IP Library Granted Patent US 10,236,714
Granted Patent B2
US 10,236,714 · App. 15/141,351 · Granted Mar 19, 2019

UPS operation with high converter efficiency

Inventors: Arkadiusz Boratyn (Sosnica, PL); Esa-Kai Paatero (Minusio, CH); Rafael Jacukowicz (Cracow, PL)
Assignee: ABB Schweiz AG
H02J9/061G06F1/263G06F1/32G06F1/3234H02J1/102H02J3/06H02J9/062
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,236,714
App. No.
15/141,351
Granted
Mar 19, 2019
Kind
B2
Abstract

The present invention provides a method for controlling an uninterrupted power supply system comprising multiple converters and a control device, the multiple converters are connected in parallel between a power supply side and a load side of the uninterrupted power supply system, each converter is provided to be individually activated by the control device to provide power from the power supply side to the load side, comprising the steps of determining a system load level at the load side of the uninterruptable power supply system, determining a number of required active converters based on the system load level and a system efficiency depending on the number of active converters, and activating the number of required converters based on the above determination.

Claims (43)

1. Method for controlling an uninterrupted power supply system comprising multiple converters and a control device, whereby the multiple converters are connected in parallel between a power supply side and a load side of the uninterrupted power supply system, each converter is provided to be individually activated by the control device to provide power from the power supply side to the load side, comprising the steps of

determining a system load level at the load side of the uninterruptable power supply system,

determining a number of required active converters based on the system load level and a system efficiency depending on the number of active converters, comprising determining the system efficiency depending on the number of active converters and a known converter efficiency depending on a converter load level, and comprising selecting the number of active converters with the highest system efficiency,

the system efficiency being determined by the steps of

determining based on the system load level and the number of active converters a system efficiency,

determining based on the system load level and the number of active converters a system efficiency when one converter is removed and/or when one converter is added, and

determining a highest system efficiency from the determined system efficiency based on the number of active converters as well as the number of active converters when one converter is added and/or when one converter is removed, and

selecting the number of active converters with the highest system efficiency comprising comparing the highest system efficiency with a current system efficiency, and selecting the number of active converters with the highest system efficiency when the highest system efficiency is superior to the current system efficiency together with a pre-defined threshold value comprising a minimum system efficiency gain, and

activating the number of required converters based on the above determination.

2. Method according to claim 1 , wherein

the step of determining the system efficiency depending on the number of active converters and a known converter efficiency depending on a converter load level comprises determining the system efficiency depending on the number of active converters and a known converter efficiency depending on a converter load level for each converter individually and determining the system efficiency depending on the efficiency of each individual converter.

3. Method according to claim 1 , wherein

the method comprises the additional step of providing an efficiency curve or efficiency table for the converters, and

the step of determining based on the system load level and the number of active converters a system efficiency comprises identifying a point of operation on the efficiency curve or the efficiency table and the converter efficiency of this point of operation.

4. Method according to claim 1 , wherein

the step of selecting the number of active converters with the highest system efficiency comprises defining a load band for the system load, and selecting the number of active converters with the highest system efficiency in case the system load is out of the load band.

5. Method according to claim 1 , wherein

the step of determining a number of required active converters based on the system load level and a system efficiency depending on the number of active converters comprises determining the number of required active converters under additional consideration of a mode of operation of the UPS system and a level of redundancy.

6. Method according to preceding claim 5 , wherein

the mode of operation comprises a double conversion mode, also referred to as active mode, where a converter is fully operational, and a line interactive mode, where the load is supported by turning a load current that might contain harmonics into a utility current/source current with reduced harmonics.

7. Method according to claim 1 , wherein

the method comprises the step of maintaining converters, which are not active, in varying states of readiness based on activation times and effect on overall efficiency, whereby the converters maintain a system communication level to receive commands to change their operational state from an active state to a de-activated state with the different states of readiness and vice versa.

8. Method according to preceding claim 7 , wherein

the step of maintaining converters, which are not active, in varying states of readiness comprises:

maintaining converters, which are not active, connected to the power supply side and the load side, whereby the converter is energized and at least partially activated but not contributing to provide power at the load side,

maintaining converters, which are not active, connected to the power supply side and the load side, whereby the converter is energized but deactivated, and

maintaining converters, which are not active, connected to the power supply side and the load side, whereby the converter is not energized.

9. Method according to claim 2 , wherein

the step of determining a number of required active converters based on the system load level and a system efficiency depending on the number of active converters comprises determining the number of required active converters under additional consideration of a mode of operation of the UPS system and a level of redundancy.

10. Method according to claim 3 , wherein

the step of determining a number of required active converters based on the system load level and a system efficiency depending on the number of active converters comprises determining the number of required active converters under additional consideration of a mode of operation of the UPS system and a level of redundancy.

11. Method according to claim 4 , wherein

the step of determining a number of required active converters based on the system load level and a system efficiency depending on the number of active converters comprises determining the number of required active converters under additional consideration of a mode of operation of the UPS system and a level of redundancy.

12. Method according to claim 2 , wherein

the method comprises the step of maintaining converters, which are not active, in varying states of readiness based on activation times and effect on overall efficiency, whereby the converters maintain a system communication level to receive commands to change their operational state from an active state to a de-activated state with the different states of readiness and vice versa.

13. Method according to claim 3 , wherein

the method comprises the step of maintaining converters, which are not active, in varying states of readiness based on activation times and effect on overall efficiency, whereby the converters maintain a system communication level to receive commands to change their operational state from an active state to a de-activated state with the different states of readiness and vice versa.

14. Method according to claim 4 , wherein

the method comprises the step of maintaining converters, which are not active, in varying states of readiness based on activation times and effect on overall efficiency, whereby the converters maintain a system communication level to receive commands to change their operational state from an active state to a de-activated state with the different states of readiness and vice versa.

15. Method according to claim 5 , wherein

the method comprises the step of maintaining converters, which are not active, in varying states of readiness based on activation times and effect on overall efficiency, whereby the converters maintain a system communication level to receive commands to change their operational state from an active state to a de-activated state with the different states of readiness and vice versa.

16. Method according to claim 6 , wherein

the method comprises the step of maintaining converters, which are not active, in varying states of readiness based on activation times and effect on overall efficiency, whereby the converters maintain a system communication level to receive commands to change their operational state from an active state to a de-activated state with the different states of readiness and vice versa.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 30, 2018
From: BORATYN, ARKADIUSZ; PAATERO, ESA-KAI; JACUKOWICZ, RAFAEL
To: ABB SCHWEIZ AG
Reel/Frame 044771/0544 →
MERGER Recorded Nov 15, 2016
From: ABB TECHNOLOGY LTD.
To: ABB SCHWEIZ AG
Reel/Frame 040621/0687 →
MERGER Recorded Nov 11, 2016
From: ABB TECHNOLOGY AG
To: ABB SCHWEIZ AG
Reel/Frame 040602/0792 →
Priority Claims (1)
EP 15165849 · Apr 30, 2015 · regional
Continuity (1)
Related Publication 20160322862A1 · Nov 3, 2016