IP Library Granted Patent US 10,202,050
Granted Patent B2
US 10,202,050 · App. 15/120,501 · Granted Feb 12, 2019

Power rail-support unit and guide-track transportation system

Inventors: Akihiro Kubo (Tokyo, JP); Kosaku Murase (Tokyo, JP); Eisuke Okano (Tokyo, JP)
Assignee: MITSUBISHI HEAVY INDUSTRIES ENGINEERING, LTD.
B60M1/307B60L5/39
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,202,050
App. No.
15/120,501
Granted
Feb 12, 2019
Kind
B2
Abstract

A power rail-support unit includes: a base portion that is integrally fixed on a track; a guide rail on which a guide wheel of a side portion of a vehicle travelling on the track abuts; a first fixing portion that is configured to fix the guide rail on the base portion; a second fixing portion that is connected to the guide rail so as to be independent of the first fixing portion; a bracket that is supported on the guide rail; and a power rail that is supported by the bracket so as to be arranged at a predetermined relative position relative to the guide rail, and that slides on and makes contact with a collector of the vehicle.

Claims (28)

1. A power rail-support unit, comprising:

a base portion that is integrally fixed on a track;

a guide rail on which a guide wheel of a side portion of a vehicle travelling on the track abuts;

a first fixing portion that is configured to fix the guide rail on the base portion;

a second fixing portion that is connected to the guide rail so as to be independent of the first fixing portion;

a bracket that is supported on the guide rail; and

a power rail that is supported by the bracket so as to be arranged at a predetermined relative position relative to the guide rail, and that slides on and makes contact with a collector of the vehicle,

wherein the guide rail includes:

a first flange that is fixed on the base portion by the first fixing portion;

a second flange that is disposed so as to face the first flange and on which the guide wheel is in contact; and

a connecting portion that connects the first flange and the second flange between the first flange and the second flange, and

wherein the bracket includes:

a fixed portion that is fixed to the connecting portion by the second fixing portion,

an extending portion that extends in a direction away from the connecting portion and extends obliquely from a portion of the second flange side of the fixed portion toward a portion of the first flange side of the fixed portion.

2. The power rail-support unit according to claim 1 , wherein

the predetermined relative position is determined based on the positional relationship between the guide wheel of lime vehicle and the power rail.

3. The power rail-support unit according to claim 1 , wherein

the bracket has a cable support portion that supports a cable.

4. The power rail-support unit according to claim 1 , wherein

the bracket and an insulator are integrally formed of an insulating member, and

the power rail is fixed and supported by the guide rail with the insulating member being interposed therebetween.

5. The power rail-support unit according to claim 1 , wherein

the second fixing portion is configured to be capable of adjusting a fixing portion of the bracket relative to the guide rail so as to be capable of finely adjusting a fixing portion of the power rail from the relative position.

6. The power rail-support unit according to claim 1 , wherein

a spacer is provided that is configured to finely adjust a fixing portion of the power rail from the relative position by being interposed between the guide rail and the bracket.

7. A guide-track transportation system, comprising:

the power rail-support unit according to claim 1 ; and

a vehicle.

Assignments (4)
CHANGE OF NAME Recorded Dec 14, 2023
From: MITSUBISHI HEAVY INDUSTRIES ENGINEERING, LTD.
To: MHI ENGINEERING, LTD.
Reel/Frame 066014/0774 →
NUNC PRO TUNC ASSIGNMENT Recorded Dec 14, 2023
From: MHI ENGINEERING, LTD.
To: MITSUBISHI HEAVY INDUSTRIES, LTD.
Reel/Frame 066014/0870 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 30, 2018
From: MITSUBISHI HEAVY INDUSTRIES, LTD.
To: MITSUBISHI HEAVY INDUSTRIES ENGINEERING, LTD.
Reel/Frame 046499/0613 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 19, 2016
From: KUBO, AKIHIRO; MURASE, KOSAKU; OKANO, EISUKE
To: MITSUBISHI HEAVY INDUSTRIES, LTD.
Reel/Frame 039491/0354 →
Priority Claims (1)
JP 2014-038150 · Feb 28, 2014 · national
Continuity (1)
Related Publication 20170015214A1 · Jan 19, 2017