IP Library Granted Patent US 10,161,824
Granted Patent B2
US 10,161,824 · App. 15/151,309 · Granted Dec 25, 2018

Hydrostatic pressure test method and apparatus

Inventors: Clifford Lee Hilpert (Conroe, TX); Jeffrey Lee Hilpert (Conroe, TX); Lewis Jackson Dutel (Huston, TX); Laura Tufts Meyer (Sealy, TX)
Assignee: HilFlo, LLC
G01M3/02E21B33/06E21B36/00F28F9/26F28F27/00
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,161,824
App. No.
15/151,309
Granted
Dec 25, 2018
Kind
B2
Abstract

A method of pressure testing a closed hydraulic system for leaks includes heating or cooling pressure intensification fluid before it enters the closed hydraulic system under pressure. The closed hydraulic system may be for example a blowout preventer for an oil/gas well, a manifold system or tubulars. The intensification fluid is heated or cooled to a temperature at or near the temperature of the fluid within the closed hydraulic system.

Claims (16)

1. A method of pressure testing a closed hydraulic system for leaks comprising:

a) initiating a flow of intensification fluid under pressure to the closed hydraulic system to establish a first pressure level within the closed hydraulic system,

b) cooling or heating the intensification fluid to a level corresponding to the temperature of the closed hydraulic system,

c) isolating the closed hydraulic system from the pressurized testing fluid, and

d) measuring any pressure changes within the closed hydraulic system,

wherein the intensification fluid is pressurized by an intensification pump and the intensification fluid is cooled or heated prior to entering the intensification pump.

2. The method of claim 1 wherein the closed hydraulic system is a blowout preventer positioned on a subsea oil/gas well.

3. The method of claim 1 wherein the closed hydraulic system is a blowout preventer for a surface oil/gas well.

4. The method of claim 1 wherein the testing fluid is pressurized by an intensification pump and the intensification fluid is cooled or heated after it exits the intensification pump.

5. The method of claim 1 wherein the closed hydraulic system is a blowout preventer for an oil/gas well which includes a drill string and the intensification fluid is cooled or heated to be at or near the ambient temperature of the drilling fluid within the drill string and the blowout preventer.

6. The method according to claim 2 wherein the intensification fluid is cooled or heated by a heat exchanger and the heat exchange fluid is seawater.

7. A method of pressure testing a blowout preventor positioned on a subsea oil/gas well for leaks comprising:

a) initiating a flow of intensification fluid under pressure to the closed hydraulic system to establish a first pressure level within the closed hydraulic system,

b) cooling or heating the intensification fluid to a level corresponding to the temperature of the closed hydraulic system,

c) isolating the closed hydraulic system from the pressurized testing fluid, and

d) measuring any pressure changes within the closed hydraulic system, wherein the intensification fluid is cooled or heated by a heat exchanger and the heat exchange fluid is seawater.

Assignments (7)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 24, 2019
From: SHELL OIL COMPANY
To: ENGENUITY, INC.
Reel/Frame 051362/0476 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 24, 2019
From: HILFLO, LLC; ENGENUITY, INC.
To: ENGIP, LLC
Reel/Frame 051362/0429 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 23, 2019
From: HILFLO, LLC
To: ENGIP, LLC
Reel/Frame 051358/0982 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 23, 2019
From: DUTEL, LEWIS JACKSON; MEYER, LAURA
To: SHELL OIL COMPANY
Reel/Frame 051359/0017 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 14, 2016
From: HILPERT, CLIFFORD LEE; HILPERT, JEFFERY LEE
To: HILFLO, LLC
Reel/Frame 040309/0052 →
SECURITY INTEREST Recorded Nov 14, 2016
From: HILFLO, LLC
To: HALLIBURTON ENERGY SERVICES, INC.
Reel/Frame 040309/0746 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 6, 2016
From: HILPERT, CLIFFORD LEE; HILPERT, JEFFREY LEE
To: HILFLO, LLC
Reel/Frame 039954/0158 →
Continuity (2)
Provisional Application 62159426 · May 11, 2015
Related Publication 20160334298A1 · Nov 17, 2016