IP Library Granted Patent US 10,554,257
Granted Patent B2
US 10,554,257 · App. 15/177,930 · Granted Feb 4, 2020

System and method for inferring schematic and topological properties of an electrical distribution grid

Inventors: Jerritt Hansell (Boulder, CO); Henrik F. Bernheim (Denver, CO); Yu Liao (Longmont, CO); Marcia Reid Martin (Longmont, CO); Andrew Louis Abendschein (Longmont, CO)
Assignees: Dominion Energy Technologies, Inc.; Astrolink International LLC
H04B3/54G01R29/18G05B13/02H02J13/002H04B3/542H04B3/546H04L41/0803H04L41/083H04L41/12H04L43/0847G06Q50/06H04B2203/5433H04B2203/5466H04L1/0009H04L1/188Y02E60/723Y02E60/7815Y02E60/7892Y04S10/16Y04S40/121Y04S40/146Y04S40/162Y04S40/168
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,554,257
App. No.
15/177,930
Granted
Feb 4, 2020
Kind
B2
Abstract

A system and method for inferring schematic and topological properties of an electrical distribution grid is provided. The system may include Remote Hubs, Subordinate Remotes, a Substation Receiver, and an associated Computing Platform and Concentrator. At least one intelligent edge transmitter, called a Remote Hub Edge Transmitter, may transmit messages on the electrical distribution grid by injecting a modulated current into a power main that supplies an electric meter. The Subordinate Remotes, Remote Hubs, the Substation Receiver, and the associated Computing Platform and Concentrator may contain processing units which execute stored instructions allowing each node in the network to implement methods for organizing the on-grid network and transmitting and receiving messages on the network. The Substation Receiver, Computing Platform, and Concentrator may detect and infer schematic grid location attributes of the network and publish the detected and inferred attributes to other application systems including geospatial information systems.

Claims (34)

1. A method comprising:

sending, by a first remote hub comprising a processor device, a first pilot signal on a first phase of a plurality of phases of an electrical distribution grid to which the first remote hub is coupled, the first remote hub being coupled to the first phase on a low voltage side of a transformer;

receiving, from a second remote hub coupled to the first phase, a first acknowledgement message;

in response to the first acknowledgement message, updating an inventory to identify the second remote hub as being coupled to the first phase on the low voltage side of the transformer;

receiving, from a third remote hub, a negative acknowledgement message; and

in response to the negative acknowledgement message, updating the inventory to identify the third remote hub as being coupled to a second phase on the low voltage side of the transformer.

2. The method of claim 1 further comprising sending, by the first remote hub to the third remote hub, a message instructing the third remote hub to initiate a second pilot signal on the second phase.

3. The method of claim 2 further comprising:

receiving, from a fourth remote hub coupled to the second phase on the low voltage side of the transformer, a second acknowledgement message; and

in response to the second acknowledgement message, updating the inventory to identify the fourth remote hub as being coupled to the second phase on the low voltage side of the transformer.

4. The method of claim 3 further comprising:

iteratively transmitting, onto the first phase, a poll signal, wherein at each successive iteration an amplitude of the poll signal is increased; and

recording an amplitude of the poll signal wherein the second remote hub responds to the poll signal and neither the third remote hub or the fourth remote hub respond to the poll signal.

5. The method of claim 1 further comprising:

generating, by the first remote hub, a message; and

sending, by the first remote hub to the second remote hub, the message and an instruction to send the message via the second phase to a substation receiver coupled to the electrical distribution grid on a high voltage side of the transformer.

6. A first remote hub comprising:

a memory; and

a processor device coupled to the memory and configured to:

send a first pilot signal on a first phase of a plurality of phases of an electrical distribution grid to which the first remote hub is coupled;

receive, from a second remote hub coupled to the first phase, a first acknowledgement message;

in response to the first acknowledgement message, update an inventory to identify the second remote hub as being coupled to the first phase on a low voltage side of a transformer;

receive, from a third remote hub, a negative acknowledgement message; and

in response to the negative acknowledgement message, update the inventory to identify the third remote hub as being coupled to a second phase on the low voltage side of the transformer.

7. The first remote hub of claim 6 wherein the processor device is further configured to send, by the first remote hub to the third remote hub, a message instructing the third remote hub to initiate a second pilot signal on the second phase.

8. The first remote hub of claim 7 wherein the processor device is further configured to:

receive, from a fourth remote hub coupled to the second phase on the low voltage side of the transformer, a second acknowledgement message; and

in response to the second acknowledgement message, update the inventory to identify the fourth remote hub as being coupled to the second phase on the low voltage side of the transformer.

9. The first remote hub of claim 8 wherein the processor device is further configured to:

iteratively transmit, onto the first phase, a poll signal, wherein at each successive iteration an amplitude of the poll signal is increased; and

record an amplitude of the poll signal wherein the second remote hub responds to the poll signal and neither the third remote hub or the fourth remote hub respond to the poll signal.

10. The first remote hub of claim 6 wherein the processor device is further configured to:

generate a message; and

send, to the second remote hub, the message and an instruction to send the message via the second phase to a substation receiver coupled to the electrical distribution grid on a high voltage side of the transformer.

Assignments (4)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 22, 2020
From: LOCKHEED MARTIN CORPORATION
To: TRC COMPANIES, INC.
Reel/Frame 052469/0136 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 11, 2019
From: ASTROLINK INTERNATIONAL LLC
To: LOCKHEED MARTIN CORPORATION
Reel/Frame 051241/0270 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 18, 2019
From: HANSELL, JERRITT; BERNHEIM, HENRIK F.; LIAO, YU; MARTIN, MARCIA REID; ABENDSCHEIN, ANDREW LOUIS
To: POWER TAGGING TECHNOLOGIES, INC.
Reel/Frame 051036/0955 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 18, 2019
From: POWER TAGGING TECHNOLOGIES, INC.
To: ASTROLINK INTERNATIONAL LLC; DOMINION ENERGY TECHNOLOGIES, INC.
Reel/Frame 051047/0478 →
Continuity (4)
Continuation 13871944 · Apr 26, 2013
Provisional Application 61779222 · Mar 13, 2013
Provisional Application 61766551 · Feb 19, 2013
Related Publication 20160285511A1 · Sep 29, 2016
Cited By (1)
US 12,222,793