IP Library Granted Patent US 9,995,836
Granted Patent B2
US 9,995,836 · App. 15/290,533 · Granted Jun 12, 2018

Overboard system for deployment and retrieval of autonomous seismic nodes

Inventors: Arne Henning Rokkan (Olsvik, NO); Richard Edward Henman (Horsham, GB); Leif Johan Larsen (Alversund, NO); Johan Fredrik Naes (Trondheim, NO); Mariann Ervik (Trondheim, NO); Ole-Fredrik Semb (Tolvsrod, NO)
Assignee: Seabed Geosolutions B.V.
G01V1/3852B63B35/04G01V1/3843
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,995,836
App. No.
15/290,533
Granted
Jun 12, 2018
Kind
B2
Abstract

Embodiments of systems and methods for deploying and retrieving a plurality of autonomous seismic nodes from the back deck of a marine vessel using an overboard node deployment and retrieval system are presented. The overboard system may comprise one or more overboard wheels that are actively powered to move in response to changes in movement of the deployed cable. The overboard system may comprise a first overboard wheel with a plurality of rollers and a second overboard wheel configured to detect movement and/or changes in a position of the deployment line. The overboard system may be configured to move the first overboard wheel in response to movement of the second overboard wheel. In addition, the first overboard wheel may comprise at least one opening or pocket configured to hold a node while the node passes across the wheel. Other seismic devices may also pass through the overboard system, such as transponders and weights attached to the deployment cable.

Claims (22)

1. A method comprising

attaching a plurality of seismic nodes to a deployment line on a marine vessel;

deploying the deployment line across an overboard wheel, wherein the overboard wheel comprises a surface configured to receive the deployment line and attached plurality of seismic nodes, wherein the overboard wheel is powered to actively rotate or change its position;

positioning the overboard wheel relative to a vertical or horizontal plane by at least partially elevating, tilting, or retracting the overboard wheel; and

deploying the plurality of seismic nodes into a body of water after leaving the overboard wheel.

2. The method of claim 1 , wherein the surface is configured to prevent damage to the deployment line and attached plurality of seismic nodes during deployment or retrieval from the back deck of the marine vessel, wherein the plurality of seismic nodes are detachable from the deployment line.

3. The method of claim 1 , further comprising retrieving the deployed plurality of seismic nodes from the body of water over the overboard wheel.

4. The method of claim 1 , further comprising positioning the plurality of seismic nodes before reception by the overboard wheel.

5. The method of claim 1 , further comprising positioning the overboard wheel based on movement of the deployed deployment line.

6. The method of claim 1 , further comprising pivoting the overboard wheel in response to a force of the deployment line.

7. The method of claim 1 , further comprising pivoting the overboard wheel to minimize an external force on the overboard wheel.

8. The method of claim 1 , wherein the positioning step comprises tilting the overboard wheel.

9. The method of claim 1 , further comprising positioning the overboard wheel in response to a measured angle or tension of the deployment line.

10. The method of claim 1 , further comprising positioning the overboard wheel in response to one of a roll, yaw, or pitch of the marine vessel.

11. A method comprising

retrieving a plurality of seismic nodes from a body of water onto a marine vessel, wherein the plurality of seismic nodes are attached to a deployment line,

guiding the deployment line across an overboard wheel, wherein the overboard wheel comprises a surface configured to receive the deployment line and attached plurality of seismic nodes, wherein the overboard wheel is powered to actively rotate or change its position; and

detaching the plurality of seismic nodes from the deployment line after leaving the overboard wheel.

12. The method of claim 11 , further comprising positioning the overboard wheel based on movement of the deployed deployment line.

13. The method of claim 11 , further comprising pivoting the overboard wheel in response to a force of the deployment line.

14. The method of claim 11 , further comprising positioning the overboard wheel in response to a measured angle of the deployment line.

15. The method of claim 11 , further comprising pivoting the overboard wheel around a vertical or horizontal plane of the overboard wheel.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 6, 2023
From: SEABED GEOSOLUTIONS B.V.
To: PXGEO UK LIMITED
Reel/Frame 065462/0086 →
Continuity (4)
Continuation 15227411 · Aug 3, 2016
Continuation 14820285 · Aug 6, 2015
Provisional Application 62034620 · Aug 7, 2014
Related Publication 20170031046A1 · Feb 2, 2017