IP Library Granted Patent US 10,985,355
Granted Patent B2
US 10,985,355 · App. 15/297,686 · Granted Apr 20, 2021

Method for producing functional film, control device, and control method

Inventors: Jian Wang (Daegu, KR); Rikuri Uejima (Niihama, JP)
Assignee: SUMITOMO CHEMICAL COMPANY, LIMITED
H01M2/1686H01M2/145H01M2/1653H01M10/052
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,985,355
App. No.
15/297,686
Granted
Apr 20, 2021
Kind
B2
Abstract

A coating amount is adjusted based on a result of the inspecting step, then the coating amount is not adjusted during a standby period (Wt) which is a time taken to transfer the film from a coating section ( 21 ) to an inspecting section ( 26 ), and then the coating amount is adjusted based on the result of the inspecting step after the standby period has elapsed. With the configuration, an amount of a coating layer on a film base material is stabilized.

Claims (33)

1. A method for producing a functional film comprising:

passing a first portion of a film base material through a coating section such that a first amount of coating material is applied on the first portion of the film base material;

processing the applied coating material in a processing section located downstream of the coating section, the processing section including: a drying section configured to dry the coating material on the film base material; and at least one section selected from the group consisting of (a) a solidifying section configured to solidify the coating material on the film base material and (b) a washing section configured to wash the film base material and the coating material on the film base material;

passing the first portion of the film base material through an inspecting section located downstream of the processing section, the inspecting section measuring the first amount of coating material on the first portion of the film base material;

adjusting, by a control device based on the measurement of the first amount of coating material by the inspecting section, operation of the coating section such that a second amount of coating material is applied to a second portion of the film base material upstream of the first portion of the film base material; and

waiting, by the control device, for at least a standby period before making a subsequent adjustment to operation of the coating section, the standby period being based on a time for the second portion of the film base material to enter the inspecting section from the coating section.

2. The method as set forth in claim 1 , wherein the inspecting section obtains a physical quantity to measure the first amount of coating material.

3. The method as set forth in claim 2 , wherein the control device adjusts the operation of the coating section based on whether the physical quantity measured by the inspecting section crosses a threshold.

4. The method as set forth claim 2 , wherein:

the physical quantity is a weight per unit area or a thickness of the film; or

the physical quantity is a weight per unit area or a thickness of a part of the film excluding the film base material.

5. The method as set forth in claim 1 , wherein:

the coating section operates using a gravure coater method, and

the control device adjusts operation of the coating section by increasing or decreasing a rotation ratio of the gravure roll.

6. The method as set forth in claim 1 , wherein:

the coating section operates using a bar coater method, and

the control device adjusts operation of the coating section by increasing or decreasing an amount of a gap between a coating bar and the film.

7. The method as set forth in claim 1 , wherein:

the coating section operates using a die coater method, and

the control device adjusts operation of the coating section by increasing or decreasing a supplied liquid amount from a nozzle.

8. The method as set forth in claim 1 , wherein the functional film is a battery separator.

9. A control device for controlling a production apparatus for producing a functional film, wherein:

the production apparatus includes (i) a coating section for applying a coating material to a film base material, (ii) a processing section for processing the applied coating material downstream of the coating section, the processing section including: a drying section configured to dry the coating material on the film base material; and at least one section selected from the group consisting of (a) a solidifying section configured to solidify the coating material on the film base material and (b) a washing section configured to wash the film base material and the coating material on the film base material, and (iii) an inspecting section downstream of the processing section, the inspecting section being configured to measure an amount of coating material on the film base material;

the control device:

receiving, from the inspecting section, a measurement of a first amount of coating material applied to a first portion of the film base material by the coating section;

adjusting, based on the received measurement of the first amount of coating material by the inspecting section, operation of the coating section such that a second amount of coating material is applied to a second portion of the film base material upstream of the first portion of the film base material; and

waiting for at least a standby period before making a subsequent adjustment to operation of the coating section, the standby period being based on a time for the second portion of the film base material to enter the inspecting section from the coating section.

10. A method for controlling a production apparatus for producing a functional film, wherein:

the production apparatus includes (i) a coating section for applying a coating material to a film base material, (ii) a processing section for processing the applied coating material downstream of the coating section, the processing section including: a drying section configured to dry the coating material on the film base material; and at least one section selected from the group consisting of (a) a solidifying section configured to solidify the coating material on the film base material and (b) a washing section configured to wash the film base material and the coating material on the film base material, and (iii) an inspecting section downstream of the processing section, the inspecting section being configured to measure an amount of coating material on the film base material;

the method comprising:

receiving, by a control device from the inspecting section, a measurement of a first amount of coating material applied to a first portion of the film base material by the coating section;

adjusting; by the control device based on the received measurement of the first amount of coating material by the inspecting section, operation of the coating section such that a second amount of coating material is applied to a second portion of the film base material upstream of the first portion of the film base material; and

waiting, by the control device, for at least a standby period before making a subsequent adjustment to operation of the coating section, the standby period being based on a time for the second portion of the film base material to enter the inspecting section from the coating section.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 14, 2026
From: SUMITOMO CHEMICAL CO., LTD.
To: SSLM CO., LTD.
Reel/Frame 075590/0188 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 2, 2016
From: WANG, JIAN; UEJIMA, RIKURI
To: SUMITOMO CHEMICAL COMPANY, LIMITED
Reel/Frame 040492/0908 →
Priority Claims (2)
JP JP2015-209334 · Oct 23, 2015 · national
JP JP2016-202981 · Oct 14, 2016 · national
Continuity (1)
Related Publication 20170113247A1 · Apr 27, 2017