IP Library Granted Patent US 10,294,769
Granted Patent B2
US 10,294,769 · App. 15/164,457 · Granted May 21, 2019

Optimized liquid or condensate well production

Inventors: David E. Fortnum (Calgary, CA); Srecko Zizakovic (Calgary, CA)
Assignee: BAKER HUGHES, A GE COMPANY, LLC
E21B43/305E21B33/1208E21B34/06E21B43/128E21B43/38
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,294,769
App. No.
15/164,457
Granted
May 21, 2019
Kind
B2
Abstract

A dedicated borehole for an ESP or artificial lift mechanism communicates with a sump or wellbore to collect liquids and/or condensate from one or more other bores where there can be laterals into a producing formation. If the ESP or artificial lift mechanism needs to be replaced the dedicated bore with the ESP or artificial lift mechanism can be closed off and the ESP or artificial lift mechanism removed without taking out the main bore or bores connected to the sump or wellbore. Those bores can continue to produce gas as liquids and/or condensate accumulate in the sump, sumps or wellbore. When the ESP or artificial lift mechanism is replaced the liquid can be pumped to surface without interruption of the gas production.

Claims (41)

1. A well configuration, comprising:

at least one main borehole comprising multiple discrete laterals that drain into said main bore to conduct produced liquid from the formation into a collection sump where said main bore terminates, said main borehole conducting produced gas from the formation to a first remote location in an uphole direction;

an auxiliary borehole further comprising an artificial lift device and terminating at said sump for selective removal of only said produced liquid to a second remote location;

a barrier in said auxiliary bore selectively closed to allow removal of said artificial lift device while continuing to produce gas to the first remote location through said main borehole.

2. The well configuration of claim 1 , wherein:

said main borehole comprises at least one lateral oriented to allow produced liquid to collect in said sump.

3. The well configuration of claim 1 , wherein:

said artificial lift device comprises an electric submersible pump.

4. The well configuration of claim 1 , wherein:

said main borehole is oriented to allow gravity drainage of produced liquids to said sump.

5. The well configuration of claim 1 , wherein:

said main borehole further comprises a packer with a nipple profile adapted to accept a plug.

6. The well configuration of claim 1 , wherein:

produced gas and liquid separate from each other in said sump.

7. The well configuration of claim 6 , wherein:

said artificial lift device comprises an electric submersible pump.

8. The well configuration of claim 7 , wherein:

said main borehole is oriented to allow gravity drainage of produced liquids to said sump.

9. The well configuration of claim 8 , wherein:

said main borehole further comprises a packer with a nipple profile adapted to accept a plug.

10. The well configuration of claim 9 , wherein:

produced gas and liquid separate from one another in said sump.

11. A production method, comprising:

providing a main borehole comprising multiple laterals that drain back produced fluids to said main borehole with said main borehole terminating at a sump;

providing an auxiliary borehole terminating into said sump;

producing only liquids with an artificial lift device in said auxiliary borehole from said sump;

producing only formation gas from said main borehole regardless of whether said auxiliary borehole is or is not in service.

12. The method of claim 11 , comprising:

removing said artificial lift device from said auxiliary borehole while producing gas from said main borehole.

13. The method of claim 11 , comprising:

providing at least one lateral from said main borehole.

14. The method of claim 11 , comprising:

locating said sump for gravity liquid drainage into said sump from said main borehole.

15. The method of claim 11 , comprising:

providing an isolation valve in said auxiliary borehole between said artificial lift device and said sump.

16. The method of claim 11 , comprising:

providing an electric submersible pump as said artificial lift device.

17. The method of claim 11 , comprising:

providing a packer with a nipple profile adapted to accept a plug in said main borehole.

18. The method of claim 11 , comprising:

separating produced gas from produced liquid in said sump.

Assignments (3)
CHANGE OF NAME Recorded Jun 9, 2023
From: BAKER HUGHES, A GE COMPANY, LLC
To: BAKER HUGHES HOLDINGS LLC
Reel/Frame 063955/0583 →
CHANGE OF NAME Recorded Nov 28, 2022
From: BAKER HUGHES INCORPORATED
To: BAKER HUGHES, A GE COMPANY, LLC
Reel/Frame 061997/0350 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 25, 2016
From: FORTNUM, DAVID E.; ZIZAKOVIC, SRECKO
To: BAKER HUGHES INCORPORATED
Reel/Frame 038719/0717 →
Continuity (2)
Provisional Application 62173764 · Jun 10, 2015
Related Publication 20160362970A1 · Dec 15, 2016