IP Library Granted Patent US 9,500,564
Granted Patent B2
US 9,500,564 · App. 15/200,125 · Granted Nov 22, 2016

Process for testing a compressor or a combustor of a gas turbine engine using a large compressed air storage reservoir

Inventors: Joseph D Brostmeyer (Jupiter, FL); Robert L Memmen (Stuart, FL)
Assignee: S & J DESIGN, LLC
G01M15/14F01D21/003F01D25/285G01M9/04G01M17/007F05D2220/323F05D2260/83
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,500,564
App. No.
15/200,125
Granted
Nov 22, 2016
Kind
B2
Abstract

A process for testing a full-sized aircraft or full-sized gas turbine engine in a wind tunnel and includes the steps of securing a full-sized aircraft or engine in a wind tunnel for testing; filling an underground storage reservoir with compressed air; passing pre-treated compressed air from the underground storage reservoir through the wind tunnel for testing of the full-sized aircraft or engine; connecting an outlet of the wind tunnel to an ejector; and, passing compressed air from the underground storage reservoir through the ejector to decrease the exit pressure at the wind tunnel during testing of the full-sized aircraft or engine. The step of pre-treating compressed air from the underground storage reservoir includes preheating the compressed air; and, passing the higher temperature compressed air into the wind tunnel.

Claims (14)

1. A process for testing a full-sized aircraft or full-sized gas turbine engine in a wind tunnel comprising the steps of:

securing a full-sized aircraft or engine in a wind tunnel for testing;

filling an underground storage reservoir with compressed air;

passing pre-treated compressed air from the underground storage reservoir through the wind tunnel for testing of the full-sized aircraft or engine;

connecting an outlet of the wind tunnel to an ejector; and,

passing compressed air from the underground storage reservoir through the ejector to decrease the exit pressure at the wind tunnel during testing of the full-sized aircraft or engine.

2. The process for testing a full-sized aircraft or engine in a wind tunnel of claim 1 , and further comprising the steps of:

the step of pre-treating compressed air from the underground storage reservoir includes preheating the compressed air; and,

passing the higher temperature compressed air into the wind tunnel.

3. The process for testing a full-sized aircraft or engine in a wind tunnel of claim 2 , and further comprising the steps of:

the step of pre-treating compressed air from the underground storage reservoir includes preheating the compressed air without lowering an oxygen content of the compressed air to a higher temperature.

4. The process for testing a full-sized aircraft or engine in a wind tunnel of claim 1 , and further comprising the steps of:

the step of pre-treating compressed air from the underground storage reservoir includes passing the compressed air from the underground storage reservoir through an air turbine to lower the temperature of the compressed air; and,

passing the lower temperature compressed air into the wind tunnel.

Assignments (6)
SECURITY INTEREST Recorded Mar 17, 2026
From: FLORIDA TURBINE TECHNOLOGIES INC.; KRATOS ANTENNA SOLUTIONS CORPORATION; KRATOS INTEGRAL HOLDINGS, LLC; KRATOS SRE, INC.; KRATOS TECHNOLOGY & TRAINING SOLUTIONS, INC.; KRATOS UNMANNED AERIAL SYSTEMS, INC.; MICRO SYSTEMS, INC.
To: PNC BANK, NATIONAL ASSOCIATION
Reel/Frame 075103/0203 →
RELEASE OF PATENT SECURITY INTEREST RECORDED AT R/F 59664/0917 Recorded Mar 4, 2026
From: TRUIST BANK
To: FLORIDA TURBINE TECHNOLOGIES, INC.; GICHNER SYSTEMS GROUP, INC.; KRATOS ANTENNA SOLUTIONS CORPORATION; KRATOS INTEGRAL HOLDINGS, LLC; KRATOS TECHNOLOGY & TRAINING SOLUTIONS, INC.; KRATOS UNMANNED AERIAL SYSTEMS, INC.; MICRO SYSTEMS, INC.
Reel/Frame 075029/0769 →
RELEASE OF SECURITY INTEREST Recorded Apr 6, 2022
From: TRUIST BANK (AS SUCCESSOR BY MERGER TO SUNTRUST BANK), COLLATERAL AGENT
To: KTT CORE, INC.; FTT AMERICA, LLC; CONSOLIDATED TURBINE SPECIALISTS, LLC; FLORIDA TURBINE TECHNOLOGIES, INC.
Reel/Frame 059619/0336 →
SECURITY INTEREST Recorded Apr 6, 2022
From: FLORIDA TURBINE TECHNOLOGIES, INC.; GICHNER SYSTEMS GROUP, INC.; KRATOS ANTENNA SOLUTIONS CORPORATON; KRATOS INTEGRAL HOLDINGS, LLC; KRATOS TECHNOLOGY & TRAINING SOLUTIONS, INC.; KRATOS UNMANNED AERIAL SYSTEMS, INC.; MICRO SYSTEMS, INC.
To: TRUIST BANK, AS ADMINISTRATIVE AGENT
Reel/Frame 059664/0917 →
SUPPLEMENT NO. 1 TO AMENDED AND RESTATED INTELLECTUAL PROPERTY SECURITY AGREEMENT Recorded Mar 6, 2019
From: KTT CORE, INC.; FTT AMERICA, LLC; TURBINE EXPORT, INC.; ELWOOD INVESTMENTS LLC; CONSOLIDATED TURBINE SPECIALISTS LLC; S&J DESIGN LLC; FLORIDA TURBINE TECHNOLOGIES INC.
To: SUNTRUST BANK
Reel/Frame 048521/0081 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 3, 2017
From: BROSTMEYER, JOSEPH D; MEMMEN, ROBERT L
To: FLORIDA TURBINE TECHNOLOGIES, INC.
Reel/Frame 040828/0155 →
Continuity (6)
Division 14934219 · Nov 6, 2015
Continuation In Part 14008308
Provisional Application 61468771 · Mar 29, 2011
Provisional Application 61561956 · Nov 21, 2011
Provisional Application 61587022 · Jan 16, 2012
Related Publication 20160313212A1 · Oct 27, 2016