IP Library Granted Patent US 9,756,568
Granted Patent B2
US 9,756,568 · App. 15/273,886 · Granted Sep 5, 2017

Enhance AT command for backoff timer control

Inventors: Chien-Chun Huang-Fu (Hsinchu, TW); Yuan-Chieh Lin (Taipei, TW); Marko Niemi (Oulu, FI); Yu-Syuan Jheng (Taipei, TW)
Assignee: MEDIATEK INC.
H04W52/0229H04W28/06H04W28/12
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,756,568
App. No.
15/273,886
Granted
Sep 5, 2017
Kind
B2
Abstract

AT commands are used for controlling Mobile Termination (MT) functions and GSM/UMTS network services from a Terminal Equipment (TE) through Terminal Adaptor (TA). 3GPP introduces multiple backoff timers and barring to solve network congestion problem. However, a TE does not know the timer value and the barring status. In accordance with one novel aspect, a new AT command interface that can respond timer value and barring status to the TE is proposed. It reduces wasteful retries and saves power consumption of the TE. Through the new AT command interface, the TE can query backoff timer status. Via unsolicited result code (URC), the MT can detect backoff timer status change and report updated backoff timer status to the TE.

Claims (33)

1. A method, comprising:

transmitting a first Attention (AT) command by a terminal equipment (TE) in a mobile communication network, wherein the first AT command is for querying backoff timer status information associated with an access point name (APN);

receiving a response from a mobile termination (MT), wherein the response includes the backoff timer status information; and

scheduling a second AT command associated with the corresponding APN based on the backoff timer status information.

2. The method of claim 1 , wherein the access point name is a specific access point name (APN) or a list of existing access point names (APNs).

3. The method of claim 1 , wherein the first AT command is for querying the backoff timer status information associated with a session management (SM) request.

4. The method of claim 1 , wherein the backoff timer status information comprises a backoff timer value, a residual timer value, or a barring status.

5. The method of claim 1 , wherein the backoff timer status information comprises at least one of a reattempt radio access technology (RAT) indicator, a reattempt public land mobile network (PLMN) indicator, a non-access stratum (NAS) signaling low priority indicator, a backoff timer type, a session management or EPS session management (SM/ESM) cause value, and an SM/ESM request.

6. The method of claim 1 , wherein the backoff timer status information further comprises one or more SM/ESM procedures related to a backoff timer type or an SM/ESM cause value.

7. The method of claim 6 , wherein one or all of three SM procedures ACTIVATE PDP CONTEXT REQUEST, ACTIVATE SECONDARY PDP CONTEXT REQUEST, and MODIFY PDP CONTEXT REQUEST are barred based on the backoff timer type or the SM/ESM cause value.

8. The method of claim 6 , wherein one or all of three ESM procedures PDN CONNECTIVITY REQUEST, BEARER RESOURCE MODIFICATION REQUEST, and BEARER RESOURCE ALLOCATION REQUEST are barred based on the backoff timer type or the SM/ESM cause value.

9. A terminal equipment (TE), comprising:

a transmitter that transmits a first Attention (AT) command in a mobile communication network, wherein the first AT command is for querying backoff timer status information associated with an access point name (APN);

a receiver that receives a response from a mobile termination (MT), wherein the response includes the backoff timer status information; and

a scheduler that schedules a second AT command associated with the corresponding APN based on the backoff timer status information.

10. The TE of claim 9 , wherein the access point name is a specific access point name (APN)or a list of existing access point names (APNs)).

11. The TE of claim 9 , wherein the first AT command is for querying the backoff timer status information associated with a session management (SM) request.

12. The TE of claim 9 , wherein the backoff timer status information comprises a backoff timer value, a residual timer value, or a barring status.

13. The TE of claim 9 , wherein the backoff timer status information comprises at least one of a reattempt radio access technology (RAT) indicator, a reattempt public land mobile network (PLMN) indicator, a non-access stratum (NAS) signaling low priority indicator, a backoff timer type, a session management or EPS session management (SM/ESM) cause value, and an SM/ESM request.

14. The TE of claim 9 , wherein the backoff timer status information further comprises one or more SM/ESM procedures related to a backoff timer type or an SM/ESM cause value.

15. The TE of claim 14 , wherein one or all of three SM procedures ACTIVATE PDP CONTEXT REQUEST, ACTIVATE SECONDARY PDP CONTEXT REQUEST, and MODIFY PDP CONTEXT REQUEST are barred based on the backoff timer type or the SM/ESM cause value.

16. The TE of claim 14 , wherein one or all of three ESM procedures PDN CONNECTIVITY REQUEST, BEARER RESOURCE MODIFICATION REQUEST, and BEARER RESOURCE ALLOCATION REQUEST are barred based on the backoff timer type or the SM/ESM cause value.

17. A method, comprising:

receiving a first Attention (AT) command by a mobile termination (MT) from a co-located terminal equipment (TE) of a user equipment (UE) in a mobile communication network, wherein the first AT command is for querying backoff timer status information associated with an access point name (APN);

determining the backoff status information by the MT, wherein the MT transmits a response including the backoff timer status information to the TE; and

scheduling a second AT command associated with the corresponding APN based on the backoff timer status information such that the second AT command is not barred by the network.

18. The method of claim 17 , wherein the access point name is a specific access point name (APN) or a list of existing access point names (APNs).

19. The method of claim 17 , wherein the first AT command is for querying the backoff timer status associated with a session management (SM) request.

20. The method of claim 17 , wherein the backoff timer status information comprises a backoff timer value, a residual timer value, or a barring status.

21. The method of claim 17 , wherein the backoff timer status information comprises at least one of a reattempt radio access technology (RAT) indicator, a reattempt public land mobile network (PLMN) indicator, a non-access stratum (NAS) signaling low priority indicator, a backoff timer type, a session management or EPS session management (SM/ESM) cause value, and an SM/ESM request.

22. The method of claim 17 , wherein the backoff timer status information further comprises one or more SM/ESM procedures related to a backoff timer type or an SM/ESM cause value.

23. The method of claim 22 , wherein one or all of three SM procedures ACTIVATE PDP CONTEXT REQUEST, ACTIVATE SECONDARY PDP CONTEXT REQUEST, and MODIFY PDP CONTEXT REQUEST are barred based on the backoff timer type or the SM/ESM cause value.

24. The method of claim 22 , wherein one or all of three ESM procedures PDN CONNECTIVITY REQUEST, BEARER RESOURCE MODIFICATION REQUEST, and BEARER RESOURCE ALLOCATION REQUEST are barred based on the backoff timer type or the SM/ESM cause value.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 13, 2018
From: MEDIATEK INC.
To: HFI INNOVATION INC.
Reel/Frame 047068/0617 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 23, 2016
From: HUANG-FU, CHIEN-CHUN; LIN, YUAN-CHIEH; NIEMI, MARKO; JHENG, YU-SYUAN
To: MEDIATEK INC.
Reel/Frame 040132/0451 →
Continuity (2)
Provisional Application 62222962 · Sep 24, 2015
Related Publication 20170094603A1 · Mar 30, 2017