Container arrangement for power transformers

Inventor: Christian Ettl (Weiz, AT)
Assignee: Siemens Aktiengesellschaft
H01F27/02H01F27/002H01F30/12
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,381,147
App. No.
15/159,349
Granted
Aug 13, 2019
Kind
B2
Abstract

A container arrangement for power transformers that are constructed from individual components. The components are releasably connected to one another in such a way that simple mounting/demounting and separate transportation is made possible. At least some of the components are arranged in containers, wherein each container contains a predetermined type of components in such a way that the components necessary for intended construction variants of the power transformers at the use location are contained in a corresponding selection of containers. This renders possible the correct and efficient mounting of power transformers.

Claims (8)

1. A method of mounting a power transformer as a temporary replacement for a failed transformer, the method comprising:

in a first step, determining a construction variant of the power transformer to be assembled at a use location;

subsequently selecting certain containers in accordance with the construction variant determined in the first step;

dispatching the selected certain containers and remaining components to the use location; and

mounting the power transformer in the predetermined design variant at the use location; and

performing the step of mounting the power transformer in the predetermined design variant at the use location before removing the failed transformer.

2. The method according to claim 1 , which comprises placing and arranging the containers at the use location to thereby minimize cost and complexities of a mounting operation.

3. The method according to claim 1 , which comprises: after the power transformer has been mounted and is functioning, replacing the failed transformer with a transformer.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 5, 2021
From: SIEMENS AKTIENGESELLSCHAFT
To: SIEMENS ENERGY GLOBAL GMBH & CO. KG
Reel/Frame 056501/0020 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 4, 2016
From: ETTL, CHRISTIAN
To: SIEMENS AKTIENGESELLSCHAFT
Reel/Frame 039345/0422 →
Priority Claims (1)
DE 10 2016 207 331 · Apr 29, 2016 · national
Continuity (1)
Related Publication 20170316860A1 · Nov 2, 2017