IP Library Granted Patent US 9,534,415
Granted Patent B2
US 9,534,415 · App. 15/203,989 · Granted Jan 3, 2017

Transport of a tower of a wind turbine

Inventors: Jesper Moeller (Brande, DK); Kenneth Helligsoe Svinth (Aarhus C, DK)
Assignee: SIEMENS AKTIENGESELLSCHAFT
E04H12/28E04H12/00E04H12/344F03D1/005F05B2240/122Y02E10/72
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,534,415
App. No.
15/203,989
Granted
Jan 3, 2017
Kind
B2
Abstract

The disclosed concerns a method of transporting a tower of a wind turbine in an upright position to an assembly site of the wind turbine, whereby the tower is equipped with a strake set comprising a number of strakes positioned to lead from a top of the tower in the upright position down towards a bottom of the tower, at least one of the strakes being realized as a detachable strake. The invention also concerns a strake set and transport assembly.

Claims (13)

1. A strake set for the external surface of a tower of a wind turbine for transport in an upright position to an assembly site of the wind turbine, comprising:

a number of independently adjustable strakes, wherein at least one of the strakes has a helicity which is adjustable when the strake is attached to the tower of a wind turbine at at least one point;

wherein at least one of the independently adjustable strakes includes a rope, wherein the rope is covered along at least a substantial part of its longitudinal extension with a covering structure which substantially increases the wind resistance of the strake, and the covering structure is not directly attached to the tower and is not directly attached to the rope.

2. The strake set according to claim 1 , wherein the covering structure may move with respect to the rope.

3. The strake set according to claim 1 , wherein the covering structure is comprised of individual sections.

4. The strake set according to claim 1 , wherein the portion of the rope covered with the covering structure is a distance sufficient to cover a quarter of a height of the tower.

5. The strake set according to claim 1 , wherein the covering structure has a cross-sectional shape with reference to the longitudinal extension of the strake, the cross-sectional shape comprising a geometrical figure with at least three angles.

6. The strake set according to claim 5 , wherein the geometrical figure comprises a number of planes interconnecting the angles, each of the number of planes having essentially a same extension in the cross-section.

7. The strake set according to claim 5 , wherein the covering structure is assembled about the rope over a mechanical reinforcement structure, the mechanical reinforcement structure configured to support the covering structure in the geometrical figure.

8. The strake set according to claim 1 , wherein the covering structure leaves at least one terminating portion of the rope uncovered.

9. The strake set according to claim 1 , wherein the covering structure comprises a flexible film material.

10. The strake set according to claim 2 wherein the rope comprises a fibre material.

11. A turbine tower equipped with a strake set according to claim 1 .

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 3, 2019
From: SIEMENS AKTIENGESELLSCHAFT
To: SIEMENS GAMESA RENEWABLE ENERGY A/S
Reel/Frame 048003/0631 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 13, 2016
From: SIEMENS WIND POWER A/S
To: SIEMENS AKTIENGESELLSCHAFT
Reel/Frame 039140/0278 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 11, 2016
From: MOELLER, JESPER; SVINTH, KENNETH HELLIGSOE
To: SIEMENS WIND POWER A/S
Reel/Frame 039124/0438 →
Priority Claims (1)
EP 13185348 · Sep 20, 2013 · regional
Continuity (2)
Continuation 14326541 · Jul 9, 2014
Related Publication 20160312761A1 · Oct 27, 2016