprising a controller wherein a load set point of the controller is greater or equal a minimum load set point. The minimum load set point depends on a hot gas temperature that is calculated based on a hot gas temperature model.

Claims (26)

1 . A method for controlling part load operation of a gas turbine comprising a controller wherein a load set point of the controller is greater or equal a minimum load set point and wherein the minimum load set point depends on a hot gas temperature that is calculated based on a hot gas temperature model.

2 . Method according to claim 1 , wherein from the hot gas temperature a minimum hot gas temperature is subtracted and the difference between the hot gas temperature and the minimum hot gas temperature serves as an input to a controller, which switches off at least one burner and/or adjusts fuel staging parameter when the difference becomes negative and which switches on at least one burner and/or readjusts a fuel staging parameter when the difference exceeds a threshold value.

3 . Method according to claim 1 , wherein from the hot gas temperature a minimum hot gas temperature is subtracted and the difference between the hot gas temperature and the minimum hot gas temperature serves as an input to a controller, which determines a delta load based on the difference between the hot gas temperature and the minimum hot gas temperature.

4 . Method according to claim 1 , wherein a first target load is generated based on the actual power AP 0 [MW] of the gas turbine at the moment the claimed method is activated.

5 . Method according to claim 4 , wherein the minimum load set point is equal to the sum of the first target load and the delta load.

6 . Method according to claim 4 , wherein the first target load is equal to the actual power of the gas turbine minus an offset.

7 . Method according to claim 1 , wherein the hot gas temperature model depends from at least one of the following inputs:

n: rotor speed

Tamb: ambient temperature

pamb: ambient pressure

hamb: ambient humidity

VIGV: variable inlet guide vane position

m r : air split ratio

m f : fuel mass flow

WI: fuel Wobbe index

LHV: fuel low heating value

b s : burner fuel stage ratio

γ: cooling air leakage degradation rate.

8 . Method according to claim 1 , wherein the minimum hot gas temperature is adapted by comparing the CO emissions of the exhaust gas of the gas turbine with the maximum allowable CO emissions.

9 . Method according to claim 8 , wherein the minimum hot gas temperature is raised if the CO emissions are higher than the maximum allowable CO emissions.

10 . Method according to claim 8 , wherein the minimum hot gas temperature is lowered if the CO emissions are lower than the maximum allowable CO emissions.

11 . Method according to claim 1 , wherein the method is activated once a predefined activation criteria is reached.

12 . Method according to claim 11 , wherein the predefined activation criteria comprises comparing the actual hot gas temperature THG with a predefined minimum hot gas temperature.

13 . Controller of a gas turbine, operating according to claim 1 .

14 . Gas turbine comprising a controller, wherein the controller operates according to claim 1 .

15 . Gas turbine according to claim 14 , comprising at least one combustor, at least one compressor and at least one turbine.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 16, 2017
From: GENERAL ELECTRIC TECHNOLOGY GMBH
To: ANSALDO ENERGIA IP UK LIMITED
Reel/Frame 041731/0626 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 10, 2016
From: ZHANG, MENGBIN; THERKORN, DIRK; BERNERO, STEFANO; KENYON, MICHAEL
To: GENERAL ELECTRIC TECHNOLOGY GMBH
Reel/Frame 039978/0358 →