Production method for welded structure

Inventors: Yujiro Tatsumi (Tokyo, JP); Hiroki Fujimoto (Tokyo, JP); Masanori Yasuyama (Tokyo, JP)
Assignee: NIPPON STEEL CORPORATION
B23K26/14B23K26/146B23K26/147B23K26/26B23K26/32B23K2101/185B23K2103/04
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,427,245
App. No.
15/123,504
Granted
Oct 1, 2019
Kind
B2
Abstract

A method of production of a welded structure by butt welding two steel sheets ( 51, 52 ) by laser welding ( 11 ) while supplying assist gas ( 12 ) to a back surface of a melt pool ( 13 ), whereby it is possible to prevent formation of a through hole in the melt part ( 53 ), characterized in that a thickness of at least one steel sheet ( 52 ) of the two steel sheets ( 51, 52 ) is 0.6 mm or less, the assist gas ( 12 ) is a mixed gas ( 12 ) containing 10 to 50 vol % of O 2 gas, and, when an O 2 concentration in the mixed gas ( 12 ) is C (vol %), a flow rate L of mixed gas ( 12 ) (liter/min) satisfies 30 (liter/min)−C(vol %)×1 (liter/min/vol %)≤L (liter/min)<40 (liter/min).

Claims (118)

1. A method of producing a welded structure comprising the steps of:

butt welding two steel sheets by laser welding, and

supplying assist gas to a melt pool surface during said butt welding,

wherein a thickness of at least one steel sheet of said two steel sheets is 0.6 mm or less,

said assist gas is a mixed gas containing 10 to 50 vol % of O 2 gas;

when the O 2 concentration in said assist gas is C (vol %), a flow rate L of assist gas (liter/min) is

30

-

C

1

vol

%

L

1

liter

/

min

<

40

,

and

L

1

liter

/

min

10

;

and

when a welding speed is V (m/min), an average thickness of two steel sheets is “t” (mm), and a spot area of the laser is A (mm 2 ), an output of the laser is

1.45

kW

×

V

1

m

/

min

×

t

1

mm

×

A

1

mm

2

to

1.83

kW

×

V

1

m

/

min

×

t

1

mm

×

A

1

mm

2

.

2. The method of producing the welded structure according to claim 1 , wherein a front surface melt width of a melt part of said two steel sheets is made 2.3 times or less a thickness of a thinner steel sheet among the two steel sheets and a back surface melt width is made 0.5 to 1.2 times the melt width of the front surface.

3. The method of producing the welded structure according to claim 2 , wherein the O 2 concentration in said assist gas is 15 to 30 vol %.

4. The method of producing the welded structure according to claim 2 , wherein said assist gas is air.

5. The method of producing the welded structure according to claim 2 , further comprising, supplying said assist gas to said melt pool surface so as to flow in a direction opposite to a weld advancing direction.

6. The method of producing the welded structure according to claim 1 , wherein the O 2 concentration in said assist gas is 15 to 30 vol %.

7. The method of producing the welded structure according to claim 6 , wherein said assist gas is air.

8. The method of producing the welded structure according to claim 6 , further comprising, supplying said assist gas to said melt pool surface so as to flow in a direction opposite to a weld advancing direction.

9. The method of producing the welded structure according to claim 1 , wherein said assist gas is air.

10. The method of producing the welded structure according to claim 9 , further comprising, supplying said assist gas to said melt pool surface so as to flow in a direction opposite to a weld advancing direction.

11. The method of producing the welded structure according to claim 1 , further comprising, supplying said assist gas to said melt pool surface so as to flow in a direction opposite to a weld advancing direction.

12. The method of producing the welded structure according to claim 11 , further comprising, supplying said assist gas so as to intersect the melt pool surface.

13. The method of producing the welded structure according to claim 11 , further comprising, supplying said assist gas so as to intersect the steel sheet in front of said melt pool in the weld advancing direction.

14. The method of producing the welded structure according to claim 1 , wherein said welded structure is a tailored blank material.

Assignments (2)
CHANGE OF NAME Recorded May 14, 2019
From: NIPPON STEEL & SUMITOMO METAL CORPORATION
To: NIPPON STEEL CORPORATION
Reel/Frame 049257/0828 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 6, 2016
From: TATSUMI, YUJIRO; FUJIMOTO, HIROKI; YASUYAMA, MASANORI
To: NIPPON STEEL & SUMITOMO METAL CORPORATION
Reel/Frame 039640/0765 →
Priority Claims (1)
JP 2014-078075 · Apr 4, 2014 · national
Continuity (1)
Related Publication 20170072508A1 · Mar 16, 2017