IP Library Granted Patent US 9,662,607
Granted Patent B2
US 9,662,607 · App. 15/170,035 · Granted May 30, 2017

CO

Inventors: Tatsuya Tsujiuchi (Tokyo, JP); Hiromitsu Nagayasu (Tokyo, JP); Takuya Hirata (Tokyo, JP); Keiji Fujikawa (Tokyo, JP); Tetsuya Imai (Tokyo, JP); Hiroshi Tanaka (Tokyo, JP); Tsuyoshi Oishi (Tokyo, JP); Masahiko Tatsumi (Hyogo, JP); Yasuyuki Yagi (Hyogo, JP); Kazuhiko Kaibara (Hyogo, JP)
Assignees: MITSUBISHI HEAVY INDUSTRIES, LTD.; THE KANSAI ELECTRIC POWER CO., INC.
B01D53/1425B01D53/1475F23J15/006F23J15/04F23J15/06F23L7/002F23L15/04B01D2252/204B01D2257/302B01D2258/0283F23G2207/104F23J2215/20F23J2219/40Y02C10/06Y02E20/326Y02E20/348
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,662,607
App. No.
15/170,035
Granted
May 30, 2017
Kind
B2
Abstract

A CO 2 recovery unit includes an absorber that reduces CO 2 in flue gas ( 101 ) discharged from a combustion facility ( 50 ) by absorbing CO 2 by an absorbent, a regenerator that heats the absorbent having absorbed CO 2 to emit CO 2 , and regenerates and supplies the absorbent to the absorber, and a regenerating heater that uses steam ( 106 ) supplied from the combustion facility ( 50 ) for heating the absorbent in the regenerator and returns heated condensed water ( 106 a ) to the combustion facility ( 50 ). The CO 2 recovery unit further includes a condensed water/flue gas heat exchanger ( 57 ) that heats the condensed water ( 106 a ) to be returned from the regenerating heater to the combustion facility ( 50 ) by heat-exchanging the condensed water ( 106 a ) with the flue gas ( 101 ) in a flue gas duct ( 51 ) in the combustion facility ( 50 ).

Claims (15)

1. An operation method of a plant comprising:

a combustion step that discharges flue gas to a flue gas duct and heats condensed water from a condensed water line so as to discharge the heated condensed water to a steam extracting line as steam;

an air/flue gas heat exchanging step that heat-exchanges the flue gas with combustion air;

a CO2 recovery step including:

an absorbing step that reduces CO 2 in flue gas discharged from the combustion step via the air/flue gas heat exchanging step by absorbing CO 2 by an absorbent;

a regeneration step that heats the absorbent having absorbed CO 2 to emit CO 2 , and regenerates and supplies the absorbent to the absorbing step; and

a regenerating heat step that heats the absorbent in the regeneration step with the steam from the steam extracting line and returns heated condensed water to the combustion step via the condensed water line; and

a condensed water/flue gas heat exchanging step that heats the condensed water of the condensed water line by heat-exchanging the condensed water with the flue gas in the flue gas duct discharged from the air/flue gas heat exchanging step.

2. The method according to claim 1 , further comprising:

a bypass step of directly supplying the condensed water of the condensed water line without via the condensed water/flue gas heat exchanging step.

3. The method according to claim 1 , further comprising:

a circulating water/flue gas heat exchanging step that performs heat exchange between circulating water and the flue gas in the flue gas duct after the condensed water/flue gas heat exchanging step; and

a circulating water/absorbent heat exchanging step that performs heat exchange between the absorbent having absorbed CO 2 in the absorbing step and the circulating water before the absorbent reaches the regeneration step.

4. The method according to claim 1 , further comprising an air preheating step that preheats the combustion air before the combustion step by waste heat discharged in a process of CO 2 recovery step.

5. The method according to claim 1 , further comprising an air preheater that preheats the combustion air before reaching the combustion step by the condensed water before reaching the condensed water/flue gas heat exchanging step.

Assignments (5)
CHANGE OF NAME Recorded Dec 14, 2023
From: MITSUBISHI HEAVY INDUSTRIES ENGINEERING, LTD.
To: MHI ENGINEERING, LTD.
Reel/Frame 066014/0774 →
NUNC PRO TUNC ASSIGNMENT Recorded Dec 14, 2023
From: MHI ENGINEERING, LTD.
To: MITSUBISHI HEAVY INDUSTRIES, LTD.
Reel/Frame 066014/0870 →
CORRECTIVE ASSIGNMENT TO CORRECT THE ASSIGNEE NAME PREVIOUSLY RECORDED ON REEL 046465 FRAME 0365. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Sep 20, 2018
From: MITSUBISHI HEAVY INDUSTRIES, LTD.
To: MITSUBISHI HEAVY INDUSTRIES ENGINEERING, LTD.
Reel/Frame 047117/0772 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 26, 2018
From: MITSUBISHI HEAVY INDUSTRIES, LTD.
To: MITSUBISHI HEAVY INDUSTRIES ENGINEERING LTD.
Reel/Frame 046465/0365 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 1, 2016
From: TSUJIUCHI, TATSUYA; NAGAYASU, HIROMITSU; HIRATA, TAKUYA; FUJIKAWA, KEIJI; IMAI, TETSUYA; TANAKA, HIROSHI; OISHI, TSUYOSHI; TATSUMI, MASAHIKO; YAGI, YASUYUKI; KAIBARA, KAZUHIKO
To: MITSUBISHI HEAVY INDUSTRIES, LTD.; THE KANSAI ELECTRIC POWER CO., INC.
Reel/Frame 038762/0828 →
Priority Claims (1)
JP 2010-037790 · Feb 23, 2010 · national
Continuity (2)
Division 13580469
Related Publication 20160271557A1 · Sep 22, 2016