IP Library Granted Patent US 10,280,051
Granted Patent B2
US 10,280,051 · App. 15/139,721 · Granted May 7, 2019

Multiple motorized lifting devices mounted to a structure

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,280,051
App. No.
15/139,721
Granted
May 7, 2019
Kind
B2
Abstract

A system includes two or more lifting devices attached to a structure each lifting device having a drum rotated by a motor to draw in or let out a line from the drum. The drum includes a groove formed in an outer surface thereof to accommodate the line. In certain embodiments, each of the lifting devices are quickly and easily detachable from the structure by way of a flange and mounting bracket. The flange and mounting bracket have holes which are coaxially aligned. A pin or other fastener is used to join the flange and mounting bracket together. Two or more lifting devices may be connected to and moved along a mounting bracket.

Claims (24)

1. A system comprising:

two or more lifting devices, adapted to cooperatively lift an object, each lifting device comprising a drum to draw in or let out a line, the drum comprising a groove formed in an outer surface thereof to accommodate the line, a motor coupled to the drum to apply a torque thereto, a roller extending into the groove immediately over the line in order to push the line into the groove, and a flange; and

a mounting bracket for mounting the two or more lifting devices to a structure.

2. The system of claim 1 , wherein the flange connects the lifting devices to the mounting bracket allowing quick and easy mounting and dismounting of the lifting devices from the structure.

3. The system of claim 2 , wherein the flange and the mounting bracket have holes which are coaxial.

4. The system of claim 3 , wherein the flange is attached to the mounting bracket with one of a pin, bolt, or other fastener through the holes.

5. The system of claim 4 , wherein the mounting bracket is attached to one of a stud, joist, ceiling, wall, or and structural member.

6. The system of claim 4 , wherein the mounting bracket is attached across several of said studs, joists, or structural members.

7. The system of claim 1 , further comprising a grouping module for operation of the two or more lifting devices as though they are a single device.

8. The system of claim 1 , further comprising a platform attached to the end of the line of each lifting device for lifting and storing objects.

9. The system of claim 8 , wherein the lifters are configured to keep the platform level.

10. The system of claim 1 , further comprising a synchronization module to enable the lifting devices to adjust drawing in and letting line out to the pace of the slowest operating lifting device.

11. The method of claim 1 , further comprising a grouping module for operation of the two or more lifting devices as though they are a single device.

12. The method of claim 11 , wherein the lifters are configured to keep the platform level.

13. The method of claim 1 , further comprising a synchronization module to enable the lifting devices to adjust drawing in and letting line out to the pace of the slowest operating lifting device.

14. A method comprising:

providing two or more lifting devices, adapted to cooperatively lift an object each lifting device comprising a drum to draw in or let out a line, the drum comprising a groove formed in an outer surface thereof to accommodate the line, a motor and transmission coupled to the drum to apply a torque thereto, and a roller extending into the groove immediately over the line in order to push the line into the groove; and

mounting the two or more lifting devices to a structure.

15. The method of claim 14 , wherein each of the two or more lifting devices have a flange which connects to a mounting bracket allowing the mounting of the two or more lifting devices to the structure.

16. The method of claim 15 , wherein the flange and the mounting bracket have holes which are coaxial.

17. The method of claim 16 , wherein the flange is attached to the mounting bracket with one of a pin, bolt, and other fastener through the holes.

18. The method of claim 17 , wherein the mounting bracket is attached to one of a stud, joist, ceiling, wall, and structural member.

19. The method of claim 17 , wherein the mounting bracket is attached across several of said studs, joists, or structural members.

20. The method of claim 14 , further comprising a platform attached to the end of the line for lifting and storing objects.

Assignments (8)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 30, 2025
From: GARAGE SMART INDUSTRIES, INC.
To: MILES, JEROME
Reel/Frame 073340/0587 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 28, 2025
From: HALL LABS LLC
To: GARAGE SMART INDUSTRIES, INC.
Reel/Frame 070369/0659 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 16, 2019
From: HALL, MICHAEL
To: HALL LABS LLC
Reel/Frame 048025/0337 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 12, 2018
From: TAYLOR, BENJAMIN
To: HALL LABS, LLC
Reel/Frame 047758/0331 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 7, 2018
From: MADSEN, DANIEL
To: HALL LABS LLC
Reel/Frame 047707/0052 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 27, 2018
From: MILES, JEROME
To: HALL LABS LLC
Reel/Frame 047157/0172 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 24, 2018
From: HALL, DAVID R.
To: HALL LABS LLC
Reel/Frame 047132/0022 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 12, 2018
From: HALL, DAVID R.
To: HALL LABS LLC
Reel/Frame 047058/0053 →