IP Library Granted Patent US 9,927,829
Granted Patent B2
US 9,927,829 · App. 15/279,757 · Granted Mar 27, 2018

Method and apparatus for phase-controlling a load

Inventors: Donald F. Hausman, Jr. (New Tripoli, PA); Robert C. Newman, Jr. (Emmaus, PA); Christopher J. Salvestrini (Allentown, PA)
Assignee: LUTRON ELECTRONICS CO., INC.
G05F5/00H02M5/297H05B33/0809H05B33/0815H05B39/048Y02B20/346
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,927,829
App. No.
15/279,757
Granted
Mar 27, 2018
Kind
B2
Abstract

A load control device may control the amount of power provided to an electrical load utilizing a phase control signal that operates in a reverse phase control mode, a center phase control mode, and a forward phase control mode. A load control device may be configured to determine that the electrical load should be operated via a phase control signal operating in a forward phase-control mode. After determining to operate the electrical load via the phase control signal in the forward phase-control mode, the load control device may provide the phase control signal in a reverse phase-control mode for a predetermined period of time to the electrical load, for example, to charge a bus capacitor of the electrical load. Subsequently, the load control device may be configured to switch the phase control signal to the forward phase-control mode and provide the phase control signal in the forward phase-control mode to the electrical load.

Claims (50)

1. A load control device comprising:

a controller configured to control an amount of power delivered from an alternating current (AC) power source to an electrical load, wherein at a transition of the electrical load from an off state to an on state, the controller is further configured to:

provide a first line cycle of a phase control signal, the first line cycle characterized by a first turn-on event and a first conduction time;

subsequent to providing the first line cycle, provide a second line cycle of the phase control signal, the second line cycle characterized by a second turn-on event and a second conduction time, the second turn-on event greater than the first turn-on event;

subsequent to providing the second line cycle, provide a third line cycle of the phase control signal, the third line cycle characterized by a third turn-on event and a third conduction time, the third turn-on event greater than the second turn-on event; and

maintain subsequent line cycles of the phase control signal in accordance with the third turn-on event;

wherein the first conduction time, the second conduction time, and the third conduction time are substantially the same.

2. The load control device of claim 1 , wherein the controller is further configured to:

determine to operate the electrical load using a forward phase control signal prior to providing the first line cycle of the phase control signal.

3. The load control device of claim 1 , wherein the first phase control signal charges a bus capacitor of the electrical load.

4. The load control device of claim 1 , wherein the first phase control signal is a reverse phase control signal.

5. The load control device of claim 1 , wherein the second phase control signal is a center phase control signal.

6. The load control device of claim 1 , wherein the third phase control signal is a forward phase control signal.

7. A load control device comprising:

a controller configured to control an amount of power delivered from an alternating current (AC) power source to an electrical load, wherein at a transition of the electrical load from an off state to an on state, the controller is further configured to:

provide a first line cycle of a phase control signal, the first line cycle characterized by a first turn-on event and a first RMS voltage value;

subsequent to providing the first line cycle, provide a second line cycle of the phase control signal, the second line cycle characterized by a second turn-on event and a second RMS voltage value, the second turn-on event greater than the first turn-on event;

subsequent to providing the second line cycle, provide a third line cycle of the phase control signal, the third line cycle characterized by a third turn-on event and a third RMS voltage value, the third turn-on event greater than the second turn-on event; and

maintain subsequent line cycles of the phase control signal in accordance with the third turn-on event;

wherein the first RMS voltage value, the second RMS voltage value, and the third RMS voltage value are substantially the same.

8. The load control device of claim 7 , wherein the controller is further configured to:

determine to operate the electrical load using a forward phase control signal prior to providing the first line cycle of the phase control signal.

9. The load control device of claim 7 , wherein the first phase control signal charges a bus capacitor of the electrical load.

10. The load control device of claim 7 , wherein the first phase control signal is a reverse phase control signal.

11. The load control device of claim 7 , wherein the second phase control signal is a center phase control signal.

12. The load control device of claim 7 , wherein the third phase control signal is a forward phase control signal.

13. A method for controlling an amount of power delivered from an alternating current (AC) power source to an electrical load by a load control device at a transition of the electrical load from an off state to an on state, the method comprising:

providing a first line cycle of a phase control signal, the first line cycle characterized by a first turn-on event and a first conduction time;

subsequent to providing the first line cycle, providing a second line cycle of the phase control signal, the second line cycle characterized by a second turn-on event and a second conduction time, the second turn-on event greater than the first turn-on event;

subsequent to providing the second line cycle, providing a third line cycle of the phase control signal, the third line cycle characterized by a third turn-on event and a third conduction time, the third turn-on event greater than the second turn-on event; and

maintaining subsequent line cycles of the phase control signal in accordance with the third turn-on event;

wherein the first conduction time, the second conduction time, and the third conduction time are substantially the same.

14. The method of claim 13 , further comprising:

determining to operate the electrical load using a forward phase control signal prior to providing the first line cycle of the phase control signal.

15. The method of claim 13 , wherein the first phase control signal charges a bus capacitor of the electrical load.

16. The method of claim 13 , wherein the first phase control signal is a reverse phase control signal.

17. The method of claim 13 , wherein the second phase control signal is a center phase control signal.

18. The method of claim 13 , wherein the third phase control signal is a forward phase control signal.

19. A method for controlling an amount of power delivered from an alternating current (AC) power source to an electrical load by a load control device at a transition of the electrical load from an off state to an on state, the method comprising:

providing a first line cycle of a phase control signal, the first line cycle characterized by a first turn-on event and a first RMS voltage value;

subsequent to providing the first line cycle, providing a second line cycle of the phase control signal, the second line cycle characterized by a second turn-on event and a second RMS voltage value, the second turn-on event greater than the first turn-on event;

subsequent to providing the second line cycle, providing a third line cycle of the phase control signal, the third line cycle characterized by a third turn-on event and a third RMS voltage value, the third turn-on event greater than the second turn-on event; and

maintain subsequent line cycles of the phase control signal in accordance with the third turn-on event;

wherein the first RMS voltage value, the second RMS voltage value, and the third RMS voltage value are substantially the same.

20. The method of claim 19 , further comprising:

determining to operate the electrical load using a forward phase control signal prior to providing the first line cycle of the phase control signal.

21. The method of claim 19 , wherein the first phase control signal charges a bus capacitor of the electrical load.

22. The method of claim 19 , wherein the first phase control signal is a reverse phase control signal.

23. The method of claim 19 , wherein the second phase control signal is a center phase control signal.

24. The method of claim 19 , wherein the third phase control signal is a forward phase control signal.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 24, 2019
From: LUTRON ELECTRONICS CO., INC.
To: LUTRON TECHNOLOGY COMPANY LLC
Reel/Frame 049286/0001 →
Continuity (3)
Division 13801522 · Mar 13, 2013
Provisional Application 61616460 · Mar 28, 2012
Related Publication 20170017255A1 · Jan 19, 2017